Original source · versioned page text
Att 1 - RFI Amended SWMP
23098 - SBSMP/3
Page 2
Table of Contents
1 INTRODUCTION ............................................................................................ 3
2 EXISTING SITE.............................................................................................. 4
2.1 The Site ................................................................................................ 4
2.2 Surrounding Area ...................................................................................... 4
3 PROPOSED DEVELOPMENT ............................................................................... 5
4 EXISTING DRAINAGE PATTERNS ......................................................................... 6
4.1 Existing Infrastructure ............................................................................... 6
4.2 Existing Drainage Patterns ........................................................................... 7
4.3 Lawful Point of Discharge............................................................................ 7
5 STORMWATER QUANTITY................................................................................. 8
5.1 Rational Method Assessment ........................................................................ 8
5.1.1 Design Storms ....................................................................................8
5.1.2 Rainfall Intensity ................................................................................8
5.1.3 Times of Concentration .........................................................................8
5.1.4 Runoff Coefficients ..............................................................................8
5.1.5 Peak Flows ........................................................................................9
5.2 Proposed Development Drainage ................................................................... 9
5.3 XPSTORM Modelling ................................................................................... 9
5.3.1 Intensity Frequency Distribution ..............................................................9
5.3.2 Initial and Continuing Losses ................................................................. 10
5.3.3 On-site Detention.............................................................................. 10
5.3.4 Comparison of Peak Flows at Lawful Point of Discharge ................................. 10
6 STORMWATER QUALITY ................................................................................ 12
6.1 State Planning Policy Assessment ................................................................ 12
6.2 Construction Phase ................................................................................. 12
6.3 Operational Phase .................................................................................. 14
6.3.1 Sources of Contaminants ..................................................................... 14
6.3.2 Proposed Treatment Train ................................................................... 15
6.3.3 Pollutant Export Modelling ................................................................... 15
6.3.4 MUSIC Modelling Parameters ................................................................. 15
6.3.5 MUSIC Modelling Results ...................................................................... 16
7 FLOODING ................................................................................................ 18
8 CONCLUSION ............................................................................................. 19
Appendix A DETAILED SITE SURVEY ........................................................................ 20
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 21
Appendix C NSC INTERACTIVE MAPPING PLANS .......................................................... 22
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 23
Appendix E RATIONAL METHOD CALCULATIONS ......................................................... 24
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLANS .............................................. 25
Appendix G BOM IFD ......................................................................................... 26
Appendix H XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 27
Appendix I XPSTORM POST DEVELOPMENT RESULTS .................................................... 28
Appendix J XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 29
Appendix K STORMWATER QUALITY OPERATION AND MAINTENANCE GUIDELINES .................. 30
Appendix L NSC FLOOD HAZARD OVERLAY MAP .......................................................... 31
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.