RFI Eng response notice items 4-19 MCU150111

Attached to the e-mail MCU15/0111 Response to information request - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy - email 1 of 2.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Calibre Consulting (Qld) Pty Ltd
Ground Floor, 545 Queen Street
Brisbane QLD 4000
PO Box 10349 Adelaide Street
Brisbane QLD 4000
T +61 7 3895 3444
ABN 38 109 428 506




Our Ref: B14158.W.10A - Response to RFI.docx
Your Ref: MCU15/01111
Contact: Andrew McPhail




5 February 2016


Noosa Council
9 Pelican St Tewantin
Qld 4565


Attention: Dennis Wallace


Dear Dennis

Palm Lake Retirement Village
Information Request Response – Selected Items
Material Change of Use Application: MCU15/0111

Calibre Consulting (QLD) has prepared various Stormwater Management Plans for this site. The current MCU application
was supported by report B14158-03A Dated 12 November 2015.

This letter is in response to Council’s Information Request dated 21 December 2015 for the Palm Lake Retirement Village
Development Application. This letter specifically addresses engineering items (Items 3 through to 19). Responses are
based on new analysis and discussions with council offices on 13 Jan 2016.

Item 3. Submit a Waste Management Plan in accordance with Noosa Planning Scheme Policy 11 – Waste
Management Plans. The Plan must demonstrate how the proponent will comply with Noosa Planning Scheme
Policy 9 – Waste Management. The plan must also address refuse truck accessibility and turning paths within
the site in compliance with Council’s requirements.

Our Response

Calibre Consulting has prepared an engineering drawing (attached 15-001261 sheet SK114) indicating turning paths for
the street layout over the site. Further details concerning the Waste Management refer to Palm Lake Works.


Item 4. Provide updated survey plan encompassing the entire development site and any relevant features and
survey data external to the site.

Our Response

Calibre Consulting has prepared drawings (attached 15-001261 sheets SK110 to SK113) indicating the existing survey of
the site compiled from various survey sources.




calibreconsulting.co
Log in to download the original file

RFI Eng response notice items 4-19 MCU150111.pdf · 9.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 25 pages

Page 2

                                                                                                                       2 of 8




Item 5. Provide updated traffic report for the current proposal including any additional traffic generation
associated with the increased development on the site. The updated report should also investigate any the
required upgrade works on the external roads and road intersections in accordance with current applicable
standards and traffic data.

Our Response

Calibre Consulting has prepared a Traffic Impact Assessment Report No. B14158ER02 (attached) this report indicates:

    •    The additional traffic generation associated with the increased development on the site is 28vph during peak
         hour periods

    •    Based on the assessment of the network it is concluded that the road links and intersection arrangements as
         proposed will be able to accommodate the anticipated traffic volumes to at least the ultimate design year of
         2028. The forecast demand estimates are based on the ultimate development scenario as outlined above.

    •    The key finding of this traffic impact assessment is that the proposed intersection treatments and infrastructure is
         sufficient to support the proposed development, which was previously approved in the earlier site development
         approvals (Refer Council’s DA Ref No: 132007.2398.02). There are no adverse impacts anticipated as a result of
         the development traffic generated by the expanded developable site area. Based on the analysis there are no
         further mitigation measures proposed.

    •    The current level of design detail available for this DA phase shows that the proposed development layout is
         compliant with the relevant State Planning Codes.


Item 6. Provide information and updated drawing/s of the development site to indicate the proposed earthworks
and finish levels including but not limited to the following:
(a) Relevant cross sections and details to depict the extent and the changes to the surface levels.
(b) Any required earth retention works (eg retaining walls, batters) particularly for the eastern part of the site eg
near the proposed club house, proposed basins and the retained house and shed on proposed Lot 101.

Our Response

Calibre Consulting has prepared concept bulk earthwork drawings (attached 15-001261 sheets SK102 to SK106). These
plans indicate changes to surface levels and retaining walls.



Item 7
    (a) Stormwater runoff rates from the developed site must be maintain to its predevelopment rates for all
        storm events up and including 100 years storm event and taking into consideration the retention
        capacities of dams exist on site prior to the development works.

Our Response

Previous approved analysis for this site was undertaken for all return intervals and as per ARR 1987, that is modelling of
a range of storm burst. It was determined that for all Return Intervals the developed flows were below predevelopment
flow rates (refer Table 3-9 in report B14158.W-03A). It was assumed that storms prior to the peak storm burst have filled
the existing dams to their capacity. This is considered standard practice for flood studies.

As requested by Council further analysis was undertaken to assess possible impact of the volume of the dams. We have
compared the volume of dams (if empty) to the volume of the inflow hydrograph. Analysis has been diagrammatically
represented for the four (4) existing dams, for the 1 yr ARI and 100yr ARI critical storms, refer to attachments A and B.
Analysis has shown for a 1 yr ARI and 100yr ARI storm event the dam volumes equate to 1.1% and 0.4% of the inflow
hydrograph volume respectively. In reality the percentage will be lower as the dam will not be empty as the storm burst
commences. Therefore, the dams will be filled significantly before the peak site flow and have no impact on the existing
flow of the site.

Page 3

                                                                                                                      3 of 8




Therefore analysis methodology and results presented in the November 2015 report are appropriate.

    (b) The SWMP shall investigate the impact of the development on the existing drainage conditions on other
        properties, including road reserve and parks areas, and make recommendations for any necessary
        stormwater works and/or mitigation measures to ensure no adverse impact caused to other properties
        (reference is made to downstream Discharge Locations A and B on the submitted plans).

Our Response

The report shows that mitigated flows at discharge location A and B are below predevelopment levels (Refer Table 3-9 in
report B14158.W 03A) therefore there is no adverse impacts on other properties.

Please note that we are not changing the swale between the Central basin and Point B. Therefore only the same flow will
enter the Council reserve at Point B and swale banks will overtop in the current manner in higher events. At Point A we
will provide an energy dissipater and level spreader to ensure no concentration of the flows to the adjoining site.

Additional pipework is to be installed at the Trading Post Road cul de sac to ensure that flood conditions are not impacted
once the cul-de-sac is formed and adjacent gully filled.

As indicated in the attached DWG B14158.W-SK111 and SK110 Issue A, a stormwater drainage pipe will be constructed
from the cul-de-sac head to the Northern swale. This pipeline will convey at least the 1 in 20year ARI flow. This greater
than the Council standards. Flows in excess of the pipe system will be conveyed through the site. Final details subject to
detailed design.

    (c) All underground piped stormwater drainage must be designed to accommodate 5 years storm event with
        all overland flows be located with the roads and open space area and catering for 100 years storm event
        as minimum.

Our Response

Council’s request is acknowledged. This will be incorporated into future detail design drawings.

    (d) General plan/s showing the proposed stormwater system including pipe sizes and the overland
        secondary flow paths. Where possible, overland flow paths should be streamlined and sharp bends be
        avoided to alleviate the potential of breach and damage. The plan/s should also indicate any proposed
        external stormwater drainage works (eg stormwater drainage collection in Trading Post Road).

Our Response

The pipe system has been designed to comply with the site layout which is consistent with previous site approvals. As
discussed with Council on 13 January, the pipe systems will be designed for minimal overland flow at the sharp bends of
the pipelines. Additional pits will be incorporated upstream of bends so that there will be minimal overland flow. Refer to
Drawing B14158.W Sheets SK110 and SK111 for details.

Concept details of pipeline sizes downstream of basins have been indicated on the attached drawings.



    (e) All the necessary drainage easements on the site in Council’s favour where required.

Our Response

As discussed with Council on 13 January, minimal measures are required. Proposed stormwater easements are now
shown on drawings. Refer to Drawing B14158.W Sheets SK110 Issue A and SK111.

Page 4

                                                                                                                       4 of 8




    (f) Clarification regarding the depth of water in proposed basins during major storm events particularly for
        the central basin (reference is made to Table 3-10 of the SWMP) and any proposed safety measures.

Our Response

Council officers clarified their safety concern was regarding the Central Basin where the combined pond depth and
potential stormwater detention storage being approximately 3.7m.

The following safety measures have been incorporated into the basin design to minimise access to the ponded area:

•   Thick planting and safety bench around the perimeter of the pond to discourage entry into pond;
•   Retaining walls over 1m are to be fenced;
•   There are multiple points around the basin with batter slopes flatter than 1 in 5 to enable easy access out of the basin
    area; and
•   1 in 6 access track provided at the downstream end of the basin.

It is noted that maximum ponding has a low likelihood of occurring dying any year (1% Annual Exceedance probability)
The normal ponding area has measures to limit access or risk (dense planting and shallow benches).

We have prepared a Safety in Design review for the Central Basin, attached, to further demonstrate that safety matters
have been addressed.

Item 8. Remodel with consistent surface type and runoff parameters. Otherwise, provide justification with
previous acceptance by Council Officers for the disparity between the surface type and runoff input parameters.

Our Response

After additional review a minor error was identified that had no consequential impact on the design, the parameters for
catchment G2 are commercial when they should be residential.

The MUSIC model has been updated to reflect the proposed landuse and the proposed site layout Palm Lake Resort
Dwg C0-000-2014 Rev H (Attached)

Item 9 Update the MUSIC model to be consistent with MUSIC Modelling Guidelines. In particular, confirm default
values are used for the serial correlation.

