Att 1 - RFI Amended SWMP

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                   Solution1                     Comments                                      Council Use

                                                      waterways , wetlands or drainage lines
                                                      either on or off the site; and
                                                 (c) temporary or permanent downpipes are                   ✓
                                                      connected to the stormwater system
                                                      before laying the roof; or
                                                 (d) localised erosion is avoided by directing
                                                      flow from downpipes over non-erosive
                                                      areas.
                                                  AO14.4                                                              RO14.4
                                                  Chemical flocculants used as part of an                             The proposal complies. Refer to
                                                  erosion and sediment control plan do not harm             ✓         RO14.1.
                                                  the environmental values within receiving
                                                  waters.
                                                  AO14.5                                                              RO14.4
                                                  Appropriately sized litter containment areas,                       The proposal complies. Refer to
                                                  with provision for sorting recyclables are                ✓         RO14.1.
                                                  provided for the type of litter expected to be
                                                  generated onsite.
Wastewater management and effluent disposal
PO15                                              AO15
Development does not discharge                    Wastewater (non-sewage) generated from the
wastewater unless it can be demonstrated to       development is collected and contained on-
not compromise environmental values of            site, and is;
waters and water quality objectives.             (a) lawfully disposed to sewer; or
                                                 (b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of                  to an appropriately
waters and water quality objectives are                licenced facility;
prescribed in Schedule 1 of the                  (c) reused on-site in a closed-cycle irrigation
Environmental Protection (Water) Policy                scheme, industrial processes, washing or
2009.                                                  cleaning or other purpose; or                       N/A
                                                 (d) treated to meet the drinking water supply
                                                       environmental values prior to release.

                                                  Editor’s Note—The Plumbing and Drainage
                                                  Act 2003 sets out requirements for wastewater

1
    Solution:   ✓     Acceptable Solution                                                                                                                                                      Page 9 of 10
                A/S   Alternative Solution                       \\mcedc01\DATA\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      1
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               18/03/2024
Log in to download the original file

Att 1 - RFI Amended SWMP.pdf · 6.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.