Original source · versioned page text
Att 1 - RFI Amended SWMP
Our Ref: 23098/WB Your Ref: MCU21/0117.01 Monday, 18 March 2024 Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Andrew Gaffney RE: Information Request Response Proposed Townhouse Development at No 5 Pearl Street, Cooroy In reply to the information request issued by Noosa Council on 11 March 2024, we provide the following information and response: Item 1: Provide a revised SMP that incorporates a rainfall intensity increase of 20% and sea level rise of 800mm to allow for climate change impacts in accordance with AO2.4 and corresponding Performance Outcome 2 of the Water Quality and Drainage Code. Response: Refer to the updated Site Based Stormwater Management Plan (23098 – SBSMP – Rev 3) which incorporates a detention tank volume increase of 20% from 27.5kL to a maximum storage volume of 33.0kL to account for the provision of climate change in accordance with Noosa Shire Council’s Water Quality and Drainage Code, as requested. As the subject site and proposed infrastructure is not in a tidal/flood risk area, it is expected that the 800mm to allow for sea level rise is irrelevant in this instance. Item 2: Provide a revised SMP that analyses a more appropriate rainfall data source for the development site. It is noted that the previous SMP prepared by RECOR used station 40059 Cooroy Composite. Response: Refer to the updated Site Based Stormwater Management Plan (23098 – SBSMP – Rev 3) incorporating the rainfall station 40059 Cooroy Composite, as requested. Please contact me if you have any further queries on (07) 3369 8411. Yours faithfully, MORGAN CONSULTING ENGINEERS PTY LTD Henry Morgan MIEAust CPEng RPEQ 11950 Enclosed: 23098 – SBSMP – Rev 3 D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Correspondence\Letters\23098_RFI Reponse.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.