Our Response

We can confirm that stochastic generation was used and that the serial correlation values were as per the MUSIC default
value (0). No action necessary.

Item 10 Revise the MUSIC model without the pond system included as at treatment node. Otherwise,
demonstrate how constituent loads within the waters entering the pond will be at concentrations that are
unlikely to cause an algal or cyanobacteria outbreak.

Our Response

As discussed with Council officer on 13 January, we believe that the standards quoted were not applied correctly. The
MUSIC Modelling Guidelines (Water by Design, 2010) state:

         “MUSIC is generally not suitable for modelling water quality treatment in natural waterways, natural wetlands,
         naturalised channel systems, environmental buffers, and lake and pond systems. These are receiving
         environments and cannot in any case form part of the stormwater treatment train for an urban catchment”.
         (underline added to highlight).

Page 5

                                                                                                                         5 of 8




The proposed central basin/water quality control pond (WQCP) is to be constructed and has an area of 2000m². The
WQCP is not a receiving environment. Council’s planning scheme identifies waterways/receiving environments
approximately 1.6 km downstream of this site. The WQCP is a site control and landscape feature.

Modelling of the pond was discussed with Mr Mircea Stancu from eWater, the company that developed the modelling
software. It was his view that ponds can legitimately provide stormwater treatment. This is evident by the fact that there is
a pond treatment node in MUSIC. He agreed that pre treatment before the pond is recommended.

An opinion was also sought from the Manager of Water by Design (author of the Guideline reference above) regarding a
receiving environment. It was his opinion that a receiving waterbody is a lake, river or bay that accepts stormwater
discharge and is the environment that we are seeking to protect. A small pond would not necessarily represent the
‘ultimate receiving water body’.

The Manager highlighted two potential concerns regarding ponds outlined below:

   – Where ponds are owned by Council there may be ongoing maintenance costs.
This, however, is not an issue as the pond will be owned by the developer and all maintenance costs would be borne by
the site operators.
   – The pond may experience a deterioration in water quality.

This is also not seen as an issue as the pond will receive significant pre-treatment to address water quality concerns. (A
copy of the correspondence is attached in Attachment C)

As indicated in report B14158.W-03A and attached drawings the majority of the catchment to the central basin will have
pre-treatment, either at the central or southern bio retention basins. Some local catchments (catchment F3) adjacent to
the control pond will not be pre-treated but this area is mainly landscaping.

Due to the high turn over in the WQCP (approximately 14 days for the 20th percentile) and high pre-treatment, the risk of
algal blooms and poor water quality is low. If low quality water is identified the site operator can follow practices outlined
in the Stormwater Management Construction and Maintenance Plan (B14158.W-09A).

It is our view that the proposed pond is a small site control and as such it should not be considered as part of the ultimate
receiving waterbody. Therefore as per discussions with eWater the pond can be considered as part of the treatment train.

Further MUSIC analysis shows that the pond only provides a small percentage of treatment (6% TSS, 7% TP and 1% TN
load reduction) and can be seen as the final polishing of stormwater only.

In conclusion we have not removed the WQCP from the model.

Item 11 Provide a Concept Maintenance Plan to be approved as part of the MCU. The Concept Plan must include
objectives for detail design as well as operation/maintenance of the Stormwater Treatment Train including all
end of line receiving waters on the site – such as the Pond. The Concept Maintenance Plan is to detail trigger
points to manage risks of algal or cyanobacteria blooms within the pond prior to an algal or cyanobacteria
outbreak occurring.

Our Response

As discussed with Council the requirement for a Concept Stomwater Construction Management and Maintenance Plan is
typically in relation to operational works application. Also the average turnover time for the pond water is approximately
14 days (20th percentile hydraulic Residence Time) as such there is reduced likelihood of cyanobacteria outbreaks
occurring.

However, as agreed the Concept Stormwater Construction Management and Maintenance Plan (Report No B14158W-
09A)) has been provided for further advice regarding management of potential algal blooms.

Page 6

                                                                                                                          6 of 8




Item 12 Provide calculations for “Developed site only with Mitigation”.

Our Response

It is our view that inclusion of external catchments in the MUSIC model provides a more accurate assessment of the
treatment performance. A revised version of Table 4-6 of Report B14158.W-03A is presented below. Note the MUSIC
model was revised to account for a change to carpark areas in Sub-catchment F5, as per Palm Lake Resort Drawing C0-
000-2014 Rev H.

From the Table below, the pollutant load reduction targets have been calculated for the developable area of the site.
MUSIC modelling indicates that the proposed treatment train provides a reduction of pollutant loads greater than what is
required. Since the load retained on site is in excess of the targets, the treatment train is considered to be meeting the
water quality objectives.

Table 4-6 MUSIC Modelling Results


 Description                                                                     Pollutant Load (kg/year)
                                                                     TSS            TP            TN                GP
 Developed Site Only (Without Mitigation)                           23200           57.3            406            3910
 WQOs (Percentage Reduction)                                         80%            60%             45%            90%
 Load Reduction Target                                              18560          34.38           182.7           3519
 Developed Site plus External Catchment (Without Mitigation)        29700          69.20            456            4150
 Developed Site plus External Catchment (With Mitigation)           10200          34.60            269             381
 Load Retention Achieved                                            19500           34.6            187            3769
 Load Retention Achieved as % of Developed Site Load                 84%            60%             46%            96%
 Water Quality Objective Achieved (SPP 4/10)                         YES            YES             YES             YES
 Developed Site without External Catchment (With Mitigation)        15370          29.10           177.0           3529




Item 13 To reduce pressure on the pond, demonstrate whether there is any opportunity to retrofit a water quality
treatment facility within the road reserve or other location within the development so that any activities on the
road system will not be attributed directly to any issues within the pond system.

Our Response

Flows are to be pre-treated prior to entering the central WQCP via bioretention basins. It appears that a flow split pit on
Drawing B14158.W Sheet SK101 was not recognised. This plan has been updated for clarity.

Item 14 Provide the Music Model and Auto Cad files or other mechanism to demonstrate that proposed nodes
and impervious areas are consistent with development plans.

Our Response

The areas of imperviousness was reviewed for each park node in the MUSIC model. The park node for catchment F3 has
15% imperviousness. The park nodes for catchments E1, F1, F2, F3, F5 have 0% impervious, however these catchments
are relatively small and do not need additional imperviousness as this area is captured in separate nodes. Refer attached
plan B14158.W Sheet SK112 which indicates areas of imperviousness.

Page 7

                                                                                                                       7 of 8




Item 15 Provide commentary to confirm that the Nodes proposed for the Bowling Green and Park will most
adequately represent the nutrient fluxes from those uses.

Our Response

The proposed bowling green is to be constructed with synthetic grass and has a roof. For the purposes of the MUSIC
model, the bowling green has been modelled as a roof.

As per the Stormwater Construction Management and Maintenance Plan, it is advised that landscaping areas directly
adjacent to the WQCP are not fertilized in order to minimise high nutrient runoff from entering the pond.

Item 16 Detail Invert Levels for outlet structures of all water quality treatment devices, along with surrounding
land surface levels to demonstrate that adequate fall is available for stormwater discharges.

Our Response

Invert levels have been added to the plans to show that there is adequate fall for all basin outlets. Refer attached
Drawings B14158.W Sheet SK103 and SK104.

Item 17 Demonstrate how the design of the bioretention basins, including location and heights of retaining walls
is consistent with the recommendations of the Water by Design Bioretention Technical Design Guidelines for
depth of filter media to surrounding areas and retaining wall heights.

Our Response

At the central bioretention basin the concept design plans for the site indicate a maximum wall height of 1.6m and 1.5m.
This is considered to be reasonable for such developments.

It is noted that the Water by Design Bioretention Design Guidelines recommend for wall heights exceeding 800mm that
multiple walls be used with a 3m wide terrace in between the walls. It is suggested that this is an onerous requirement
and not relevant where only one side of the bioretention basin is walled.



Item 18 Provide commentary regarding the functional consistency between proposed weir width details shown
on proposed detail design drawings and the MUSIC model weir width input data.

Our Response

The width of the weirs shown on plans are inconsistent with the MUSIC model. This issue has been corrected in MUSIC
model and has little impact on the results. All objectives have been achieved.



Item 19 Provide calculations in accordance with the Queensland Urban Drainage Manual to demonstrate that the
confluence of stormwater at the drainage easement will not cause scour and that any required dissipater/erosion
control can be contained wholly within the applicant’s property.

Our Response

We appreciate council’s concerns regarding scour protection. However it is possible that pipe network may change during
the detailed design phase. As such we would suggest that detailed calculations are provided to demonstrate scour risk
mitigation at the Operational Works phase. Please condition approval appropriately.

Page 8

Bofs

We trust the information provided in this letter is acceptable and satisfactorily responds to Council's Information Request
Items 3 through to 19.

