RFI Eng response notice items 4-19 MCU150111
Attached to the e-mail MCU15/0111 Response to information request - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy - email 1 of 2.
Calibre Consulting (Qld) Pty Ltd Ground Floor, 545 Queen Street Brisbane QLD 4000 PO Box 10349 Adelaide Street Brisbane QLD 4000 T +61 7 3895 3444 ABN 38 109 428 506 Our Ref: B14158.W.10A - Response to RFI.docx Your Ref: MCU15/01111 Contact: Andrew McPhail 5 February 2016 Noosa Council 9 Pelican St Tewantin Qld 4565 Attention: Dennis Wallace Dear Dennis Palm Lake Retirement Village Information Request Response – Selected Items Material Change of Use Application: MCU15/0111 Calibre Consulting (QLD) has prepared various Stormwater Management Plans for this site. The current MCU application was supported by report B14158-03A Dated 12 November 2015. This letter is in response to Council’s Information Request dated 21 December 2015 for the Palm Lake Retirement Village Development Application. This letter specifically addresses engineering items (Items 3 through to 19). Responses are based on new analysis and discussions with council offices on 13 Jan 2016. Item 3. Submit a Waste Management Plan in accordance with Noosa Planning Scheme Policy 11 – Waste Management Plans. The Plan must demonstrate how the proponent will comply with Noosa Planning Scheme Policy 9 – Waste Management. The plan must also address refuse truck accessibility and turning paths within the site in compliance with Council’s requirements. Our Response Calibre Consulting has prepared an engineering drawing (attached 15-001261 sheet SK114) indicating turning paths for the street layout over the site. Further details concerning the Waste Management refer to Palm Lake Works. Item 4. Provide updated survey plan encompassing the entire development site and any relevant features and survey data external to the site. Our Response Calibre Consulting has prepared drawings (attached 15-001261 sheets SK110 to SK113) indicating the existing survey of the site compiled from various survey sources. calibreconsulting.co
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 25 pages
Page 2
2 of 8
Item 5. Provide updated traffic report for the current proposal including any additional traffic generation
associated with the increased development on the site. The updated report should also investigate any the
required upgrade works on the external roads and road intersections in accordance with current applicable
standards and traffic data.
Our Response
Calibre Consulting has prepared a Traffic Impact Assessment Report No. B14158ER02 (attached) this report indicates:
• The additional traffic generation associated with the increased development on the site is 28vph during peak
hour periods
• Based on the assessment of the network it is concluded that the road links and intersection arrangements as
proposed will be able to accommodate the anticipated traffic volumes to at least the ultimate design year of
2028. The forecast demand estimates are based on the ultimate development scenario as outlined above.
• The key finding of this traffic impact assessment is that the proposed intersection treatments and infrastructure is
sufficient to support the proposed development, which was previously approved in the earlier site development
approvals (Refer Council’s DA Ref No: 132007.2398.02). There are no adverse impacts anticipated as a result of
the development traffic generated by the expanded developable site area. Based on the analysis there are no
further mitigation measures proposed.
• The current level of design detail available for this DA phase shows that the proposed development layout is
compliant with the relevant State Planning Codes.
Item 6. Provide information and updated drawing/s of the development site to indicate the proposed earthworks
and finish levels including but not limited to the following:
(a) Relevant cross sections and details to depict the extent and the changes to the surface levels.
(b) Any required earth retention works (eg retaining walls, batters) particularly for the eastern part of the site eg
near the proposed club house, proposed basins and the retained house and shed on proposed Lot 101.
Our Response
Calibre Consulting has prepared concept bulk earthwork drawings (attached 15-001261 sheets SK102 to SK106). These
plans indicate changes to surface levels and retaining walls.
Item 7
(a) Stormwater runoff rates from the developed site must be maintain to its predevelopment rates for all
storm events up and including 100 years storm event and taking into consideration the retention
capacities of dams exist on site prior to the development works.
Our Response
Previous approved analysis for this site was undertaken for all return intervals and as per ARR 1987, that is modelling of
a range of storm burst. It was determined that for all Return Intervals the developed flows were below predevelopment
flow rates (refer Table 3-9 in report B14158.W-03A). It was assumed that storms prior to the peak storm burst have filled
the existing dams to their capacity. This is considered standard practice for flood studies.
As requested by Council further analysis was undertaken to assess possible impact of the volume of the dams. We have
compared the volume of dams (if empty) to the volume of the inflow hydrograph. Analysis has been diagrammatically
represented for the four (4) existing dams, for the 1 yr ARI and 100yr ARI critical storms, refer to attachments A and B.
Analysis has shown for a 1 yr ARI and 100yr ARI storm event the dam volumes equate to 1.1% and 0.4% of the inflow
hydrograph volume respectively. In reality the percentage will be lower as the dam will not be empty as the storm burst
commences. Therefore, the dams will be filled significantly before the peak site flow and have no impact on the existing
flow of the site.
Page 3
3 of 8
Therefore analysis methodology and results presented in the November 2015 report are appropriate.
(b) The SWMP shall investigate the impact of the development on the existing drainage conditions on other
properties, including road reserve and parks areas, and make recommendations for any necessary
stormwater works and/or mitigation measures to ensure no adverse impact caused to other properties
(reference is made to downstream Discharge Locations A and B on the submitted plans).
Our Response
The report shows that mitigated flows at discharge location A and B are below predevelopment levels (Refer Table 3-9 in
report B14158.W 03A) therefore there is no adverse impacts on other properties.
Please note that we are not changing the swale between the Central basin and Point B. Therefore only the same flow will
enter the Council reserve at Point B and swale banks will overtop in the current manner in higher events. At Point A we
will provide an energy dissipater and level spreader to ensure no concentration of the flows to the adjoining site.
Additional pipework is to be installed at the Trading Post Road cul de sac to ensure that flood conditions are not impacted
once the cul-de-sac is formed and adjacent gully filled.
As indicated in the attached DWG B14158.W-SK111 and SK110 Issue A, a stormwater drainage pipe will be constructed
from the cul-de-sac head to the Northern swale. This pipeline will convey at least the 1 in 20year ARI flow. This greater
than the Council standards. Flows in excess of the pipe system will be conveyed through the site. Final details subject to
detailed design.
(c) All underground piped stormwater drainage must be designed to accommodate 5 years storm event with
all overland flows be located with the roads and open space area and catering for 100 years storm event
as minimum.
Our Response
Council’s request is acknowledged. This will be incorporated into future detail design drawings.
(d) General plan/s showing the proposed stormwater system including pipe sizes and the overland
secondary flow paths. Where possible, overland flow paths should be streamlined and sharp bends be
avoided to alleviate the potential of breach and damage. The plan/s should also indicate any proposed
external stormwater drainage works (eg stormwater drainage collection in Trading Post Road).
Our Response
The pipe system has been designed to comply with the site layout which is consistent with previous site approvals. As
discussed with Council on 13 January, the pipe systems will be designed for minimal overland flow at the sharp bends of
the pipelines. Additional pits will be incorporated upstream of bends so that there will be minimal overland flow. Refer to
Drawing B14158.W Sheets SK110 and SK111 for details.
Concept details of pipeline sizes downstream of basins have been indicated on the attached drawings.
(e) All the necessary drainage easements on the site in Council’s favour where required.
Our Response
As discussed with Council on 13 January, minimal measures are required. Proposed stormwater easements are now
shown on drawings. Refer to Drawing B14158.W Sheets SK110 Issue A and SK111.
