Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                    Solution1                     Comments                                      Council Use

                                                   AO4.5                                                                RO4.5
                                                   Stormwater infrastructure is designed to                             The proposal complies.
                                                   minimise maintenance costs and the                         ✓
                                                   requirement for specialized equipment for
                                                   maintenance techniques.
PO5                                                AO5.1
Stormwater drainage infrastructure is              Stormwater drainage infrastructure avoids
aligned to avoid crossing waterways,               crossing waterways, wetlands drainage lines               N/A
wetlands, drainage lines and ecological            and ecologically important areas or follows the
important areas, or where it is demonstrated       edge of existing disturbed areas.
this is unavoidable, disturbed areas are           AO5.2
reinstated and revegetated upon completion         Stormwater drainage infrastructure avoids
of works.                                          crossing waterways, wetlands drainage lines               N/A
                                                   and ecologically important areas or follows the
                                                   edge of existing disturbed areas.
                                                   AO5.3
                                                   Temporary vehicular crossings of waterways
                                                   must be designed and constructed to be                    N/A
                                                   consistent with the current International
                                                   Erosion Control Association Best Practice
                                                   Book Series.
Stormwater quality and protection of receiving waters
PO6                                                AO6.1                                                                RO6.1
Development is located, designed,                  Stormwater runoff discharging into High                              The proposal complies.
constructed and operated to protect and            Ecological Value waters as a result of
enhance environmental values and water
quality of waterways, wetlands, lakes,
                                                   development causes no increase in gross
                                                   pollutants, total suspended solids, total
                                                                                                              ✓
ground waters and drainage systems.                phosphorous or total nitrogen compared to
                                                   a pre-development scenario.
Editor’s note: Environmental values of
waters and water quality objectives are            AND
prescribed in Schedule 1 of the                    AO6.2                                                                RO6.2
Environmental Protection (Water) Policy            All stormwater runoff is treated to achieve                          The proposal complies. A bio-
2009 and are identified on the State               maximum removal of nutrients, gross                                  retention system will be incorporated
Planning Policy Interactive Mapping System         pollutants and suspended solids as determined                        into the drainage design to achieve

1
    Solution:   ✓      Acceptable Solution                                                                                                                                                       Page 3 of 10
                A/S    Alternative Solution                        \\mcedc01\DATA\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                  Job: 23098
                                                                                                                                                                                                       Rev:      1
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                 18/03/2024
Log in to download the original file

Att 1 - RFI Amended SWMP.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.