Should you require any further information please do not hesitate to contact the undersigned on (07) 3895 3444,

Yours sincerely
Calibre Consulting

Andrew MéPhail
Principal Engineer

ATTACHMENTS

Attachment 1 Dam volume analysis
Attachment 2 Safety in Design
Attachment 3 Correspondence with Water by Design manager
Attachment 4 = Palm Lake Resort Drawing C0-000-2014 Rev H
Attachment 5 = Stormwater Construction Management and Maintenance Plan B14158.W-09A
Attachment6 Concept Drawings

B14158.W-SK100

B14158.W-SKi01

B14158.W-SK102

B14158.W-SK103

B14158.W-SK104

B14158.W-SK105

B14158.W-SK106

B14158.W-SK107

B14158.W-SK108

B14158.W-SK109

B14158.W-SK110

B14158.W-SK111

B14158.W-SK112

B14158.W-SK113

PARwnNa

Page 9

                                                                                                                                                            Attachment 1
15‐003352 ‐ Palm Lake, Cooroy
Existing 100yr ARI conditions (RAFTS Model) and influence of existing farm dams on catchment hydrology

                                                                     Site flows and Farm Dam fill times
                                    6




                                    5




                                    4
         100yr ARI Flows (cumecs)




                                    3




                                    2




                                    1




                                    0
                                        0             0.5                  1                      1.5                     2                   2.5                  3
                                                                                              Time (hrs)

                                            A2   B4   B3    C2       OUT       N Basin          Centre Basin       Centre South Basin      South Basin   TOTAL

                                                                                                               Centre South
Dam                                                         N Basin             Centre Basin                                            South Basin          TOTAL
                                                                                                                  Basin
Weir level (mAHD)                                            99.75                   98.75                        99.75                   102.75                  -
Bund level (mAHD)                                           100.25                       99                        100                     103                    -
Dam Area (m2)                                                 888                    1246                          415                     1066                  3615
Estimated Dam Volume (ML)
                                                             1.345                   2.001                        0.544                    1.625             5.515
(Assumes 2m depth; 1:2 batters)
Model Output Location                                       Node A2                Node B4                       Node B3                 Node C2                 OUT
Dam fill time (hrs):                                         0.30                        0.23                      0.18                    0.27                  0.28
Total Flow Volume (ML):                                       180                    1127                          536                     487                   1437
Est. Dam Volume as % of
                                                             0.7%                    0.2%                         0.1%                     0.3%                  0.4%
Design Storm Flow Volume

Page 10

                                                                                                                                                             Attachment 1
15‐003352 ‐ Palm Lake, Cooroy
Existing 1yr ARI conditions (RAFTS Model) and influence of existing farm dams on catchment hydrology

                                                                      Site flows and Farm Dam fill times
                                  1.4




                                  1.2




                                   1
         1yr ARI Flows (cumecs)




                                  0.8




                                  0.6




                                  0.4




                                  0.2




                                   0
                                        0             0.5                   1                       1.5                     2                   2.5                 3
                                                                                                 Time (hrs)

                                            A2   B4   B3    C2        OUT       N Basin          Centre Basin       Centre South Basin      South Basin   TOTAL

                                                                                                                Centre South
Dam                                                         N Basin              Centre Basin                                            South Basin          TOTAL
                                                                                                                   Basin
Weir level (mAHD)                                            99.75                    98.75                        99.75                   102.75                  -
Bund level (mAHD)                                           100.25                        99                        100                     103                    -
Dam Area (m2)                                                 888                     1246                          415                     1066                  3615
Estimated Dam Volume (ML)
                                                             1.345                    2.001                        0.544                    1.625             5.515
(Assumes 2m depth; 1:2 batters)
Model Output Location                                       Node A2                 Node B4                       Node B3                 Node C2                 OUT
Dam fill time (hrs):                                         0.50                         0.40                      0.33                    0.47                  0.48
Total Flow Volume (ML):                                          65                       407                       192                     181                   516
Est. Dam Volume as % of
                                                             2.1%                     0.5%                         0.3%                     0.9%                  1.1%
Design Storm Flow Volume

Page 11

Glenn Browning

From:                                  Andrew O'Neill <[email protected]>
Sent:                                  Wednesday, 20 January 2016 8:13 PM
To:                                    Glenn Browning
Subject:                               Re: Receiving Waterbody Definition



Hi Glenn

I would agree mostly with what you’ve written, probably more accurate to say that a small
pond won’t necessarily represent the ‘ultimate’ receiving environment. I know that councils
typically don’t want to consider ponds as part of a treatment train for 2 reasons:

    1. For those that will come into their ownership because of ongoing maintenance issues
       that are commonly associated with these assets.
    2. It could be agreed that at times ponds will perform a treatment function (primarily
       through sedimentation), at other times they can easily worsen water quality leaving the
       site.


Sorry, it’s hard to be definitive on this one, but ponds and lakes are generally only desirable if
they’re going to have a really good maintenance regime. In that case, it can be a benefit to
the ultimate receiving waters, but at significant cost.

A


Dr Andrew O'Neill
Principal Scientist – Manager, Water by Design




T (07) 3177 9107 | F: (07) 3177 9190


E [email protected]




                                                            1

Page 12

W www.healthywaterways.org
L Level 4, 200 Creek Street, Spring Hill 4004
P PO Box 13086, George St, Brisbane Qld 4003




From: Glenn Browning <[email protected]>
Date: Wednesday, 20 January 2016 at 4:57 PM
To: andrew oneill <[email protected]>
Subject: Receiving Waterbody Definition

Hi Andrew,

Thank you for the discussion earlier today.
Further to our conversation, could you please confirm this general summary of our discussions?

     -     A receiving waterbody is a lake, river or bay that accepts stormwater discharge and is the environment that
           we are seeking to protect. A small constructed isolated pond on an individual site would not necessarily
           satisfy the definition of an receiving environment.
     -     A pond could be part of the treatment train however it would be recommended to have pre-treatment to
           reduce maintenance and minimise the potential of risks such as algal blooms.

Thanks for your assistance on this matter.

Glenn




                            Glenn Browning
                            Engineer – Water & Environment

                            Calibre Consulting (Qld) Pty Ltd
                            Ground Floor, 545 Queen Street, Brisbane, Qld, 4000
                            PO Box 10349, Adelaide Street, Brisbane, Qld, 4000
                            T 07 3895 3444
                            E [email protected]
                            www.calibreconsulting.co

The information contained in this e-mail and any attachments are confidential and are intended solely for the use of the addressee or
someone authorised to receive the addressee's e-mail. If you have received the e-mail in error, please notify the sender by return e-mail,
delete the e-mail from your computer system and destroy any printed copy. There is no warranty that this email is error or virus free. It may
be a private communication, and if so, does not represent the view of Calibre Consulting (Qld) Pty Ltd.




                                                                               2

Page 13

 

   

EXISTING SWALE

   

EXISTING HOUSES
AND SHEDS

   
 

    
 

NORTHERN
EXISTING DAM

   

EXISTING HOUSES
AND SHEDS

   

EXISTING @ 300
PIPE

 
     
 
 

 
 
 

LOT 2
RP165418

   
  

EXISTING SHED

  
   
   
    

wk

EXISTING @450 RCP

x 4
CENTRAL \ a

EXISTING DAM

EXISTING HOUSES
AND SHEDS

    
     

LOT 1 M,
RP 165418 / >

/ n on sa
/ NN RP215922

        
 

 

 

 
   
    

g

Bt

“ON Nw 4 EXISTING $375 N \ \
\%

ee a a eS

COOROY CONNECTION ROAD

a=

   
    

     

   

—
. \ EXISTING 900x300 ==
ZZ ~ BOX CULVERT _— oe EXISTING 1350x300
SEZ —_ BOX CULVERT
LEAK _— -_
LG ~~ a

APPROXIMATE ALIGNMENT OF ELEVATED RAILWAY
CORRIDOR (TOP OF CATCHMENT).

SOURCE: MAPVIEW - QLD GOVERNMENT DEPARTMENT
OF NATURAL RESOURCES AND MINES (2006)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—
LEGEND
APPROXIMATE SITE BOUNDARY (MCU) » FLOW DIRECTION
EXISTING SCENARIO EXISTING CONTOURS
—— ee CCATCHMENT BOUNDARY

EXISTING SCENARIO @ DISCHARGE LOCATION

CATCHMENT LABEL NOTES:

FLOW PATH 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE CONCEPT PLAN ONLY

LATEST ISSUE OF CALIBRE CONSULTING REPORT No. 814158. NOT TO BE USED FOR
CONSTRUCTION PURPOSES
FILE: B14158.W-SK100.dwq DATE: 12-11-2015 TIME: 08:47
iXref's: X_B14158.W_ BASE X_B14158.W_EXISTING X_B14158.W_TITLE USR: Sam Linde
Tar [ours ane] On SORE TETEET TROOP To caer SAWN TE
AMENDMENT DETAILS pewen Cmox SURVEYOR: KEN HICKS & ASSOCIATES F~
a 49 THe ESPLANADE MAROOCHYDORE, PALM LAKES RESORT C —_ EXISTING SCENARIO
h

ae wee Be em | FI scar : CATCHMENT PLAN
D DRAWN CHECK f 1:2500 AZ to.
I B14158.W ANINTHEW HL PED TT PALM LAKES - COOROY Calibre see oe ao
NIE . Tel 07 3895 3444 Focsmi ee
oF FOR & ON BEHALF OF CRLBRE CONSULTING (LO) PTY LTO RETIREMENT COMMUNITY CONSULTING Cen umes ten naoes ecarvoe CGS! B14158.W-SK100 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 14