Page 4
4 of 8
(f) Clarification regarding the depth of water in proposed basins during major storm events particularly for
the central basin (reference is made to Table 3-10 of the SWMP) and any proposed safety measures.
Our Response
Council officers clarified their safety concern was regarding the Central Basin where the combined pond depth and
potential stormwater detention storage being approximately 3.7m.
The following safety measures have been incorporated into the basin design to minimise access to the ponded area:
• Thick planting and safety bench around the perimeter of the pond to discourage entry into pond;
• Retaining walls over 1m are to be fenced;
• There are multiple points around the basin with batter slopes flatter than 1 in 5 to enable easy access out of the basin
area; and
• 1 in 6 access track provided at the downstream end of the basin.
It is noted that maximum ponding has a low likelihood of occurring dying any year (1% Annual Exceedance probability)
The normal ponding area has measures to limit access or risk (dense planting and shallow benches).
We have prepared a Safety in Design review for the Central Basin, attached, to further demonstrate that safety matters
have been addressed.
Item 8. Remodel with consistent surface type and runoff parameters. Otherwise, provide justification with
previous acceptance by Council Officers for the disparity between the surface type and runoff input parameters.
Our Response
After additional review a minor error was identified that had no consequential impact on the design, the parameters for
catchment G2 are commercial when they should be residential.
The MUSIC model has been updated to reflect the proposed landuse and the proposed site layout Palm Lake Resort
Dwg C0-000-2014 Rev H (Attached)
Item 9 Update the MUSIC model to be consistent with MUSIC Modelling Guidelines. In particular, confirm default
values are used for the serial correlation.
Our Response
We can confirm that stochastic generation was used and that the serial correlation values were as per the MUSIC default
value (0). No action necessary.
Item 10 Revise the MUSIC model without the pond system included as at treatment node. Otherwise,
demonstrate how constituent loads within the waters entering the pond will be at concentrations that are
unlikely to cause an algal or cyanobacteria outbreak.
Our Response
As discussed with Council officer on 13 January, we believe that the standards quoted were not applied correctly. The
MUSIC Modelling Guidelines (Water by Design, 2010) state:
“MUSIC is generally not suitable for modelling water quality treatment in natural waterways, natural wetlands,
naturalised channel systems, environmental buffers, and lake and pond systems. These are receiving
environments and cannot in any case form part of the stormwater treatment train for an urban catchment”.
(underline added to highlight).
Page 5
5 of 8 The proposed central basin/water quality control pond (WQCP) is to be constructed and has an area of 2000m². The WQCP is not a receiving environment. Council’s planning scheme identifies waterways/receiving environments approximately 1.6 km downstream of this site. The WQCP is a site control and landscape feature. Modelling of the pond was discussed with Mr Mircea Stancu from eWater, the company that developed the modelling software. It was his view that ponds can legitimately provide stormwater treatment. This is evident by the fact that there is a pond treatment node in MUSIC. He agreed that pre treatment before the pond is recommended. An opinion was also sought from the Manager of Water by Design (author of the Guideline reference above) regarding a receiving environment. It was his opinion that a receiving waterbody is a lake, river or bay that accepts stormwater discharge and is the environment that we are seeking to protect. A small pond would not necessarily represent the ‘ultimate receiving water body’. The Manager highlighted two potential concerns regarding ponds outlined below: – Where ponds are owned by Council there may be ongoing maintenance costs. This, however, is not an issue as the pond will be owned by the developer and all maintenance costs would be borne by the site operators. – The pond may experience a deterioration in water quality. This is also not seen as an issue as the pond will receive significant pre-treatment to address water quality concerns. (A copy of the correspondence is attached in Attachment C) As indicated in report B14158.W-03A and attached drawings the majority of the catchment to the central basin will have pre-treatment, either at the central or southern bio retention basins. Some local catchments (catchment F3) adjacent to the control pond will not be pre-treated but this area is mainly landscaping. Due to the high turn over in the WQCP (approximately 14 days for the 20th percentile) and high pre-treatment, the risk of algal blooms and poor water quality is low. If low quality water is identified the site operator can follow practices outlined in the Stormwater Management Construction and Maintenance Plan (B14158.W-09A). It is our view that the proposed pond is a small site control and as such it should not be considered as part of the ultimate receiving waterbody. Therefore as per discussions with eWater the pond can be considered as part of the treatment train. Further MUSIC analysis shows that the pond only provides a small percentage of treatment (6% TSS, 7% TP and 1% TN load reduction) and can be seen as the final polishing of stormwater only. In conclusion we have not removed the WQCP from the model. Item 11 Provide a Concept Maintenance Plan to be approved as part of the MCU. The Concept Plan must include objectives for detail design as well as operation/maintenance of the Stormwater Treatment Train including all end of line receiving waters on the site – such as the Pond. The Concept Maintenance Plan is to detail trigger points to manage risks of algal or cyanobacteria blooms within the pond prior to an algal or cyanobacteria outbreak occurring. Our Response As discussed with Council the requirement for a Concept Stomwater Construction Management and Maintenance Plan is typically in relation to operational works application. Also the average turnover time for the pond water is approximately 14 days (20th percentile hydraulic Residence Time) as such there is reduced likelihood of cyanobacteria outbreaks occurring. However, as agreed the Concept Stormwater Construction Management and Maintenance Plan (Report No B14158W- 09A)) has been provided for further advice regarding management of potential algal blooms.
Page 6
6 of 8
Item 12 Provide calculations for “Developed site only with Mitigation”.
Our Response
It is our view that inclusion of external catchments in the MUSIC model provides a more accurate assessment of the
treatment performance. A revised version of Table 4-6 of Report B14158.W-03A is presented below. Note the MUSIC
model was revised to account for a change to carpark areas in Sub-catchment F5, as per Palm Lake Resort Drawing C0-
000-2014 Rev H.
From the Table below, the pollutant load reduction targets have been calculated for the developable area of the site.
MUSIC modelling indicates that the proposed treatment train provides a reduction of pollutant loads greater than what is
required. Since the load retained on site is in excess of the targets, the treatment train is considered to be meeting the
water quality objectives.
Table 4-6 MUSIC Modelling Results
Description Pollutant Load (kg/year)
TSS TP TN GP
Developed Site Only (Without Mitigation) 23200 57.3 406 3910
WQOs (Percentage Reduction) 80% 60% 45% 90%
Load Reduction Target 18560 34.38 182.7 3519
Developed Site plus External Catchment (Without Mitigation) 29700 69.20 456 4150
Developed Site plus External Catchment (With Mitigation) 10200 34.60 269 381
Load Retention Achieved 19500 34.6 187 3769
Load Retention Achieved as % of Developed Site Load 84% 60% 46% 96%
Water Quality Objective Achieved (SPP 4/10) YES YES YES YES
Developed Site without External Catchment (With Mitigation) 15370 29.10 177.0 3529
Item 13 To reduce pressure on the pond, demonstrate whether there is any opportunity to retrofit a water quality
treatment facility within the road reserve or other location within the development so that any activities on the
road system will not be attributed directly to any issues within the pond system.
Our Response
Flows are to be pre-treated prior to entering the central WQCP via bioretention basins. It appears that a flow split pit on
Drawing B14158.W Sheet SK101 was not recognised. This plan has been updated for clarity.
