Council archive · source document
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 28 , Authority to Lodge Letter, DTMR Response letter · OPW11/0121
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part I Of ^--
Application number: C-) R\p I /c)a
C\Documents and Smings'eje\Desktop\Muhi Pan Record Cover Shed NEXT PART (3)doc
0 8 APR 2011
Maroochydore
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
SUPERIOR
Jetties
6 April 2011
Development Counter
Assessment Division
•.
0 8 APR 2011 A
Jam:.;:
Sunshine Coast Regional Council
PO Box 141
Tewantin
Maroochydore
Qld 4565
Dear Sir/Madam,
RE: Proposed Pontoon & Gangway
I Quamby Place, Noosa Heads
Lot 0 on BUP 4192
(6132 Sun Lagoon CTS 10991)
Please find attached our application for a Prescribed Tidal Works Approval to be
issued by Council for the above location.
Thank you for your assistance with this matter.
Sincerely,
Jackie Hogan
Engineering Department
15 Jade Drive Nerang
PO Box 920 Nerang
l t l +617 5594 8200
Queensland Australia 4211
Atlas Marine International Pty Ltd
l ^ +617 5594 8222
lel info(alsuperiorjetties.com
trading as Superior Jetties ACN 100 384 254
www.superiorjetties.com ABN 94 100 384 254
Page 3
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) SUN LAGOON CTS 10991
For companies, contact name c/- APPROVALS COORDINATOR - SUPERIOR JETTIES
Postal address PO BOX 920 - NERANG - QLD - 4211
Contact phone number 07 5594 8200
Mobile number (non-mandatory)
Fax number (non-mandatory) 07 5594 8222
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
q building work
® operational work Development Counter
q reconfiguring a lot
0 8 APR 2011
MaroochYdore
Page 4
2. What type of approval is being sought?
® development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
Z No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No
No. No. suburb/locality name code and plan no.
QUAMBY PLACE, NOOSA
1 1 4567 0 BUP 4192 SUNSHINE COAST
HEADS
q Street address / lot on plan
® Street address / lot on plan for the and adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
N/A
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 PRIVATE RESIDENCES
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
PONTOON FOR PRIVATE USE
App,;, Details - IDAS form 1
Version 1 0 18 December 2009
Page 5
^r---ir-n
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
® No
q Yes - complete either table D, table E or table F as applicable
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
Name of local government for the tidal area Port authority for the tidal area
Table J
(if applicable) (If applicable)
SUNSHINE COAST
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
®No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 QUEENSLAND TRANSPORT CONCURRENCE mail
Appir- :n D IDAS form 1
Version 10 18 December 2009
Page 6
2 I REGISTERED PLAN mail
3 ENGINEER CERTIFIED DRAWINGS mail
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave,qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
IDAS form
Version 1 0 18 December 20(
Page 7
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To: building work referred to in this application.
Date of BSA Certification Building
Name license number classification/s
engagement
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
IDAS form 1
Version 10 18 December 2009
Page 8
Development Counter
0 9 APR 2011
Maroochydore
TO WHOM IT MAY CONCERN
AUTHORITY TO LODGE MARINE BERTHING APPLICATIONS
As the registered owner of the property described below, I hereby authorise Superior
Jetties to lodge any applications associated with the required approvals for a marine
structure adjacent to the specified land and to make any required enquiries in regard to
such applications on my/our behalf.
Address of Property:
Su n L.4 cow t^vaw^ b
...........................t.................. ^CtC-Q
.....................Post 4 cc1
Code:....................
I^ocnS^ ^
Lot Number:......
................... Plan Number:........... ^......1. 1..^....( . .
Registered Owner:
FULL COMPANY NAME:... S V h `-^'^ ....O ...............
1
....................
COMPANY ACN :............................................................................................ .
I Y1...............................................
FULL NAME OF AUTHORISED OFFICER:....... .SUz.CSO N
POSITION OF AUTHORISED OFFICER:.a.^ fin..^ CDY^^`^Gt^^-
1- ..:.......... ...... .......
SIGNATURE OF AUTHORISED OFFICER:......
DATE:. $..Y..^2CD-YYt'^t,^
............... a0 t 0
Authority to Act - (Company) 2009
Page 9
Prescribed tidal work - IDAS form 28
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications you must:
• complete Application details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sus finable Planning Act 2009 orlhe Sustainable planning
Regulation 2009. Developrneu uountcr
t
1. What type of approval is sought?
APR 2011
® development permit
q preliminary approval Maroochydore
2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)
Private use Non-private use Estimated value of completed works ($)
q jetty, pier or wharf
q mooring pile
q deck or boardwalk
q boat ramp or spillway
pontoon
q revetment, sea wall or retaining wall
q other - please specify below
3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?