SPA


[OCR of page images]
 

   
         

 
   
  
  
  
     
   
   
   

 

 

 

 

 

 

         

 

  

 

 

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
     
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\
NORTHERN BASIN EXISTING SWALE
\ SOUTHERN BASIN PEAK FLOWS ABOVE
\ THE 1 YEAR ARI STORM TO BE DIRECTED
pay TOWARDS PROPOSED EASEMENT
p es
= ®, A
ge > INS E <i TRADIN Z
Q x J] -
4 BASIN ll Se NS POST ROAD- - 4
> U pgSiaIai
Gi it ESCETITIT)
sy TOOLS oo ie
= = : = = aol cattaratatat ti \
i PaCETETETITE Fh \
44
[fi Fa GELEGI LILY bid
| CePEPEPirt Pat
yas
(fee
nt ie
X
COOROY CONNECTION ROAD —
ne a a —_ —__n
LEGEND: _ ™
‘ —
SITE BOUNDARY _— =a oe SITE DRAINAGE AND ROAD NETWORK
~ a DESIGNED TO CONVEY 100 YEAR ARI PEAK
——_— =— = DEVELOPED CATCHMENT BOUNDARY FLOWS OF UPSTREAM EXTERNAL CATCHMNET
wo PROPOSED STORMWATER DRAINAGE
UPSIZED SITE DRAINAGE NETWORK AND STORMWATER EASEMENT
TO CATER FOR UPSTREAM EXTERNAL CATCHMENT FLOWS
WATER QUALITY CONTROL POND
OR BIORETENTION BASIN *
» FLOW DIRECTION
» 1 YEAR ARI PEAK FLOW DIVERSION
NOTES:
@® SITE DISCHARGE LOCATION FOR FURTHER BASIN CONFIGURATION REFER 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ao os SS He EXISTING SWALE TO DETAILS PROVIDED ON SUBSEQUENT LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
PLANS, SIZING SUBJECT TO DETAILED DESIGN. B14158.W-03. CONCEPT PLAN ONLY
PROPOSED EASEMENT (STORMWATER/SERVICES
( ) 2. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOWS TO GPT CNC TRCTEN HiRPOws
AND BIORETENTION BASIN
mar [ens [oe] a SORE TITREST THCROFT Tor STENT DRAWNG THE
AMENOMENT DETAR DesIw cHECK SURVEYOR: KEN HICKS & ASSOCIATES , an
Nn a 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT C CCONGULT AUSTRALIA DEVELOPED MITIGATED
Sie fac Cane |r ater ara a Ph (07) S443 2846 Fax (07) $463 7146 Le wi CATCHMENT PLAN
B(e] cB | ww | 05.02.16 | LavouT AMENDMENTS Dawn cueck | 2200 A3 PROJECT No. "APPROVED. H
zp 814158 W ata S28] PALM LAKES - COOROY Callore Geltgseten sham candi Ee Learns =a
NIE a Te 07 3895 3444 Facsimile 07 3895 3400
sr FO ON HELE OF CALE COILING PTY 1 RETIREMENT COMMUNITY CONSULTING ir ten tae te te tenon SE B14158,W-SK101 c

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 15

SPA


[OCR of page images]
 

   
 

 

 

 

Sw0-

—— =| oS =

WLM
ELLA

_—

SITE BOUNDARY

MUISIC CATCHMENT BOUNDARY

PROPOSED STORMWATER DRAINAGE

PROPOSED FLOW PATH

WATER QUALITY CONTROL POND
OR BIORETENTION BASIN *

MODELLED AS COMMERCIAL

STORMWATER DRAINAGE EASEMENT
AND SERVICES CORRIDOR

WOODWORKING/GOLF ROOM x
AND TENNIS COURTS

    
   
   

hy
\ CARETAKER’S Aes
S of

|.) BOWLING |_|
GREENS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 BED AGE

 

  

CARE FACILITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

comet Rating
COOROY CONNECTION ROAD -- - ae KE »
EXT F =e
eee ee ee oe Ee EXT G KS
— _—— ~ Sd ~\
— — ~ \
— = — —
_—
— ]
—
— ae
€) MUSIC CATCHMENT LABELS MUSIC_CATCHMENT PLAN
SCALE 11250 (At)
>» FLOW ARROWS SCALE 1:2500 (A3)
MODELLED AS AREAS
| BYPASSING TREATMENT
CARPARKING AREA CATCHMENT F5
igasaeaasseassaninad TO BE TREATED BY BIOPOD FS NOTES:

 

* or FURTHER BASIN CONFIGURATION REFER

1. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH CALIBRE CONSULTING REPORT No. B14158.

 

FILE, BU41S8.W-SK102.duq DATE: 12-11-2015 TIME: 1531
Piref’s: X_BIs158.W_TITLE X_B161S8.W_BASE USR: chris mok

TO DETAILS PROVIDED ON SUBSEQUENT
PLANS, SIZING SUBJECT TO DETAILED DESIGN.

 

 

 

2. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOWS
TO GPT AND BIORETENTION BASIN.

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oe Tcnmnn one “coun cneoe SORE TETAS TICROPTN SURVEYOR KEN TICKS & ASSOCIATES SENT
rar 15.02.16 J LAYOUT AND CATCHMENT AMENONENT 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT
ie 11250 25 0 25 so At Ph (07) 5443 2844 Fax (07) 5443 7146

8 4.2500 AB PROECT

pic DRAWN CHECK PROJECT No. APPROVED

e Bits. W wesaagat mt | PALM LAKES - COOROY
HG :

SIF FOR & ON BEHALF OF CALBRE CONSULTING (QLD) PTY LTD RETIREMENT COMMUNITY

 

 

 

 

 

 

 

Cc non

‘DRAWING TITLE

MUSIC CATCHMENT

PLAN

 

i Calbre Consuting (QLD) Py Lid
Ca re Level 6, 199 Gray Sroe, South Brisbane QLD Amiri 4101
‘Telephone 07 3895 3444 Facsimile 07 3895 2400

CONSULTING (Beare Garber MBownie thay Capone Valine Coast

1 a

 

‘DRAWING NUMBER

 

B14158.W-SK102 A

 

 

 

Page 16

 

MATCH EXISTING
LEVELS AT BOUNDARY
RL 97.7m AHD

<

 

 

 

   

  
 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

1 |

rc

 

 

 

  

   

 

T
|
S
S| i a] ‘tm WIDE BASIN EMBANKMENT
| | -| RL 101.0m AHD
L EXISTING DAM AND EMBANKMENT TO
| fl | BE RECONSTRUCTED TO FORM COMBINED
\ | BIORETENTION AND DETENTION BASIN
| L W
| Se | WS
|S
| tin 4 |
‘|
Vv | Dy
| |— NORTH BASIN - COMBINED BIORETENTION UZ
| AND DETENTION STRUCTURE
| FILTER AREA: 450m? .
| TOTAL BASIN SURFACE AREA: 530m? .
EXTENDED DETENTION DEPTH: 0.3m .
| FILTER DEPTH: 0.4m .
DETENTION VOLUME TO 100 YR ARI WSL:|~ , * 3
. ‘in
\ 1,200m? (EXCLUDING STORMWATER we Roo are
| QUALITY PONDING DEPTH) . (\ ,
wy eee we . y
| a er ee
| vv oe ew ev ee \\ SECONDARY OUTLET
| wee ee we eee |) PIT AT RL 100.5m AHD
| PROPOSED SEDIMENT FOREBAY See yore iN OUTLET PIPE [3750 RCP)
| ENERGY DISSIPATER TO CAPTURE CN De 9780 AMD
COARSE SEDIMENTS AND PROVIDE a Gey ‘| vm
| BASIN SCOUR PROTECTION 5 as 1 in 3
| Sf ae y fo \ MATCH EXISTING
| PROPOSED RETAINING vo — LEVELS AT BOUNDARY
| WALL (0.5m MAXIMUM vo RL 97.8m AHD
HEIGHT) hey
| ~A
| OVERFLOW WEIR FOR
| In — MAJOR STORM EVENTS
i RL 100.55mAHD (REFER
| g TO DRG No.
| B14158.W-SK106)
| EMERGENCY WEIR FOR
| EXTREME STORM EVENTS
\ RL 100.70mAHD (REFER TO
\ 70270 \ DRG No. B14158.W-SK106)
N A
N 7
~ —- PROPOSED RETAINING WALL
| (MAX HEIGHT 1.5m)
PEAK FLOWS UP TO
AND INCLUDING THE
aoc occ rrr rrr rrr 100 YR ARI STORM TO —~———T 4}
2 BE DIRECTED TO BASIN
4
/
/

 

TENNIS
COURTS

 

 

To]

i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Zz

LEGEND:
SITE BOUNDARY
EXISTING CONTOURS
‘swo———— swo- PROPOSED STORMWATER DRAINAGE

 

 

BIORETENTION FILTER

 

ROCK ARMOURING/
ENERGY DISSIPATER

 

 

 

INDICATIVE DESIGN LEVELS

FLOW DIRECTION

 

NOTES:

LAYOUT OF THE PRELIMINARY STORMWATER MANAGEMENT
STRUCTURES AND PRELIMINARY DESIGN LEVELS SHOWN ARE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
| |
|
| 7 Fl | CONCEPT ONLY AND ARE SUBJECT TO DETAILED DESIGN.
| U |
| | 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE
| — | | LATEST ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03.
\S
| _ SY 0
! 0 | | 0
J, LL
| _ ot} | Lb 4
| a . |
| | | a) PRELIMINARY
NOT FOR FOR INFORMATION ONLY
CONSTRUCTION NOT FOR CONSTRUCTION
FILE: B14158.W-SK103.dwq DATE: 12-11-2015 TIME: 08:48
Xref's: X_B14158.W_ BASE X_B14158.W_TITLE X_B14158.W_CONTS USR: Sam Linde
‘AMENOMEN' s DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES
eS Ee 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA PALM LAKES
ie woo 2 0 2 4 6 8 9M Ph (07) 5443 2844 Fax (07) S443 7146 | NORTHERN BIORETENTION BASIN
N 1400 AB 7 H
th Biss W "EMAMLEES| PALM LAKES - COOROY Calibre Eee thee =
NIE . Te 07 3895 3444 Facsimile 07 3895 9400
br Ff EAA OF Clb UNSUNG LO PY LD RETIREMENT COMMUNITY CONSULTING ae awa tans Sey oe mamta TEAL B14158.W-SK103 A

 

 

 

Page 17

  A
SP


[OCR of page images]
 

jw | | |

   
   
  

 

I
[PAD RL 102.20m AHD]|[PAD RL 102.00m AHD]|[PAD RL 101.90m AHD] [PAD RL 107.40m AHD |

 

 

PROPOSED RETAINING WALL
(MAXIMUM HEIGHT 1.5m)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ROCK ARMOURING AT OUTLET FOR
SCOUR PROTECTION AND DISSIPATION N

 

 

aa
oe

   
    
  
   
   
   
   
   
  

    

   

PROPOSED ROAD

 

 

 

 

! y
-
| / | " \ “*
| / ! EDGE ROCK
| | 12.5m LONG 3 825 RCP OUTLET PIPE
| \ USIL 98.3m AHD
° x \ DSIL 98.2m AHD
| root t000) REEPR TO » : —- \ TO DISCHARGE TO EXISTING SWALE
| Gg SECTION DETAILS Z \ \
RETAINING WALL— 179 - OVERFLOW WEIR FOR
MAX HEIGHT usm Pt ~ p MAJOR STORM EVENTS
|i | Ling \ LEGEND:
I ~— 0 6 \

,

ONDOOO

ROCK ARMOURING \ / SITE BOUNDARY
AT OUTLET \ \/4
——— YO ge PRELIMINARY ROAD
" \ / DESIGN CONTOURS

 
   

4
MINIMUM 3m MAINTENANCE Z

 

» 0 EXISTING CONTOURS
ae ACCESS TRACK / sw PROPOSED STORMWATER
\ 1 DRAINAGE
\I vow,
SPLIT FLOW PIT \ BIORETENTION FILTER

 

 

   
 
 
   
   
  
  
   
 
  
   
   

SAFETY FENCING Ae

BE PROVIDED ALONG}
RETAINING WALLS |
'
'
I

 

 

RETAINING WALL \, A \
INCOPORATED INTO C N \\ \. OPEN WATER

BOWLING GREEN DESIGN X

\
X ) \ MACROPHYTE ZONE (MIN. 20% OF
NORMAL OPERATING POND AREA)
CENTRAL BASIN - COMBINED WQCP AND DETENTION STRUCTURE

NORMAL OPERATING POND AREA: 2,000m2
NORMAL OPERATING POND VOLUME: 2,000m?
NORMAL OPERATING POND LEVEL: 99.2m AHD
TEMPORARY PONDING LEVEL: 99.6m AHD Ve
EXTENDED DETENTION DEPTH: 0.4m eae aaa a) RETAINING WALL
DETENTION VOLUME TO 100 YR ARI WSL: 4,550m?

(EXCL. TEMP. PONDING DEPTH FOR SW QUALITY 100yr FLOOD LEVELS)
MACROPHYTE AREA: MINIMUM 400m?

(20% NORMAL OPERATING POND AREA)

 

 

  

SWIMMING
POOL

 

 

 

 

1 YEAR FLOWS

- OVERFLOW WEIR
AT RL 100.5m AHD
ATR

L- |
-- '
~

PROPOSED.
PROPRIETARY GPT

TT ttelellellelbeat eal MAINTENANCE ACCESS ROUTE

INDICATIVE DESIGN LEVELS

 

 

 

 

 

BOWLING GREENS

NOTES:

1. LAYOUT OF THE PRELIMINARY STORMWATER MANAGEMENT
DEVICES AND PRELIMINARY DESIGN LEVELS SHOWN ARE
CONCEPT ONLY AND SUBJECT TO DETAILED DESIGN.
LEVELS SHOWN ARE INDICATIVE ONLY.

 

  
  
  
  
        
     
  
      
 
 
 
 

 

   
 

TOW
BOW

   

RL 101.7mb

PROPOSED SWIMMING POOL \
RL 100.1m

> (REFER TO LANDSCAPING PLANS FOR
g FENCE AND LANDSCAPING DETAILS)

Dee
|
| |

PAD RL 102.60m AHD

CLUB HOUSE
| | 1 YEAR ARI PEAK FLOWS

PUMP HOUSE | DIRECTED TO CENTRAL BASIN
NON ee | N_ FROM SOUTHERN BASIN

MAINTENANCE TRACK -

      

 

 

  
 
 
 
 

  
 
 
     
 

 

ROCK ARMOURING AT OUTLET
FOR SCOUR PROTECTION AND
ENERGY DISSIPATION
PIPE IL = 99.2m AHD

 
  

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
B14158.W-03.

LS RETAINING WALL .
v (1.5m MAXIMUM HEIGHT) \
7 BIORETENTION BASIN - UPSTREAM OF WCQP
FILTER AREA: 200m?

BASIN SURFACE LEVEL: 100.1m AHD
EXTENDED DETENTION DEPTH; 0.3m

FILTER DEPTH; 0.4m

 
 

 

3. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOW TO GPT
AND BIORETENTION BASIN.

 

 

 

 
 
  

  

wee

oe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACCESS TO CENTRAL BASIN 02
\ AND SWIMMING POOL
NI
CENTRAL BASIN LAYOUT PLAN
SCALE 1250 (AN
SCALE 1500 (A3) NOT FOR PRELIMINARY
FOR INFORMATION ONLY
CONSTRUCTION NOT FOR CONSTRUCTION
FILE: B14158.W-SK104.dwg DATE: 12-11-2015 TIME: 08:48
iXref's: X_B14158.W_TITLE X_B14158.W_BASE X_B14158.W_EXISTING USR: Sam Linde
Trat [eas ea] TEST RTT ST ERENT
AMENEMENT DETAR penn onze] SURVEYOR: KEN HICKS & ASSOCIATES a
me | ae 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONIULT AUSTRALIA CENTRAL BASIN
a 12505 0 5 oom Ph (07) 5443 2844 Fax (07) 5443 7146 | ve LAYOUT PLAN
N 1500 AZ PAPPROVED a)
Wc san once prowect wa ARROTE
1p Bi4158.W ANATTNEW HLL PEG IST PALM LAKES - COOROY Calibre Gonder aba 0 EE -_=
NIE . Te 07 3895 2444 Focumile 07 3895 $400
iF Fo 1 ON SHAE OF CALE CONSLTNG CO TY LT RETIREMENT COMMUNITY CONSULTING tsen tort tases ew oa tere “BERL B14158.W-SK104 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 18

 

_ — N
oO a oe \

“ - 1 YEAR ARI G900 STORMWATER \
/ a Va FLOW DIVERSION PIPE _— s

7 JL a | oN,

LS PRIMARY OUTLET PIT TO DIVERT | . \
a 1 YEAR ARI PEAK FLOWS \s $ L S ~

S TOWARDS CENTRAL BASIN

Zz

(RL 102.0mAHD)

/
’ / \

  

BASIN EMBANKMENT MINIMUM *

 

 

 

 

 

 

     

  
 
  
  
  
  
 
  
  
 

 

 

 

 

  

 

 

 

 

 

 

 

 

     

 

4 , . LEVEL: RL 103.0m AHD
/ a \
’ ,
J TOW = RL 102.80
“ So BOW = RL 102.10
4 / \
Vv N
/ , >
4 > v s
a a 4 v v y v \
So /™N C&P v v y \.
/ S “ v v v v ‘,
So TOW = RL 103.10 “4 ey . v v v \. 900 STORMWATER PIPE TO N
Y BOW = RL 102.10 AK SECONDARY OUTLET PIT \. CONVEY PEAK FLOWS ABOVE
/ MKS Y TO CONVEY PEAK FLOWS = y Y Ik \, THE 1 YEAR ARI STORM
’ \ 4 v% i ABOVE 1 YEAR ARI STORM v y Hy
\ “ v (RL 102.3mAHD) (
LS . ? A v v \
: “\ ‘ eo e v v Vv
PROPOSED RETAINING WALL (MAXIMUM v v v v
tm WALL HEIGHT) SAFETY FENCING TO LS v a e v v
BE PROVIDED ALONG RETAINING WALL ° v y v v
> v SOUTHERN BASIN (BIORETENTION SYSTEM)] v v Y
7 v v v FILTER AREA = 350m? ee
-- a v v v SURFACE LEVEL = 101.7m AHD kv qT
\ v FILTER DEPTH = 0.4m ey
TOW = RL 103.35 & ov X Y| TEMPORARY PONDING DEPTH = 0.3m e or! ote
BOW = RL 102.75 o 9 9 o vy” vy” ore
T v v v v
! v v v v
v v wv v
| v v v v
1 v v v v
‘ Vv Vv Vv Vv
\ eo) v ey wv v
\ v v v v v LEGEND:
\ v v v SEDIMENT FOREBAY: TO
\ Vv ey a oy v v v CAPTURE COARSE SEDIMENTS PROPERTY BOUNDARY
\ v v Vv
NL. v v v v v v
™, v v v v y EXISTING CONTOURS
v v
SEDIMENT FOREBAY TO vy v y wo PROPOSED STORMWATER
\ CAPTURE COARSE SEDIMENTS \ v DRAINAGE
. .