Item 14 Provide the Music Model and Auto Cad files or other mechanism to demonstrate that proposed nodes
and impervious areas are consistent with development plans.
Our Response
The areas of imperviousness was reviewed for each park node in the MUSIC model. The park node for catchment F3 has
15% imperviousness. The park nodes for catchments E1, F1, F2, F3, F5 have 0% impervious, however these catchments
are relatively small and do not need additional imperviousness as this area is captured in separate nodes. Refer attached
plan B14158.W Sheet SK112 which indicates areas of imperviousness.
Page 7
7 of 8 Item 15 Provide commentary to confirm that the Nodes proposed for the Bowling Green and Park will most adequately represent the nutrient fluxes from those uses. Our Response The proposed bowling green is to be constructed with synthetic grass and has a roof. For the purposes of the MUSIC model, the bowling green has been modelled as a roof. As per the Stormwater Construction Management and Maintenance Plan, it is advised that landscaping areas directly adjacent to the WQCP are not fertilized in order to minimise high nutrient runoff from entering the pond. Item 16 Detail Invert Levels for outlet structures of all water quality treatment devices, along with surrounding land surface levels to demonstrate that adequate fall is available for stormwater discharges. Our Response Invert levels have been added to the plans to show that there is adequate fall for all basin outlets. Refer attached Drawings B14158.W Sheet SK103 and SK104. Item 17 Demonstrate how the design of the bioretention basins, including location and heights of retaining walls is consistent with the recommendations of the Water by Design Bioretention Technical Design Guidelines for depth of filter media to surrounding areas and retaining wall heights. Our Response At the central bioretention basin the concept design plans for the site indicate a maximum wall height of 1.6m and 1.5m. This is considered to be reasonable for such developments. It is noted that the Water by Design Bioretention Design Guidelines recommend for wall heights exceeding 800mm that multiple walls be used with a 3m wide terrace in between the walls. It is suggested that this is an onerous requirement and not relevant where only one side of the bioretention basin is walled. Item 18 Provide commentary regarding the functional consistency between proposed weir width details shown on proposed detail design drawings and the MUSIC model weir width input data. Our Response The width of the weirs shown on plans are inconsistent with the MUSIC model. This issue has been corrected in MUSIC model and has little impact on the results. All objectives have been achieved. Item 19 Provide calculations in accordance with the Queensland Urban Drainage Manual to demonstrate that the confluence of stormwater at the drainage easement will not cause scour and that any required dissipater/erosion control can be contained wholly within the applicant’s property. Our Response We appreciate council’s concerns regarding scour protection. However it is possible that pipe network may change during the detailed design phase. As such we would suggest that detailed calculations are provided to demonstrate scour risk mitigation at the Operational Works phase. Please condition approval appropriately.
Page 8
Bofs We trust the information provided in this letter is acceptable and satisfactorily responds to Council's Information Request Items 3 through to 19. Should you require any further information please do not hesitate to contact the undersigned on (07) 3895 3444, Yours sincerely Calibre Consulting Andrew MéPhail Principal Engineer ATTACHMENTS Attachment 1 Dam volume analysis Attachment 2 Safety in Design Attachment 3 Correspondence with Water by Design manager Attachment 4 = Palm Lake Resort Drawing C0-000-2014 Rev H Attachment 5 = Stormwater Construction Management and Maintenance Plan B14158.W-09A Attachment6 Concept Drawings B14158.W-SK100 B14158.W-SKi01 B14158.W-SK102 B14158.W-SK103 B14158.W-SK104 B14158.W-SK105 B14158.W-SK106 B14158.W-SK107 B14158.W-SK108 B14158.W-SK109 B14158.W-SK110 B14158.W-SK111 B14158.W-SK112 B14158.W-SK113 PARwnNa
Page 9
Attachment 1
15‐003352 ‐ Palm Lake, Cooroy
Existing 100yr ARI conditions (RAFTS Model) and influence of existing farm dams on catchment hydrology
Site flows and Farm Dam fill times
6
5
4
100yr ARI Flows (cumecs)
3
2
1
0
0 0.5 1 1.5 2 2.5 3
Time (hrs)
A2 B4 B3 C2 OUT N Basin Centre Basin Centre South Basin South Basin TOTAL
Centre South
Dam N Basin Centre Basin South Basin TOTAL
Basin
Weir level (mAHD) 99.75 98.75 99.75 102.75 -
Bund level (mAHD) 100.25 99 100 103 -
Dam Area (m2) 888 1246 415 1066 3615
Estimated Dam Volume (ML)
1.345 2.001 0.544 1.625 5.515
(Assumes 2m depth; 1:2 batters)
Model Output Location Node A2 Node B4 Node B3 Node C2 OUT
Dam fill time (hrs): 0.30 0.23 0.18 0.27 0.28
Total Flow Volume (ML): 180 1127 536 487 1437
Est. Dam Volume as % of
0.7% 0.2% 0.1% 0.3% 0.4%
Design Storm Flow Volume
Page 10
Attachment 1
15‐003352 ‐ Palm Lake, Cooroy
Existing 1yr ARI conditions (RAFTS Model) and influence of existing farm dams on catchment hydrology
Site flows and Farm Dam fill times
1.4
1.2
1
1yr ARI Flows (cumecs)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3
Time (hrs)
A2 B4 B3 C2 OUT N Basin Centre Basin Centre South Basin South Basin TOTAL
Centre South
Dam N Basin Centre Basin South Basin TOTAL
Basin
Weir level (mAHD) 99.75 98.75 99.75 102.75 -
Bund level (mAHD) 100.25 99 100 103 -
Dam Area (m2) 888 1246 415 1066 3615
Estimated Dam Volume (ML)
1.345 2.001 0.544 1.625 5.515
(Assumes 2m depth; 1:2 batters)
Model Output Location Node A2 Node B4 Node B3 Node C2 OUT
Dam fill time (hrs): 0.50 0.40 0.33 0.47 0.48
Total Flow Volume (ML): 65 407 192 181 516
Est. Dam Volume as % of
2.1% 0.5% 0.3% 0.9% 1.1%
Design Storm Flow Volume
Page 11
Glenn Browning
From: Andrew O'Neill <[email protected]>
Sent: Wednesday, 20 January 2016 8:13 PM
To: Glenn Browning
Subject: Re: Receiving Waterbody Definition
Hi Glenn
I would agree mostly with what you’ve written, probably more accurate to say that a small
pond won’t necessarily represent the ‘ultimate’ receiving environment. I know that councils
typically don’t want to consider ponds as part of a treatment train for 2 reasons:
1. For those that will come into their ownership because of ongoing maintenance issues
that are commonly associated with these assets.
2. It could be agreed that at times ponds will perform a treatment function (primarily
through sedimentation), at other times they can easily worsen water quality leaving the
site.
Sorry, it’s hard to be definitive on this one, but ponds and lakes are generally only desirable if
they’re going to have a really good maintenance regime. In that case, it can be a benefit to
the ultimate receiving waters, but at significant cost.
A
Dr Andrew O'Neill
Principal Scientist – Manager, Water by Design
T (07) 3177 9107 | F: (07) 3177 9190
E [email protected]
1
Page 12
W www.healthywaterways.org
L Level 4, 200 Creek Street, Spring Hill 4004
P PO Box 13086, George St, Brisbane Qld 4003
From: Glenn Browning <[email protected]>
Date: Wednesday, 20 January 2016 at 4:57 PM
To: andrew oneill <[email protected]>
Subject: Receiving Waterbody Definition
Hi Andrew,
Thank you for the discussion earlier today.
