Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
Healthy Waterways Water by Design (version
current at the time of development
application).
PO12 AO12.1
Development protects in-stream ecology by Where run-off from or within the site passes
maintaining pre development low flow through or drains to natural channels,
discharge regimes and maintaining fish waterways or wetlands, development protects
passages. in steam ecology by maintaining pre-
development low flow discharge regimes in N/A
accordance with the frequent flow
management objectives in PSP6 Engineering
Design Standards - Roads, drainage and
earthworks
AO12.2
Instream structures such as roads, bridges,
culverts, and other stormwater infrastructure N/A
do not cause barriers to fish passage and
facilitate the movement of terrestrial and
aquatic fauna along waterway corridors
AO12.3
Benthic substrate retains a continuous grade
with the direction of flow consistent with the N/A
natural bed profile.
PO13 AO13.1
Development is designed and constructed to The location and form of stormwater discharge
maintain surface and ground water balances points do not alter the pre-development N/A
that sustain the environmental values of hydrology of receiving surface water or
water dependent ecosystems, including groundwater.
downstream aquatic, riparian, wetland and AO13.2
terrestrial ecosystems. Developments located on groundwater
recharge or discharge areas are designed and
managed in accordance with a groundwater
recharge and discharge management plan
prepared by a suitably
experienced and qualified groundwater
hydrologist. The groundwater recharge or
1
Solution: ✓ Acceptable Solution Page 7 of 10
A/S Alternative Solution \\mcedc01\DATA\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 1
Site Address: 5 Pearl Street, Cooroy 18/03/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.