 

 

 

BIORETENTION FILTER

 

RETAINING WALL

  

PARALLEL PARKING

TO BE PROVIDED N
\ LO

NOTES:

1. LAYOUT OF THE PRELIMINARY STORMWATER
QUALITY IMPROVEMENT DEVICES AND
PRELIMINARY DESIGN LEVELS ARE CONCEPTUAL
ONLY AND ARE SUBJECT TO DETAILED DESIGN.

@’ ACCESS/MAINTENANCE TRACK
PIPE TO CONVEY MINOR DESIGN

N STORM FROM DEVELOPMENT
SOUTHERN BASIN LAYOUT PLAN

 
 

STORMWATER DRAINAGE SIZED
FOR 1 YEAR ARI STORM EVENT

    
   

PAD RL 103.70m AHD

2. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH LATEST ISSUE OF CALIBRE CONSULTING

REPORT NO. B14158.W-03.
SPLITTER MANHOLE TO DIRECT 1

YEAR ARI PEAK FLOWS INTO SOUTH
BASIN AND LARGER EVENTS NORTH

 

 

 

 

 

SCALE 1:100 (At) NOT FOR PO EEIMINARY
SCALE 1:200 (A3)
FILE: BI4158.W-SK105.dwg DATE: 12-11-2015 TIME: 08:48 CONSTRUCTION NOT FOR CONSTRUCTION
ref's: X_B1s158.W_TITLE X_BI61S8.W_BASE X_B14158.W_CONTS USR: Sam Linde

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rast [oes pene] one SORES TERT A ca TERT TNT
AMENOMENT DETALS Desian cnox SURVEYOR: KEN HICKS & ASSOCIATES
we ees 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA PALM LAKES
it wo 1 ot 203 8 os mM Ph (07) 5443 2864 Fax (07) 5443 7146 | C = SOUTHERN BIORETENTION BASIN
N 1:200 AB a
Nc Taam Ome ee LAYOUT PLAN
#p B14158.W ANATTHEW MLL PEG IST PALM LAKES - COOROY Calibre Se oni aba  ——— -_
FE o Te 07 3895 3444 Face 073895 9400 oper
sf Fo 0 BHA OF ALBRE OSILING a TL RETIREMENT COMMUNITY CONSULTING See oe B14158.W-SK105 A

 

 

Page 19

 

1.00m

TOP OF EMBANKMENT
RL_101.00m AHD

EMERGENCY WEIR
RL_100.70m AHD.

    
 
  
   
 
  

 

 

Q500 WSL 100.91m AHD
S200 Wee in A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2100 WSL 100.70 AHO ee ~ MAJOR OVERFLOW WEIR q
RL10050m AH __ RE 100.55m AD
See 1
| - EMERGENCY WEIR FOR EXTREME
al 100.00m AHD | -_ & STORM EVENTS (i.e. 500 YR ARI)
TEMPORARY PONDING FOR === == 1 | \ Ad |
STORMWATER QUALITY nx150 PRIVARY | SL
x
FRONT ORIFICES L | | | -~_ 2x 250 SECONDARY
RL 99.40 AHD “| \ | RL 100.0m AHD
f |
RL_99.10m_AHD Y WY | | | [-—— seconoary OUTLET PIT
SS | |
t | (900x900 SQ.)
° BIO. RETENTION ie | | <
RL 98.70m AHO S| FILTER MEDIA >| | | a
] |
| |
i
| | | i 0.5% FALL
1 4 I _ ae _ - _— >_> - 8 _- _ _
RL_98.00m AHD rn i To
— 1
SUBSOIL DRAINAGE UPSTREAM IL = 98.0m AHD 1x 6375
PRIMARY OUTLET PIT BALANCE ORIFICE TO CONTROL
(900x900 SQ.) FLOWS BETWEEN PIT STRUCTURES DOWNSTREAM IL = 97.9m AHD
BASIN OUTLET CONFIGURATION SECTION
SCALE 1:20 (A1)
SCALE 1:40 (A3)
TOP OF EMBANKMENT TOP OF EMBANKMENT
2.50m , 3.00m , 2.50m
EMERGENCY WEIR OVERFLOW WEIR EMERGENCY WEIR
RL_101.00m_AHD os00 100.91m AED RL_101.00m AHD
wT 91m i 2
SS
Cc: RL_100.70m_AHD 100 100.70m_AHD RL_100.70m_AHD ———1
eee a 2
6 RL_100.55m_ AHD 6
1_—_———— 1
6 6
WEIR ELEVATION DETAIL
SCALE 1:20 (A1) NOTES:
SCALE 1:40 (A3) 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
NOT FOR 7 RELIMINARY THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.
CONSTRUCTION NOT FOR CONSTRUCTION °
tee BIAS WEE dug DATE gras TIME: 08:49
ref’: BSB am Linde
Tat [ons [an] ONT ao THCROTTN Ne Ten DRAWS TTT
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES ry
me S| 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONGULT AUSTRALIA NORTHERN BASIN
in 120020 02 04 06 08 1 At Ph (07) 5443 2864 Fax (07) S443 7166 | —h_y OUTLET STRUCTURE DETAILS
N 1:40 AB lapPROuD nl a
Nic caw Omen PROJECT No. TRATED
tp 814158 W nmersrat git 3] PALM LAKES - COOROY calibre Sorin enRtiiy abla amy a PenrenE aT aa
NIE o Te 07 3895 3444 Facsimile 07 3895 2400
br fo OW BEHALE OF CRUBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING ee ea toon ten oe neve B14158.W-SK106 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 20

 

, 3.00m
ACCESS TRACK

EXTREME STORM AND BLOCKAGE EVENT uN RL aN
WSL 101.25m AHD . 30m
eS

 

OVERFLOW WEIR
RL 10) jm AHD

Q100 WSL _101.00m AHD
ee

   

 

1.20m

 

2x 400 PRIMARY FRONT ORIFICE TO 2x 400 PRIMARY SIDE ORIFICES TO CONTROL
CONTROL FLOWS AT (IL 99.60mAHD) RL100.35m _AHD, FLOWS i.e. ONE ORIFICE ON EACH SIDE MAJOR OVERFLOW WEIR FOR
(IL 9.6m AHD) EXTREME STORM EVENTS

 

I
TEMPORARY PONDING LEVEL . | (
RL_99.60m AHD i

NOL RL _99.20m AHD =
NOE RE_97.20m_AHD

 

 

 

 

 

 

 

 

 

 

 

55mm ORIFICE TO CONTROL TEMPORARY PRIMARY OUTLET PIT
PONDING FOR STORMWATER QUALITY PURPOSES (1200x1200 SQ.)
SCREEN TO BE PROVIDED AT DETAIL DESIGN

BASIN OUTLET CONFIGURATION SECTION
SCALE 1:20 (A1)
SCALE 1:40 (A3)

I 15m TOP OF EMBANKMENT
TOP OF EMBANKMENT OVERFLOW WEIR BASE WIDTH

  
 
 

EXTREME STORM AND RL_101.50m_ AHD
BLOCKAGE SCENARIO — a
WSL 101.2m_AHD

[ 100 101.00m AHD | ——T1
—— — _———_— —

   

RL_101.30m_ AHD
+__

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 = — FS RL 100.90m AHD— — — — — — — — —— — ~~ ~~ 6
6
WEIR ELEVATION DETAIL
SCALE 1:20 (A1)
SCALE 1:40 (A3) NOTES:
1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.
NOT FOR CONCEPT PLAN ONLY
NOT TO BE USED FOR
FILE: B14158,W-SK107.dwg DATE: 12-11-2015 TIME: 07:42 CONSTRUCTION CONSTRUCTION PURPOSES
Xref's: X_B14158.W_TITLE USR: Sam Linde
Tat [ones [awe] ONE SORE TETEET TORO To SORT SAWN TE
AMENDMENT DETAILS peo CHEK SURVEYOR: KEN HICKS & ASSOCIATES Fx
i 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT C CCONGULT AUSTRALIA CENTRAL BASIN
ie 12002 0 02 04 06 08 1 Al Ph (07) 5443 2864 Fax (07) 5443 7146 | er OUTLET STRUCTURE DETAILS
N 1:40 AB lapPROuD nl a
Ne caw Omen PROJECT No TRATED
re 814158, W momo eee"! PALM LAKES - COOROY calibre Serle en si Abhay ae Poaceae Sa a
NIE o Te 07 3895 3444 Facsimile 07 3895 2400
br fo OW BEHALE OF CRUBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING ee ea toon ten oe neve B14158.W-SK107 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 21