Further to our conversation, could you please confirm this general summary of our discussions?
- A receiving waterbody is a lake, river or bay that accepts stormwater discharge and is the environment that
we are seeking to protect. A small constructed isolated pond on an individual site would not necessarily
satisfy the definition of an receiving environment.
- A pond could be part of the treatment train however it would be recommended to have pre-treatment to
reduce maintenance and minimise the potential of risks such as algal blooms.
Thanks for your assistance on this matter.
Glenn
Glenn Browning
Engineer – Water & Environment
Calibre Consulting (Qld) Pty Ltd
Ground Floor, 545 Queen Street, Brisbane, Qld, 4000
PO Box 10349, Adelaide Street, Brisbane, Qld, 4000
T 07 3895 3444
E [email protected]
www.calibreconsulting.co
The information contained in this e-mail and any attachments are confidential and are intended solely for the use of the addressee or
someone authorised to receive the addressee's e-mail. If you have received the e-mail in error, please notify the sender by return e-mail,
delete the e-mail from your computer system and destroy any printed copy. There is no warranty that this email is error or virus free. It may
be a private communication, and if so, does not represent the view of Calibre Consulting (Qld) Pty Ltd.
2
Page 13
EXISTING SWALE
EXISTING HOUSES
AND SHEDS
NORTHERN
EXISTING DAM
EXISTING HOUSES
AND SHEDS
EXISTING @ 300
PIPE
LOT 2
RP165418
EXISTING SHED
wk
EXISTING @450 RCP
x 4
CENTRAL \ a
EXISTING DAM
EXISTING HOUSES
AND SHEDS
LOT 1 M,
RP 165418 / >
/ n on sa
/ NN RP215922
g
Bt
“ON Nw 4 EXISTING $375 N \ \
\%
ee a a eS
COOROY CONNECTION ROAD
a=
—
. \ EXISTING 900x300 ==
ZZ ~ BOX CULVERT _— oe EXISTING 1350x300
SEZ —_ BOX CULVERT
LEAK _— -_
LG ~~ a
APPROXIMATE ALIGNMENT OF ELEVATED RAILWAY
CORRIDOR (TOP OF CATCHMENT).
SOURCE: MAPVIEW - QLD GOVERNMENT DEPARTMENT
OF NATURAL RESOURCES AND MINES (2006)
—
LEGEND
APPROXIMATE SITE BOUNDARY (MCU) » FLOW DIRECTION
EXISTING SCENARIO EXISTING CONTOURS
—— ee CCATCHMENT BOUNDARY
EXISTING SCENARIO @ DISCHARGE LOCATION
CATCHMENT LABEL NOTES:
FLOW PATH 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No. 814158. NOT TO BE USED FOR
CONSTRUCTION PURPOSES
FILE: B14158.W-SK100.dwq DATE: 12-11-2015 TIME: 08:47
iXref's: X_B14158.W_ BASE X_B14158.W_EXISTING X_B14158.W_TITLE USR: Sam Linde
Tar [ours ane] On SORE TETEET TROOP To caer SAWN TE
AMENDMENT DETAILS pewen Cmox SURVEYOR: KEN HICKS & ASSOCIATES F~
a 49 THe ESPLANADE MAROOCHYDORE, PALM LAKES RESORT C —_ EXISTING SCENARIO
h
ae wee Be em | FI scar : CATCHMENT PLAN
D DRAWN CHECK f 1:2500 AZ to.
I B14158.W ANINTHEW HL PED TT PALM LAKES - COOROY Calibre see oe ao
NIE . Tel 07 3895 3444 Focsmi ee
oF FOR & ON BEHALF OF CRLBRE CONSULTING (LO) PTY LTO RETIREMENT COMMUNITY CONSULTING Cen umes ten naoes ecarvoe CGS! B14158.W-SK100 A
Page 14
SPA
[OCR of page images]
\
NORTHERN BASIN EXISTING SWALE
\ SOUTHERN BASIN PEAK FLOWS ABOVE
\ THE 1 YEAR ARI STORM TO BE DIRECTED
pay TOWARDS PROPOSED EASEMENT
p es
= ®, A
ge > INS E <i TRADIN Z
Q x J] -
4 BASIN ll Se NS POST ROAD- - 4
> U pgSiaIai
Gi it ESCETITIT)
sy TOOLS oo ie
= = : = = aol cattaratatat ti \
i PaCETETETITE Fh \
44
[fi Fa GELEGI LILY bid
| CePEPEPirt Pat
yas
(fee
nt ie
X
COOROY CONNECTION ROAD —
ne a a —_ —__n
LEGEND: _ ™
‘ —
SITE BOUNDARY _— =a oe SITE DRAINAGE AND ROAD NETWORK
~ a DESIGNED TO CONVEY 100 YEAR ARI PEAK
——_— =— = DEVELOPED CATCHMENT BOUNDARY FLOWS OF UPSTREAM EXTERNAL CATCHMNET
wo PROPOSED STORMWATER DRAINAGE
UPSIZED SITE DRAINAGE NETWORK AND STORMWATER EASEMENT
TO CATER FOR UPSTREAM EXTERNAL CATCHMENT FLOWS
WATER QUALITY CONTROL POND
OR BIORETENTION BASIN *
» FLOW DIRECTION
» 1 YEAR ARI PEAK FLOW DIVERSION
NOTES:
@® SITE DISCHARGE LOCATION FOR FURTHER BASIN CONFIGURATION REFER 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
ao os SS He EXISTING SWALE TO DETAILS PROVIDED ON SUBSEQUENT LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
PLANS, SIZING SUBJECT TO DETAILED DESIGN. B14158.W-03. CONCEPT PLAN ONLY
PROPOSED EASEMENT (STORMWATER/SERVICES
( ) 2. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOWS TO GPT CNC TRCTEN HiRPOws
AND BIORETENTION BASIN
mar [ens [oe] a SORE TITREST THCROFT Tor STENT DRAWNG THE
AMENOMENT DETAR DesIw cHECK SURVEYOR: KEN HICKS & ASSOCIATES , an
Nn a 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT C CCONGULT AUSTRALIA DEVELOPED MITIGATED
Sie fac Cane |r ater ara a Ph (07) S443 2846 Fax (07) $463 7146 Le wi CATCHMENT PLAN
B(e] cB | ww | 05.02.16 | LavouT AMENDMENTS Dawn cueck | 2200 A3 PROJECT No. "APPROVED. H
zp 814158 W ata S28] PALM LAKES - COOROY Callore Geltgseten sham candi Ee Learns =a
NIE a Te 07 3895 3444 Facsimile 07 3895 3400
sr FO ON HELE OF CALE COILING PTY 1 RETIREMENT COMMUNITY CONSULTING ir ten tae te te tenon SE B14158,W-SK101 c
Page 15
SPA
[OCR of page images]
Sw0-
—— =| oS =
WLM
ELLA
_—
SITE BOUNDARY
MUISIC CATCHMENT BOUNDARY
PROPOSED STORMWATER DRAINAGE
PROPOSED FLOW PATH
WATER QUALITY CONTROL POND
OR BIORETENTION BASIN *
MODELLED AS COMMERCIAL
STORMWATER DRAINAGE EASEMENT
AND SERVICES CORRIDOR
WOODWORKING/GOLF ROOM x
AND TENNIS COURTS
hy
\ CARETAKER’S Aes
S of
|.) BOWLING |_|
GREENS
120 BED AGE
CARE FACILITY
comet Rating
COOROY CONNECTION ROAD -- - ae KE »
EXT F =e
eee ee ee oe Ee EXT G KS
— _—— ~ Sd ~\
— — ~ \
— = — —
_—
— ]
—
— ae
€) MUSIC CATCHMENT LABELS MUSIC_CATCHMENT PLAN
SCALE 11250 (At)
>» FLOW ARROWS SCALE 1:2500 (A3)
MODELLED AS AREAS
| BYPASSING TREATMENT
CARPARKING AREA CATCHMENT F5
igasaeaasseassaninad TO BE TREATED BY BIOPOD FS NOTES:
* or FURTHER BASIN CONFIGURATION REFER
1. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH CALIBRE CONSULTING REPORT No. B14158.
