Att 1 - RFI Amended SWMP
23098 - SBSMP/3
Page 14
6.3 Operational Phase
Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy 2017
(SPP 2017) should be achieved by identifying and adopting best practise techniques in accordance
with the abovementioned guidelines. Refer to Table 6-3 for the target WQO’s.
Table 6-3 – Minimum Mean Annual Load Reductions
Minimum Mean Annual
Contaminant
Load Reductions
Total Suspended Solids (TSS) ≥ 80%
Total Phosphorus (TP) ≥ 60%
Total Nitrogen (TN) ≥ 45%
Gross Pollutants (GP) ≥ 90%
6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6-4.
Table 6-4 - Sources of Contaminants
Pollutant
Target Pollutant Type Acceptable Treatment Examples
Size
Primary Screening of gross Litter baskets, swales, buffer strips,
>5000um
Pollutants pollutants GPT’s, underground detention
Sedimentation of
Secondary 125um -
coarse to medium Swales, sedimentation basins, ponds
Pollutants 5000um
sediment
Underground detention, constructed
Enhanced
10um – wetland macrophyte zones, other bio
sedimentation of fine
125um technologies, proprietary tertiary
particulates
stormwater treatment dvices
Tertiary Adhesion and filtration Constructed wetland macrophyte zones,
0.45um –
Pollutants of very fine / colloidal other bio technologies, proprietary
10um
sediment tertiary stormwater treatment dvices
Biological uptake of Constructed wetland macrophyte zones,
<0.45um
dissolved particles other bio technologies
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.