 

TOP OF BANK
RL_101.5m (VARIABLE)

  
    
 
    

RL 99.25m
RL 98.95m —~|

RL 98.70m

9.00m

 

 

 

MACROPHYTE PLANTING AREA WIDTH
VARIES (MIN. 2m WITH 1 in 8 SLOPE)

 

 

   
 
 

 

TYPICAL CENTRAL BASIN
SECTION - PART A

SCALE 1:50 (A1)
SCALE 1:100 (A3)

3.0m

 

Yj} ZONE WIDTH VARIES

BIORETENTION BASIN

 

REFER TO TYPICAL SECTION AND DETAIL

     
   

 

 

 

 

 

RETAINING

Q100 WSL _101.00m

TEMPORARY STORAGE
WATER QUALITY
WSL 99.60m

NOL RL _99.20m

 

ATT TTA

DEEP ZONE RL_97.20m
SE FONE BE EM

 

 

 

 

 

 

 

 

 

 

SECTION CONTINUES BELOW

CAR PARKING SPACE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| ACCESS TRACK TOP OF WALL
| RL_101.70m
TEMPORARY PONDING
LEVEL RL 100.40m
0100 WSL 101.00m TOP OF EMBANKMENT
l == == -- -- -- -- -- -- -- — — — OVERFLOW WEIR — ——— — — —_|— MIN. RL 100.80m -- - _- ae a a BATTER BACK TO ROAD
{IN. RL _100.80m__
wl RL_100.50m
EE r ,
<| TEMPORARY STORAGE WATER QUALITY il x ¥ Wve Y yy Bb 100.100
wo! WSL_99.60m
3) eo St
Z| NOL RL 99.2000 ET SS Se FILTER MEDIA
SL aI IIL IO IIIT IDI gn Sr —-- TOO
S| 2 |
s
S| “
= a, BASIN OUTLET PIPE
HI i
I LZZ-§ 5
[/DEEP_ZONE_RL_97.20m S
f
TYPICAL CENTRAL BASIN
SECTION - PART B NOTES:
SCALE 1:50 (A1) ——
SCALE 1100 (A3) 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.
NOT FOR CONCEPT PLAN ONLY
NOT TO BE USED FOR
FILE, B14158.W-SK108.dug DATE: 12-11-2015 TIME: 07.47 CONSTRUCTION CONSTRUCTION PURPOSES
Xref's: X_B1158.W_TITLE USR: Sam Linde
mar Tones rave] One SORE METRES T TICROPTINT Ne SENT DRAWN TLE
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES
rr 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONBULT AUSTRALIA PALM LAKES
ie 150 105 0 1 zm Ph (07) 5443 2844 Fax (07) 5443 7146 OE CENTRAL BIORETENTION
N 1:100 AB a
pic DRAWN CHECK] PROJECT Ho APPROVED BASIN AND POND SECTION
i praise W aera] PALM LAKES - COOROY Calibre SEE Se SECTION
NIE . Te 07 3895 2444 Focumile 07 3895 9400
Mi Fo 1 BAF OF CALE CONSLTNG CO TY TD RETIREMENT COMMUNITY CONSULTING Ines torn sen ew tao tert BERL B14158.W-SK108 A

 

 

 

 

Page 22

 

 

TOP OF EMBANKMENT
MIN. RL 103.00m AHD

   

FILE: B148.W-SK109.dug_DATE: 12-11-2015 TIME: 08:49
Ixref's: X_Bth158.W_TITLE USR: Sam Linde

 

“20 YEAR ART 77

BELOW MAJOR OVERFLOW WEIR LEVEL
qeebOW MAJOR OVERF

MAJOR FLOW
OVER BASIN WEIR
VER BASIN WEIR.

 

1 YEAR ARI
WSL 102.30m_AHD

  
   

RL_102.00m_ AHD

 

TEMPORARY PONDING LEVEL

 

 

 

 

PRIMARY OUTLET PIT SIZED
FOR 1 YEAR ARI STORM

 

| | »

RL_102.30m_ AHD
102.30 AHD

 

 

 

EW RL_101.70m_ AHD\)
1 xr

1.00m

TOP OF EMBANKMENT
RL_103.00m_ AHD

   

MAJOR OVERFLOW WEIR
RL_102.70m_AHD
“___

   

 

MAJOR RUNOFF
(ie. Qso AND Quo)

 

 

 

 

 

BIO RETENTION FILTER
AND DRAINAGE LAYERS

400mm,

 

 

 

 

 

 

 

 

—----4----~

 

 

 

 

 

 

 

 

 

PRIMARY 900 OUTLET PIPE TO
CONVEY 1 YEAR ARI DESIGN
FLOWS TO CENTRAL BASIN

TOP OF EMBANKMENT
RL_103.00m AHD [

DIRECTED INTO
PRIMARY PIT

INFILTRATED FLOWS

 

SECONDARY OUTLET PIT SIZED TO
CONVEY STORM EVENTS ABOVE

1 YEAR ARI

SOUTH BIORETENTION BASIN SECTION
SCALE 1:20 (A1)
SCALE 1:40 (A3)

6.00m

 

MAJOR OVERFLOW WEIR

MAJOR FLOW

OVER BASIN WEIR
PeER BASIN WEIR

~"RL_102.70m_AHD
————

 

WEIR ELEVATION DETAIL
SCALE 1:20 (A1)
SCALE 1:40 (A3)

SECONDARY 900 OUTLET PIPE TO CONVEY
PEAK FLOWS ABOVE 1 YEAR ARI STORM EVENT
TOWARDS PROPOSED SWALE (WITHIN EASEMENT)

TOP OF EMBANKMENT
RL_103.00m_ AHD [
oo

NOTES:

1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.

 

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

NOT FOR
CONSTRUCTION

 

 

 

 

 

 

FRET [CALCS [DRAWN] _OATE
vesue On [ow | 05.1005

 

AMENDMENT DETAILS.

pesian cneox "SCALE (METRES 7

 

B_[ aw [05.02.16 | PPE SIZES AMENDED

=>

 

120 0.2 0 0.2 04 06

08

1

 

160
DRAWN CHECK|

 

 

 

 

 

 

 

 

[leo @]>

 

OszmEozm!

 

 

M
AB

 

MIGROFIUM No,

PROJECT No.

B14158.W

SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
Ph (07) 5443 2844 Fax (07) 5443 7146

APPROVED ANDREW McPHAIL RPEQ 6921
MATTHEW HILL RPEQ 11578

 

FOR & ON BEHALF QF CALIBRE CONSULTING (QLD) PTY LTO

“CLIENT

PALM LAKES RESORT

 

 

PROECT

PALM LAKES - COOROY
RETIREMENT COMMUNITY

 

calibre

‘DRAWING TITLE

SOUTHERN BASIN
OUTLET STRUCTURE DETAILS

(CONSULT AUSTRALIA

CalbreConsutng (QLD) Py Lid
ng ened

 

 

Gard For, 3% thre, CHD At 4000 DRAWING NOMEER BaUE
ieee hank ies B14158.W-SK109 A

Recere Cuber Katou fay Sapo Ben Coat 1c 4004

 

 

 

 

Page 23

SPA


[OCR of page images]
 

  

   

   
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
   
 
 
 
  
   
    
     
 
   
   
 
   
   
 
   
 
     
   
     

PROPOSED 6m WID!
DRAINAGE EASEMENT

PLUNGE POOL /
ENERGY
DISSIPATER

EXISTING SWALE

NORTHERN BASIN

 

 

 

 

 

 

|/— PROPOSED SWIMMING POOL
REFER TO ARCHITECTURAL FOR

TOWARDS SWALE
LANDSCAPING AND FENCING

   
  

5m WIDE
STORMWATER
EASEMENT

 

 

 

 

 

 

 

 

 

 

FLOW DIVERSION
D900

 

 

 

 

 

 

 

 

 

 

 

 

 

PEAK FLOWS ABOVE THE 1 YEAR
ARI STORM TO BE DIRECTED

I
SPLITTER MANHOLE TO DIRECT 1 YEAR ARI
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
THE PROPOSED SWALE & DRAINAGE EASEMENT TOWARDS SOUTHERN

LEGEND:

 

EASEMENT

ye

 

3m WIDE DRAINAGE

PROPOSED STORMWATER DRAINAGE
DESIGNED TO CONVEY MINOR FLOWS

SITE BOUNDARY

PROPOSED STORMWATER DRAINAGE
PROPOSED STORMWATER EASEMENT
RETAINING WALLS

FLOW DIRECTION

1 YEAR ARI PEAK FLOW DIVERSION
DISCHARGE LOCATION

SWALE

mi

 
  

BASIN

 

 

 

 

| aa \ 1) |_ ba

 

 

 

 

 

FILE: B14158.W-SKNI0.dwg_ DATE: 12-11-2015 TIME: 08:49

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.