FILE, BU41S8.W-SK102.duq DATE: 12-11-2015 TIME: 1531
Piref’s: X_BIs158.W_TITLE X_B161S8.W_BASE USR: chris mok
TO DETAILS PROVIDED ON SUBSEQUENT
PLANS, SIZING SUBJECT TO DETAILED DESIGN.
2. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOWS
TO GPT AND BIORETENTION BASIN.
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
oe Tcnmnn one “coun cneoe SORE TETAS TICROPTN SURVEYOR KEN TICKS & ASSOCIATES SENT
rar 15.02.16 J LAYOUT AND CATCHMENT AMENONENT 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT
ie 11250 25 0 25 so At Ph (07) 5443 2844 Fax (07) 5443 7146
8 4.2500 AB PROECT
pic DRAWN CHECK PROJECT No. APPROVED
e Bits. W wesaagat mt | PALM LAKES - COOROY
HG :
SIF FOR & ON BEHALF OF CALBRE CONSULTING (QLD) PTY LTD RETIREMENT COMMUNITY
Cc non
‘DRAWING TITLE
MUSIC CATCHMENT
PLAN
i Calbre Consuting (QLD) Py Lid
Ca re Level 6, 199 Gray Sroe, South Brisbane QLD Amiri 4101
‘Telephone 07 3895 3444 Facsimile 07 3895 2400
CONSULTING (Beare Garber MBownie thay Capone Valine Coast
1 a
‘DRAWING NUMBER
B14158.W-SK102 A
Page 16
MATCH EXISTING LEVELS AT BOUNDARY RL 97.7m AHD < 1 | rc T | S S| i a] ‘tm WIDE BASIN EMBANKMENT | | -| RL 101.0m AHD L EXISTING DAM AND EMBANKMENT TO | fl | BE RECONSTRUCTED TO FORM COMBINED \ | BIORETENTION AND DETENTION BASIN | L W | Se | WS |S | tin 4 | ‘| Vv | Dy | |— NORTH BASIN - COMBINED BIORETENTION UZ | AND DETENTION STRUCTURE | FILTER AREA: 450m? . | TOTAL BASIN SURFACE AREA: 530m? . EXTENDED DETENTION DEPTH: 0.3m . | FILTER DEPTH: 0.4m . DETENTION VOLUME TO 100 YR ARI WSL:|~ , * 3 . ‘in \ 1,200m? (EXCLUDING STORMWATER we Roo are | QUALITY PONDING DEPTH) . (\ , wy eee we . y | a er ee | vv oe ew ev ee \\ SECONDARY OUTLET | wee ee we eee |) PIT AT RL 100.5m AHD | PROPOSED SEDIMENT FOREBAY See yore iN OUTLET PIPE [3750 RCP) | ENERGY DISSIPATER TO CAPTURE CN De 9780 AMD COARSE SEDIMENTS AND PROVIDE a Gey ‘| vm | BASIN SCOUR PROTECTION 5 as 1 in 3 | Sf ae y fo \ MATCH EXISTING | PROPOSED RETAINING vo — LEVELS AT BOUNDARY | WALL (0.5m MAXIMUM vo RL 97.8m AHD HEIGHT) hey | ~A | OVERFLOW WEIR FOR | In — MAJOR STORM EVENTS i RL 100.55mAHD (REFER | g TO DRG No. | B14158.W-SK106) | EMERGENCY WEIR FOR | EXTREME STORM EVENTS \ RL 100.70mAHD (REFER TO \ 70270 \ DRG No. B14158.W-SK106) N A N 7 ~ —- PROPOSED RETAINING WALL | (MAX HEIGHT 1.5m) PEAK FLOWS UP TO AND INCLUDING THE aoc occ rrr rrr rrr 100 YR ARI STORM TO —~———T 4} 2 BE DIRECTED TO BASIN 4 / / TENNIS COURTS To] i 1. Zz LEGEND: SITE BOUNDARY EXISTING CONTOURS ‘swo———— swo- PROPOSED STORMWATER DRAINAGE BIORETENTION FILTER ROCK ARMOURING/ ENERGY DISSIPATER INDICATIVE DESIGN LEVELS FLOW DIRECTION NOTES: LAYOUT OF THE PRELIMINARY STORMWATER MANAGEMENT STRUCTURES AND PRELIMINARY DESIGN LEVELS SHOWN ARE | | | | | 7 Fl | CONCEPT ONLY AND ARE SUBJECT TO DETAILED DESIGN. | U | | | 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE | — | | LATEST ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03. \S | _ SY 0 ! 0 | | 0 J, LL | _ ot} | Lb 4 | a . | | | | a) PRELIMINARY NOT FOR FOR INFORMATION ONLY CONSTRUCTION NOT FOR CONSTRUCTION FILE: B14158.W-SK103.dwq DATE: 12-11-2015 TIME: 08:48 Xref's: X_B14158.W_ BASE X_B14158.W_TITLE X_B14158.W_CONTS USR: Sam Linde ‘AMENOMEN' s DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES eS Ee 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA PALM LAKES ie woo 2 0 2 4 6 8 9M Ph (07) 5443 2844 Fax (07) S443 7146 | NORTHERN BIORETENTION BASIN N 1400 AB 7 H th Biss W "EMAMLEES| PALM LAKES - COOROY Calibre Eee thee = NIE . Te 07 3895 3444 Facsimile 07 3895 9400 br Ff EAA OF Clb UNSUNG LO PY LD RETIREMENT COMMUNITY CONSULTING ae awa tans Sey oe mamta TEAL B14158.W-SK103 A
Page 17
A
SP
[OCR of page images]
jw | | |
I
[PAD RL 102.20m AHD]|[PAD RL 102.00m AHD]|[PAD RL 101.90m AHD] [PAD RL 107.40m AHD |
PROPOSED RETAINING WALL
(MAXIMUM HEIGHT 1.5m)
ROCK ARMOURING AT OUTLET FOR
SCOUR PROTECTION AND DISSIPATION N
aa
oe
PROPOSED ROAD
! y
-
| / | " \ “*
| / ! EDGE ROCK
| | 12.5m LONG 3 825 RCP OUTLET PIPE
| \ USIL 98.3m AHD
° x \ DSIL 98.2m AHD
| root t000) REEPR TO » : —- \ TO DISCHARGE TO EXISTING SWALE
| Gg SECTION DETAILS Z \ \
RETAINING WALL— 179 - OVERFLOW WEIR FOR
MAX HEIGHT usm Pt ~ p MAJOR STORM EVENTS
|i | Ling \ LEGEND:
I ~— 0 6 \
,
ONDOOO
ROCK ARMOURING \ / SITE BOUNDARY
AT OUTLET \ \/4
——— YO ge PRELIMINARY ROAD
" \ / DESIGN CONTOURS
4
MINIMUM 3m MAINTENANCE Z
» 0 EXISTING CONTOURS
ae ACCESS TRACK / sw PROPOSED STORMWATER
\ 1 DRAINAGE
\I vow,
SPLIT FLOW PIT \ BIORETENTION FILTER
SAFETY FENCING Ae
BE PROVIDED ALONG}
RETAINING WALLS |
'
'
I
RETAINING WALL \, A \
INCOPORATED INTO C N \\ \. OPEN WATER
BOWLING GREEN DESIGN X
\
X ) \ MACROPHYTE ZONE (MIN. 20% OF
NORMAL OPERATING POND AREA)
CENTRAL BASIN - COMBINED WQCP AND DETENTION STRUCTURE
NORMAL OPERATING POND AREA: 2,000m2
NORMAL OPERATING POND VOLUME: 2,000m?