® No q Yes
4. Has a registered professional engineer of Queensland (RPEQ), or an Interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)
q No ® Yes - provide details below
Page 10
Engineers name/s MARK WICHLINSKI
Organisation name (if applicable) MARK WICHLINSKI CONSULTING ENGINEERS
Postal address c/- PO BOX 920 - NERANG - QLD - 4211
Contact phone number cl- 07 5594 8200
Fax number (non-mandatory) c/- 07 5594 8222
e-mail address (non-mandatory)
RPEQ number (or equivalent if
RPEQ 1643
interstate)
Reference number of all plans to which this certification relates 6132 - D01, D02, D03, D04, D05
5. Confirm the following mandatory supporting information accompanies this application
Plans certified by a registered professional engineer of Queensland
Confirmation of Method of
(RPEQ) (or an interstate or international equivalent registered with
lodgement lodgement
the appropriate professional body) showing:
the location (real property description and boundaries) and dimensions
of the proposed works in relation to the land (including tidal land) that ® confirmed mail
would abut or adjoin the proposed works
the proposed works in relation to the locations and levels of lowest
astronomical tide, highest astronomical tide, mean high water springs ® confirmed mail
and the coastal management district
the slope angles of the beds and banks of the tidal area and the finished
levels of the proposed works q confirmed
Written statements or evidence
a copy of the certificate of title for the land (including tidal land) that q confirmed
would abut or adjoin the proposed works
details of how the proposed work addresses the IDAS code for
prescribed tidal work in the Coastal Protection and Management q confirmed
Regulation 2003, schedule 4A
firmed
® confirmed
details of the largest vessel, if any, to be moored at the structure mail
q not applicable
evidence that the proposed work will not prejudice the access rights of
adjoining property owners in the form of:
confirmed mail
• letters of support from adjoining property owner; or
• plans illustrating a water allocation area.
For applications within a cul-de-sac, a bend in the waterway or
other location where the side boundaries of the lot connect to the
work and neighbouring lots are not at right angles to the waterway
must also provide:
photos of any constructed neighbouring structures or information about q confirmed
approved but unconstructed neighbouring structures. ® not applicable
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this form.
tda; .. IDAS form 23
1 1.0 18 Decenibe, 2069
Page 11
Queensland
IV Government
23 March 201 1
Development Counter
Superior Jetties
PO Box 920
0 8 APR 2011
Nerang Qld 4211
Dear Sir
Operational Work, Prescribed Tidal Works - Request for comments
Pontoon - Sun Lagoon Resort, 1Quambay Place, Noosa Heads (Lot 0 on B1P4192)
Thank you for your letter of 22 February 2011 about your proposal to construct a pontoon at the
location mentioned above.
As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.
1. The contractor must build the pontoon according to Superior Jetties, Drawing No6132-D0I, dated
10 February 2011
2. No part of the structure or any ship berthed at this structure is to come closer than I .metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.
3. The pontoon and all freestanding piles must be lit and clearly v isible to approaching vessels. The
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.
4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.
5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.
Department of Transport and Main Roads Our ref 215100003(2) P2650-MOM P4059-MOM F25
Maritime Safety Queensland Your ref
Marine Operations (Brisbane) Enquiries James O'Connor
MacArthur Avenue East Telephone +61 7 3860 3504
Pinkenba Queensland 4008 Facsimile «61 7 3860 3571
Website www msq qld gov au
Email lames b o'connor©msq.gld gov au
Page 12
6. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
Any ships and equipment you or your agent use must comply with the Transport Operations
'Marine Se Jett, .ict 1991, the Transport Operations t.tlarine Sctfen•i Regulation 2004 and the
Transport Operations 'Marine Pollution, Act 1995
8. Any ships using this structure must comply w ith the Transport Operations t.tlarine Safett•) .- !
1994 and the Transport Operations t tlarine Safett, Regulation 2004.
9. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.
10. Any ship, dry berth or dek ice (including Air Lifting Pontoons) berthed, moored or attached to the
pontoon must not exceed the folloss ing sizes:
Wet Berth Dry Berth
Length O%erall - 7 metres NA
Beam - 2.6 metres
I I . The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
Used in these records
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 28 , Authority to Lodge Letter, DTMR Response letterRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.