Information Request MCU23 0090
• Cut materials are to be removed by hand, using minimal, or the smallest power tools suitable for the
task without overcuts.
• Retain the removed materials for storage on site where proposed for reuse or retention. Ensure they
are clearly labelled with their original location. Materials from each area must be stored and labelled
separately. Ensure materials from different parts of the building are not mixed.
• Leave old foundations, slabs etc. Do not disturb support to foundations. Provide protection with
materials, such as sheeting, that are self-supporting and are not fixed to the original materials.
• Protect exposed areas of foundations
• Leave partly demolished structure(s) in a stable condition, with adequate temporary support at each
stage to prevent risk of uncontrolled collapse. Adequately protect parts of existing structure which are
to be kept in place.
• Stop construction work that might affect an historic item or material and protect the item from damage
or disturbance.
Site staff responsible for supervision and control of the work are to be experienced with historic buildings
and are to ensure that all personnel on site are briefed on heritage significance of the site, their
responsibilities with regard to this, and the conditions of the approvals under which the work is carried out
(see above). Any sub-contractors engaged in the works should be suitably qualified and properly inducted
in regard to the site’s heritage issues as well.
Before starting work:
• Prepare a full photographic record of all existing defects and damage to the building fabric adjacent to
the work areas, and routes to work areas, internally and externally.
• Take samples of mortar and render for testing
Information Required
19. Provide a detailed work method for demolition of historic fabric generally consistent with
the sample method detailed above.
Issue – Landscaping
The architectural plans provided with the application material indicate a 2 metre landscape
setback, however the submitted concept landscape plans have not provided details of the
landscape associated with the Poinciana, Diyan and Blakesley Street frontages.
Information Required
20. Provide revised concept landscape plans that deliver further details including
dimensions a concept landscape layout that includes tall trees shrubs and
groundcovers. Incorporation of tall single stemmed trees such as Corymbia tessellaris
that allow for views to the river, provide scale to the built form, and replaces the loss of
significant trees within the site is encouraged. (Undergrounding power along Diyan
Street would be beneficial in achieving landscape with tall trees that allow for
unobstructed views to the river)
Issue – Existing Landscaping
The submitted concept landscape plans has identified areas of existing landscape to be
retained.
Information Required
21. Provided revised concept landscape plans that identifies areas of existing landscape to
be refurbished and incorporate concept landscape plans for these areas that includes
the establishment of trees shrubs and groundcovers to assist in the scaling and buffering
of the built form.
22. Provide an overall concept landscape plan that calculates the total percentage of the
site proposed to be landscaped