NORMAL OPERATING POND LEVEL: 99.2m AHD
TEMPORARY PONDING LEVEL: 99.6m AHD Ve
EXTENDED DETENTION DEPTH: 0.4m eae aaa a) RETAINING WALL
DETENTION VOLUME TO 100 YR ARI WSL: 4,550m?
(EXCL. TEMP. PONDING DEPTH FOR SW QUALITY 100yr FLOOD LEVELS)
MACROPHYTE AREA: MINIMUM 400m?
(20% NORMAL OPERATING POND AREA)
SWIMMING
POOL
1 YEAR FLOWS
- OVERFLOW WEIR
AT RL 100.5m AHD
ATR
L- |
-- '
~
PROPOSED.
PROPRIETARY GPT
TT ttelellellelbeat eal MAINTENANCE ACCESS ROUTE
INDICATIVE DESIGN LEVELS
BOWLING GREENS
NOTES:
1. LAYOUT OF THE PRELIMINARY STORMWATER MANAGEMENT
DEVICES AND PRELIMINARY DESIGN LEVELS SHOWN ARE
CONCEPT ONLY AND SUBJECT TO DETAILED DESIGN.
LEVELS SHOWN ARE INDICATIVE ONLY.
TOW
BOW
RL 101.7mb
PROPOSED SWIMMING POOL \
RL 100.1m
> (REFER TO LANDSCAPING PLANS FOR
g FENCE AND LANDSCAPING DETAILS)
Dee
|
| |
PAD RL 102.60m AHD
CLUB HOUSE
| | 1 YEAR ARI PEAK FLOWS
PUMP HOUSE | DIRECTED TO CENTRAL BASIN
NON ee | N_ FROM SOUTHERN BASIN
MAINTENANCE TRACK -
ROCK ARMOURING AT OUTLET
FOR SCOUR PROTECTION AND
ENERGY DISSIPATION
PIPE IL = 99.2m AHD
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
B14158.W-03.
LS RETAINING WALL .
v (1.5m MAXIMUM HEIGHT) \
7 BIORETENTION BASIN - UPSTREAM OF WCQP
FILTER AREA: 200m?
BASIN SURFACE LEVEL: 100.1m AHD
EXTENDED DETENTION DEPTH; 0.3m
FILTER DEPTH; 0.4m
3. SPLIT FLOW PIT TO DIVERT 1 YEAR ARI FLOW TO GPT
AND BIORETENTION BASIN.
wee
oe
ACCESS TO CENTRAL BASIN 02
\ AND SWIMMING POOL
NI
CENTRAL BASIN LAYOUT PLAN
SCALE 1250 (AN
SCALE 1500 (A3) NOT FOR PRELIMINARY
FOR INFORMATION ONLY
CONSTRUCTION NOT FOR CONSTRUCTION
FILE: B14158.W-SK104.dwg DATE: 12-11-2015 TIME: 08:48
iXref's: X_B14158.W_TITLE X_B14158.W_BASE X_B14158.W_EXISTING USR: Sam Linde
Trat [eas ea] TEST RTT ST ERENT
AMENEMENT DETAR penn onze] SURVEYOR: KEN HICKS & ASSOCIATES a
me | ae 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONIULT AUSTRALIA CENTRAL BASIN
a 12505 0 5 oom Ph (07) 5443 2844 Fax (07) 5443 7146 | ve LAYOUT PLAN
N 1500 AZ PAPPROVED a)
Wc san once prowect wa ARROTE
1p Bi4158.W ANATTNEW HLL PEG IST PALM LAKES - COOROY Calibre Gonder aba 0 EE -_=
NIE . Te 07 3895 2444 Focumile 07 3895 $400
iF Fo 1 ON SHAE OF CALE CONSLTNG CO TY LT RETIREMENT COMMUNITY CONSULTING tsen tort tases ew oa tere “BERL B14158.W-SK104 A
Page 18
_ — N
oO a oe \
“ - 1 YEAR ARI G900 STORMWATER \
/ a Va FLOW DIVERSION PIPE _— s
7 JL a | oN,
LS PRIMARY OUTLET PIT TO DIVERT | . \
a 1 YEAR ARI PEAK FLOWS \s $ L S ~
S TOWARDS CENTRAL BASIN
Zz
(RL 102.0mAHD)
/
’ / \
BASIN EMBANKMENT MINIMUM *
4 , . LEVEL: RL 103.0m AHD
/ a \
’ ,
J TOW = RL 102.80
“ So BOW = RL 102.10
4 / \
Vv N
/ , >
4 > v s
a a 4 v v y v \
So /™N C&P v v y \.
/ S “ v v v v ‘,
So TOW = RL 103.10 “4 ey . v v v \. 900 STORMWATER PIPE TO N
Y BOW = RL 102.10 AK SECONDARY OUTLET PIT \. CONVEY PEAK FLOWS ABOVE
/ MKS Y TO CONVEY PEAK FLOWS = y Y Ik \, THE 1 YEAR ARI STORM
’ \ 4 v% i ABOVE 1 YEAR ARI STORM v y Hy
\ “ v (RL 102.3mAHD) (
LS . ? A v v \
: “\ ‘ eo e v v Vv
PROPOSED RETAINING WALL (MAXIMUM v v v v
tm WALL HEIGHT) SAFETY FENCING TO LS v a e v v
BE PROVIDED ALONG RETAINING WALL ° v y v v
> v SOUTHERN BASIN (BIORETENTION SYSTEM)] v v Y
7 v v v FILTER AREA = 350m? ee
-- a v v v SURFACE LEVEL = 101.7m AHD kv qT
\ v FILTER DEPTH = 0.4m ey
TOW = RL 103.35 & ov X Y| TEMPORARY PONDING DEPTH = 0.3m e or! ote
BOW = RL 102.75 o 9 9 o vy” vy” ore
T v v v v
! v v v v
v v wv v
| v v v v
1 v v v v
‘ Vv Vv Vv Vv
\ eo) v ey wv v
\ v v v v v LEGEND:
\ v v v SEDIMENT FOREBAY: TO
\ Vv ey a oy v v v CAPTURE COARSE SEDIMENTS PROPERTY BOUNDARY
\ v v Vv
NL. v v v v v v
™, v v v v y EXISTING CONTOURS
v v
SEDIMENT FOREBAY TO vy v y wo PROPOSED STORMWATER
\ CAPTURE COARSE SEDIMENTS \ v DRAINAGE
. .
