Council archive · source document
B07056.W-01A Complete - Stormwater [As Published] · 132007.2398
Concept Stormwater Management Plan RSL Care – Cooroy Retirement Village Stormwater runoff from areas external to the site, including part of the railway corridor and Cooroy Connection Road, discharge to the site at two locations. Runoff drains through existing gullies from each of these locations. The gullies are referred to as ‘northern gully’ and ‘southern gully’. The average grade of the northern gully is approximately 1.8% and the southern gully is approximately 3.5% as measured from the western boundary to the eastern boundary. Each gully leads to existing dams on the eastern side of the site. Both gullies discharge across the eastern boundary to neighbouring rural lots. The dams are referred to as ‘northern dam’ and ‘southern dam’. The existing scenario stormwater catchment plan is presented in Drawing No. B07056-SK01 of Appendix A. B07056.W-01A.doc Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B07056.W-01A Complete - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.