Att 1 - RFI Amended SWMP
23098 - SBSMP/3
Page 6
4 EXISTING DRAINAGE PATTERNS
4.1 Existing Infrastructure
Data obtained from the NSC Interactive Mapping plans and detailed site survey indicate the
following existing drainage infrastructure:
1. Swale drain traversing the northern verge of Pearl Street, south of the site;
2. Swale drain traversing the eastern verge of Elm Street, west of the site;
3. A 300mm dia. to 600mm dia. stormwater line traversing the southern verge of Pearl Street,
south of the site; and
4. A 1350mm dia. to 1800mm dia. stormwater line traversing the eastern boundary of 11 Pearl
Street, east of the site.
Refer to Figure 4.1 for the existing stormwater infrastructure and drainage patterns and Appendix
C for the Noosa Council Interactive Mapping Plans.
N
Subject Site
Ø 1350
Elm Street
Ø 375
Ø 1800
Legend
Pearl Street
Sheet Flow Path
Stormwater Line Ø 300
Stormwater Pit Ø 600 Ø 750
Swale Drain
Headwall
Figure 4.1 – Existing Drainage Paths & Infrastructure
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.