BIORETENTION FILTER
RETAINING WALL
PARALLEL PARKING
TO BE PROVIDED N
\ LO
NOTES:
1. LAYOUT OF THE PRELIMINARY STORMWATER
QUALITY IMPROVEMENT DEVICES AND
PRELIMINARY DESIGN LEVELS ARE CONCEPTUAL
ONLY AND ARE SUBJECT TO DETAILED DESIGN.
@’ ACCESS/MAINTENANCE TRACK
PIPE TO CONVEY MINOR DESIGN
N STORM FROM DEVELOPMENT
SOUTHERN BASIN LAYOUT PLAN
STORMWATER DRAINAGE SIZED
FOR 1 YEAR ARI STORM EVENT
PAD RL 103.70m AHD
2. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH LATEST ISSUE OF CALIBRE CONSULTING
REPORT NO. B14158.W-03.
SPLITTER MANHOLE TO DIRECT 1
YEAR ARI PEAK FLOWS INTO SOUTH
BASIN AND LARGER EVENTS NORTH
SCALE 1:100 (At) NOT FOR PO EEIMINARY
SCALE 1:200 (A3)
FILE: BI4158.W-SK105.dwg DATE: 12-11-2015 TIME: 08:48 CONSTRUCTION NOT FOR CONSTRUCTION
ref's: X_B1s158.W_TITLE X_BI61S8.W_BASE X_B14158.W_CONTS USR: Sam Linde
rast [oes pene] one SORES TERT A ca TERT TNT
AMENOMENT DETALS Desian cnox SURVEYOR: KEN HICKS & ASSOCIATES
we ees 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA PALM LAKES
it wo 1 ot 203 8 os mM Ph (07) 5443 2864 Fax (07) 5443 7146 | C = SOUTHERN BIORETENTION BASIN
N 1:200 AB a
Nc Taam Ome ee LAYOUT PLAN
#p B14158.W ANATTHEW MLL PEG IST PALM LAKES - COOROY Calibre Se oni aba ——— -_
FE o Te 07 3895 3444 Face 073895 9400 oper
sf Fo 0 BHA OF ALBRE OSILING a TL RETIREMENT COMMUNITY CONSULTING See oe B14158.W-SK105 A
Page 19
1.00m
TOP OF EMBANKMENT
RL_101.00m AHD
EMERGENCY WEIR
RL_100.70m AHD.
Q500 WSL 100.91m AHD
S200 Wee in A
(2100 WSL 100.70 AHO ee ~ MAJOR OVERFLOW WEIR q
RL10050m AH __ RE 100.55m AD
See 1
| - EMERGENCY WEIR FOR EXTREME
al 100.00m AHD | -_ & STORM EVENTS (i.e. 500 YR ARI)
TEMPORARY PONDING FOR === == 1 | \ Ad |
STORMWATER QUALITY nx150 PRIVARY | SL
x
FRONT ORIFICES L | | | -~_ 2x 250 SECONDARY
RL 99.40 AHD “| \ | RL 100.0m AHD
f |
RL_99.10m_AHD Y WY | | | [-—— seconoary OUTLET PIT
SS | |
t | (900x900 SQ.)
° BIO. RETENTION ie | | <
RL 98.70m AHO S| FILTER MEDIA >| | | a
] |
| |
i
| | | i 0.5% FALL
1 4 I _ ae _ - _— >_> - 8 _- _ _
RL_98.00m AHD rn i To
— 1
SUBSOIL DRAINAGE UPSTREAM IL = 98.0m AHD 1x 6375
PRIMARY OUTLET PIT BALANCE ORIFICE TO CONTROL
(900x900 SQ.) FLOWS BETWEEN PIT STRUCTURES DOWNSTREAM IL = 97.9m AHD
BASIN OUTLET CONFIGURATION SECTION
SCALE 1:20 (A1)
SCALE 1:40 (A3)
TOP OF EMBANKMENT TOP OF EMBANKMENT
2.50m , 3.00m , 2.50m
EMERGENCY WEIR OVERFLOW WEIR EMERGENCY WEIR
RL_101.00m_AHD os00 100.91m AED RL_101.00m AHD
wT 91m i 2
SS
Cc: RL_100.70m_AHD 100 100.70m_AHD RL_100.70m_AHD ———1
eee a 2
6 RL_100.55m_ AHD 6
1_—_———— 1
6 6
WEIR ELEVATION DETAIL
SCALE 1:20 (A1) NOTES:
SCALE 1:40 (A3) 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
NOT FOR 7 RELIMINARY THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.
CONSTRUCTION NOT FOR CONSTRUCTION °
tee BIAS WEE dug DATE gras TIME: 08:49
ref’: BSB am Linde
Tat [ons [an] ONT ao THCROTTN Ne Ten DRAWS TTT
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES ry
me S| 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONGULT AUSTRALIA NORTHERN BASIN
in 120020 02 04 06 08 1 At Ph (07) 5443 2864 Fax (07) S443 7166 | —h_y OUTLET STRUCTURE DETAILS
N 1:40 AB lapPROuD nl a
Nic caw Omen PROJECT No. TRATED
tp 814158 W nmersrat git 3] PALM LAKES - COOROY calibre Sorin enRtiiy abla amy a PenrenE aT aa
NIE o Te 07 3895 3444 Facsimile 07 3895 2400
br fo OW BEHALE OF CRUBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING ee ea toon ten oe neve B14158.W-SK106 A
Page 20
, 3.00m ACCESS TRACK EXTREME STORM AND BLOCKAGE EVENT uN RL aN WSL 101.25m AHD . 30m eS OVERFLOW WEIR RL 10) jm AHD Q100 WSL _101.00m AHD ee 1.20m 2x 400 PRIMARY FRONT ORIFICE TO 2x 400 PRIMARY SIDE ORIFICES TO CONTROL CONTROL FLOWS AT (IL 99.60mAHD) RL100.35m _AHD, FLOWS i.e. ONE ORIFICE ON EACH SIDE MAJOR OVERFLOW WEIR FOR (IL 9.6m AHD) EXTREME STORM EVENTS I TEMPORARY PONDING LEVEL . | ( RL_99.60m AHD i NOL RL _99.20m AHD = NOE RE_97.20m_AHD 55mm ORIFICE TO CONTROL TEMPORARY PRIMARY OUTLET PIT PONDING FOR STORMWATER QUALITY PURPOSES (1200x1200 SQ.) SCREEN TO BE PROVIDED AT DETAIL DESIGN BASIN OUTLET CONFIGURATION SECTION SCALE 1:20 (A1) SCALE 1:40 (A3) I 15m TOP OF EMBANKMENT TOP OF EMBANKMENT OVERFLOW WEIR BASE WIDTH EXTREME STORM AND RL_101.50m_ AHD BLOCKAGE SCENARIO — a WSL 101.2m_AHD [ 100 101.00m AHD | ——T1 —— — _———_— — RL_101.30m_ AHD +__ 12 = — FS RL 100.90m AHD— — — — — — — — —— — ~~ ~~ 6 6 WEIR ELEVATION DETAIL SCALE 1:20 (A1) SCALE 1:40 (A3) NOTES: 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN AND IS SUBJECT TO DETAILED DESIGN. 