 

CONSTRUCTION PURPOSES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

xref’s: X_B1s158.W_BASE X_B14158.W_MODFIED ARCH X_B1G1S8.W_TITLE ADAM DTM Layer Copy USR: Sam Linde B14158.W-03.
Taar [ons awn] ONT SORE TETAS T TACROPEN Wo SENT DRAWN TLE
AMENDMENT DETAILS: DESIGN CHECK| SURVEYOR: KEN HICKS & ASSOCIATES arn
pref ba eee [specs Une an tana woo 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONBULT AUSTRALIA CONCEPT STORMWATER
i 150 5 ‘0 2 at Ph (07) 5u43 2864 Fax (07) S443 7146 | SD DRAINAGE PLAN
‘ 11000 ry SR 7 rn
Nc chawn cnrex PROJECT No. APPROVED SHEET 1 OF 2
: 2 B14158.W AMIRTHEW HL PED TT PALM LAKES - COOROY Calibre Ger er Mag Dud a —
. i oat
SIF FOR & ON BEHALF OF CALIGE CONSULTING (QLD) PTY LTO RETIREMENT COMMUNITY CONSULTING Daten fata town fry nen tant Tb GBt B14158.W-SK110 A

 

 

 

 

Page 24

      POO
         L




SPA


[OCR of page images]
 

   
  
 
 
   
 
  

\ SN
~~ EXCESS PIPE FLOWS

\ \
Lo \

/ SPLIT FLOW PIT
“Oo

 
 

7d
a
LY

fe
Y 2 1 YEAR ARI

\x OVERFLOWS 7" ~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

f
4
snceole SWIMMING POOL

REFER TO ARCHITECTURAL FOR
~~ LANDSCAPING AND FENCING
—

    

\

 

 

\ _
LNG FLOWS ABOVE THE 1 YEAR ARI

\ STORM TO BE DIRECTED TOWARDS SWALE

 

 

PAV

 

 

 

 

 

900 STORMWATER 1 YEAR ARI
PEAK FLOW DIVERSION PIPE

 

 

 

 

 

 

 

  
     

 

 

 

ab ——F BASIN
IM U7 SL 101.7
Le,
2
t
I
1) Pe,

 

 

 

 

 
 
 

     

3m WIDE DRAINAGE
EASEMENT

 

LEGEND:

      

 

 

SITE BOUNDARY

PROPOSED STORMWATER DRAINAGE N
\

PROPOSED STORMWATER EASEMENT

RETAINING WALLS
MAJOR FLOW DIRECTION

1 YEAR ARI PEAK FLOW DIVERSION

DISCHARGE LOCATION
SWALE

SPLITTER MANHOLE TO DIRECT 1 YEAR ARI
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
THE PROPOSED SWALE & DRAINAGE EASEMENT

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

f
| STORMWATER
q EASEMENT

 

 

 

FILE; BU41S8.W-SKIIO.dug DATE: 12-11-2015 TIME: 08:49
PXref’s: X_B1s158.W_BASE X_B1158.W_MODIFED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde

 

 

 

 

 

 

pe

 

 

 

 

NOTES:

 

 

I
I
I
I
I
5m WIDE

STORMWATER
EASEMENT
i

 

 

 

 

 

 

 

 

1.

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
B14158.W-03.

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

we cM ™e 19 TA ESPLANADE MAROOCHYDORE. PALM LAKES RESORT C cofuw un & CONCEPT STORMWATER

ie soo 1 0 20 Al Ph (07) 5443 2844 Fax (07) 5443 7146 | __ i DRAINAGE PLAN

nN 11000 AB PROJECT No. APPROVED. fl

be ora coon 4158 W mucin ent! BALM LAKES - COOROY calibre econ ay etree SHEET 2 OF 2 =
it [rows aur oF cues coun a ory RETIREMENT COMMUNITY CONSULTING erecta eee nome B14158.W-SK111

 

 

 

Page 25

SPA


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  

 

 

 

 

 

 

 

 

 

 

SUB- IMPERVIOUS ] PERVIOUS
catcument_| AREA (e) | percentace | percenTace | LEGEND.

E1 (ROOF) 0.558 100 0 SITE BOUNDARY

£1 (ROAD) 0.243 60 40

Et (GROUND) 0.189 20 80 =o MUSIC CATCHMENT BOUNDARY

FA (ROOF) 1.227 100 0

F1 (ROAD) 0.610 60 40

F1 (GROUND) 0.480 20 so | ©. DESIGN CONTOURS

G1 (ROOF) 1.081 100 0

G1(ROAD) 0.388 B 2% EXISTING CONTOURS

G1 (GROUND) 0.556 80 20

£2 (ROOF) 0.491 100 0 IMPERVIOUS AREA 4 Y

£2 (ROAD) 0.237 60 40 L.

£2 (GROUND) 0.217 20 80 ROOF AREA 7

E1 (PARK) 0.038

£3 (ROOF) 0.006

£3 (GROUND) 0.304

£4 (ROOF) 0.032

£4 (GROUND) 0.171

FI (PARK) 0.253

F2_ (ROOF) 1.048

F2 (ROAD) 0.571

F2_ (GROUND) 0.406

F2 (PARK) 0.007

F4 (ROOF) 0.295

F4 (GROUND) 0.126

H_ (GROUND) 0.589

G2 (ROOF) 1.450

G2 (ROAD) 0.711

G2_ (GROUND) 0.826

F3 (PARK) 0.664

F5 (ROOF) 0.371

F5 (ROAD) 0.146

F5_ (GROUND) 0.393

F5 (CAR PARK) 0.240

EXT F GROUND 1.167

EXT F ROAD 0.372

EXT G GROUND 0.942

EXT G ROAD 0.342

TOTAL 18.347

 

 

 

 

 

    

     

FILE: B14158.W-SKN10.dug__DATE: 12-11-2015 TIME: 08:49
Pxref's: X_Btht58.W_BASE X_B14158.W MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde

 

 

 

 

 

SOUTHERN |/,
BASIN |i

 

 

 

 

 

  
      

  

 

Fog bales do lal
ia aaa a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SOS

sUnetastaelata pla
dhehehe dale!

 

 

Ti ap |

 

 

 

 

zy

 

 

 

 

 

 

Se

Se

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

te RT,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 
 

 

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST
ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03.

NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

CONCEPT PLAN ONLY

 

 

 

FIRST [CALCS [DRAWN] _OATE
vwsue Tce [Iw | 05.02.16

 

AMENDMENT DETAILS.

 

=>

oszmEozm!
=m Sol @] >

 

 

DESIGN CHECK

1000 10

0

SCALE (METRES 7 MIGROFIM No “CLIENT
SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
7020304050 AT Ph (07) 5443 2844 Fax (07) 5443 7146

PALM LAKES RESORT

 

PROECT

 

 

 

 

 

 

 

 

 

 

DRAWN CHECK|

 

2000

AB PROJECT No. "APPROVED.

B14158,.W SNIATIE HEL RPE Te PALM LAKES - COOROY

RETIREMENT COMMUNITY

FOR & ON BEHALF OF CALISRE CONSULTING (QLD) PTY LTO

 

 

 

 

C cn Parsun IMPERVIOUS AREA
4 PLAN

 

Calibre Se eee =
CONSULTING (ales noms saves tony gua eevee 325M B14158,W-SK112

 

 

 

 

Page 26

 

PROPOSED 6m WIDE
DRAINAGE EASEMENT

2.48m

CARPARK a

 

EXTENDED
DETENTION
DEPTH

CARPARK
RL 98.82

 

 

 

 

 

 

 

 

 

 

  
  
  

ENERGY DISSIPATER SUBJECT
TO DETAILED DESIGN

 

BIOPOD FS
FILTER AREA: 16m?

TOTAL BASIN SURFACE AREA: 100m?
EXTENDED DETENTION DEPTH: 0.2m
FILTER DEPTH: 0.4m

 

 

 

       

SURFACE

LEGEND:

SITE BOUNDARY

SWALE

BIOPOD FILTER

PROPOSED STORMWATER DRAINAGE

PROPOSED STORMWATER EASEMENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 <1 3 >:
3
i 3
§
=
So Ee
&
m
TYPICAL BIOPOD DETAIL
SCALE 1:25 (A1) NOTES:
SCALE 1:50 (A3) —
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
BIGISB.W_03. CONSTRUCTION PURPOSES
nar [ones [raw] ATE SORE METRES T TACROPEN Wo SENT DRAWN TLE
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES sy
meio [Ss fos 10 1050 1 2M 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA CONCEPT STORMWATER
ie oe 43 Ph (07) 5443 2844 Fax (07) 5443 7146 — i DRAINAGE PLAN
c PROECT -
pic DRAWN CHECK] PROJECT No. APPROVED ANDREW McPHAIL RPEQ 6921 Call Consuting (QLD} Pty Lid
ae tata ————— . B14158.W HATTA ALL ea 5 PALM LAKES - COOROY Call re Ger er Mag Dud paid Lame TSU
. i oat
sir FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD RETIREMENT COMMUNITY CONSULTING Dace Cetrt bow tytn Capon bueno ‘TSE B14158.W-SK113

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.