Original source · versioned page text
Geotechnical Report
LINDSAY CONSULTING PTY LTD - STRUCTURAL AND CIVIL ENGINEERS ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED AS TRUSTEE FOR THE LINDSAY FAMILY TRUST No groundwater was observed during the testing or inspection of the site, however, possible seasonal water tables or seepage may be possible along the unweathered rock layer. STABLITY CONSIDERATIONS The level of excavation intended over the site leads Lindsay Consulting Pty Ltd to believe that the stability of the site will be suitable for this type of construction. There were no signs of instability on the allotment. The location of the pool on this slope does not in our opinion lead us to believe that slope stability will be a concern. DUE TO THE NATURE OF THE SITE, ORGANIC PEAT MATERIAL OVER LOOSE SANDS LINDSAY CONSULTING PTY LTD RECOMEND THE PROVISION OF SCREW PILES INTO THE DENSE SAND MATERIALS UNDER. A landslip Hazard Frequency analysis has been carried out for the site and the proposed works, refer Appendix E, and we conclude there is a low risk of site instability with the pool located in its proposed location. The low risk of instability as defined in the guidelines in the attached appendix does not exclude slope stability problems, only that in Lindsay Consulting Pty Ltd’s opinion that the risk is low and may be management through good hillside practises. In our professional opinion, the present site conditions along with the proposed earthworks detailed on the drawings specified previously do not pose a slope stability issue with the site including associated buildings and infrastructure and that the stability of the site will be maintained during both the construction and operational life of the development. As such the works proposed, when carried out in a capable manner will not lead to a slope stability problem. Lindsay Consulting Pty Ltd further certifies that at the time of this report there were no signs of stability issues with adjoining lands and as such the site is not subject to risk of landslip activity originating from these other land. Lindsay Consulting Pty Ltd clarify this statement in that any adjoining works or changes to existing works on adjoining lands must be carried out in a professional manner and in accordance with good hillside practices so as to not affect the stability of the adjoining land which may inturn affect the stability of the subject allotment. Should you require any further information please do not hesitate to contact me at the above address. On and Behalf of LINDSAY CONSULTING PTY LTD Jason Lindsay RPEQ Off. 2C/82 Parker St, Maroochydore 4558 OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118 E-MAIL: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.