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE LATEST ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03. NOT FOR CONCEPT PLAN ONLY NOT TO BE USED FOR FILE: B14158,W-SK107.dwg DATE: 12-11-2015 TIME: 07:42 CONSTRUCTION CONSTRUCTION PURPOSES Xref's: X_B14158.W_TITLE USR: Sam Linde Tat [ones [awe] ONE SORE TETEET TORO To SORT SAWN TE AMENDMENT DETAILS peo CHEK SURVEYOR: KEN HICKS & ASSOCIATES Fx i 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT C CCONGULT AUSTRALIA CENTRAL BASIN ie 12002 0 02 04 06 08 1 Al Ph (07) 5443 2864 Fax (07) 5443 7146 | er OUTLET STRUCTURE DETAILS N 1:40 AB lapPROuD nl a Ne caw Omen PROJECT No TRATED re 814158, W momo eee"! PALM LAKES - COOROY calibre Serle en si Abhay ae Poaceae Sa a NIE o Te 07 3895 3444 Facsimile 07 3895 2400 br fo OW BEHALE OF CRUBRE CONSULTING LD PTY LT RETIREMENT COMMUNITY CONSULTING ee ea toon ten oe neve B14158.W-SK107 A
Page 21
TOP OF BANK
RL_101.5m (VARIABLE)
RL 99.25m
RL 98.95m —~|
RL 98.70m
9.00m
MACROPHYTE PLANTING AREA WIDTH
VARIES (MIN. 2m WITH 1 in 8 SLOPE)
TYPICAL CENTRAL BASIN
SECTION - PART A
SCALE 1:50 (A1)
SCALE 1:100 (A3)
3.0m
Yj} ZONE WIDTH VARIES
BIORETENTION BASIN
REFER TO TYPICAL SECTION AND DETAIL
RETAINING
Q100 WSL _101.00m
TEMPORARY STORAGE
WATER QUALITY
WSL 99.60m
NOL RL _99.20m
ATT TTA
DEEP ZONE RL_97.20m
SE FONE BE EM
SECTION CONTINUES BELOW
CAR PARKING SPACE
| ACCESS TRACK TOP OF WALL
| RL_101.70m
TEMPORARY PONDING
LEVEL RL 100.40m
0100 WSL 101.00m TOP OF EMBANKMENT
l == == -- -- -- -- -- -- -- — — — OVERFLOW WEIR — ——— — — —_|— MIN. RL 100.80m -- - _- ae a a BATTER BACK TO ROAD
{IN. RL _100.80m__
wl RL_100.50m
EE r ,
<| TEMPORARY STORAGE WATER QUALITY il x ¥ Wve Y yy Bb 100.100
wo! WSL_99.60m
3) eo St
Z| NOL RL 99.2000 ET SS Se FILTER MEDIA
SL aI IIL IO IIIT IDI gn Sr —-- TOO
S| 2 |
s
S| “
= a, BASIN OUTLET PIPE
HI i
I LZZ-§ 5
[/DEEP_ZONE_RL_97.20m S
f
TYPICAL CENTRAL BASIN
SECTION - PART B NOTES:
SCALE 1:50 (A1) ——
SCALE 1100 (A3) 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY
IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND
PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN
AND IS SUBJECT TO DETAILED DESIGN.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
THE LATEST ISSUE OF CALIBRE CONSULTING REPORT
No. B14158.W-03.
NOT FOR CONCEPT PLAN ONLY
NOT TO BE USED FOR
FILE, B14158.W-SK108.dug DATE: 12-11-2015 TIME: 07.47 CONSTRUCTION CONSTRUCTION PURPOSES
Xref's: X_B1158.W_TITLE USR: Sam Linde
mar Tones rave] One SORE METRES T TICROPTINT Ne SENT DRAWN TLE
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES
rr 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONBULT AUSTRALIA PALM LAKES
ie 150 105 0 1 zm Ph (07) 5443 2844 Fax (07) 5443 7146 OE CENTRAL BIORETENTION
N 1:100 AB a
pic DRAWN CHECK] PROJECT Ho APPROVED BASIN AND POND SECTION
i praise W aera] PALM LAKES - COOROY Calibre SEE Se SECTION
NIE . Te 07 3895 2444 Focumile 07 3895 9400
Mi Fo 1 BAF OF CALE CONSLTNG CO TY TD RETIREMENT COMMUNITY CONSULTING Ines torn sen ew tao tert BERL B14158.W-SK108 A
Page 22
TOP OF EMBANKMENT MIN. RL 103.00m AHD FILE: B148.W-SK109.dug_DATE: 12-11-2015 TIME: 08:49 Ixref's: X_Bth158.W_TITLE USR: Sam Linde “20 YEAR ART 77 BELOW MAJOR OVERFLOW WEIR LEVEL qeebOW MAJOR OVERF MAJOR FLOW OVER BASIN WEIR VER BASIN WEIR. 1 YEAR ARI WSL 102.30m_AHD RL_102.00m_ AHD TEMPORARY PONDING LEVEL PRIMARY OUTLET PIT SIZED FOR 1 YEAR ARI STORM | | » RL_102.30m_ AHD 102.30 AHD EW RL_101.70m_ AHD\) 1 xr 1.00m TOP OF EMBANKMENT RL_103.00m_ AHD MAJOR OVERFLOW WEIR RL_102.70m_AHD “___ MAJOR RUNOFF (ie. Qso AND Quo) BIO RETENTION FILTER AND DRAINAGE LAYERS 400mm, —----4----~ PRIMARY 900 OUTLET PIPE TO CONVEY 1 YEAR ARI DESIGN FLOWS TO CENTRAL BASIN TOP OF EMBANKMENT RL_103.00m AHD [ DIRECTED INTO PRIMARY PIT INFILTRATED FLOWS SECONDARY OUTLET PIT SIZED TO CONVEY STORM EVENTS ABOVE 1 YEAR ARI SOUTH BIORETENTION BASIN SECTION SCALE 1:20 (A1) SCALE 1:40 (A3) 6.00m MAJOR OVERFLOW WEIR MAJOR FLOW OVER BASIN WEIR PeER BASIN WEIR ~"RL_102.70m_AHD ———— WEIR ELEVATION DETAIL SCALE 1:20 (A1) SCALE 1:40 (A3) SECONDARY 900 OUTLET PIPE TO CONVEY PEAK FLOWS ABOVE 1 YEAR ARI STORM EVENT TOWARDS PROPOSED SWALE (WITHIN EASEMENT) TOP OF EMBANKMENT RL_103.00m_ AHD [ oo NOTES: 1. LAYOUT OF THE PRELIMINARY STORMWATER QUALITY IMPROVEMENT DEVICES IS CONCEPTUAL ONLY AND PROVIDED AS A GUIDE FOR THE TREATMENT TRAIN AND IS SUBJECT TO DETAILED DESIGN. 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE LATEST ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03. CONCEPT PLAN ONLY NOT TO BE USED FOR CONSTRUCTION PURPOSES NOT FOR CONSTRUCTION FRET [CALCS [DRAWN] _OATE vesue On [ow | 05.1005 AMENDMENT DETAILS. pesian cneox "SCALE (METRES 7 B_[ aw [05.02.16 | PPE SIZES AMENDED => 120 0.2 0 0.2 04 06 08 1 160 DRAWN CHECK| [leo @]> OszmEozm! M AB MIGROFIUM No, PROJECT No. B14158.W SURVEYOR: KEN HICKS & ASSOCIATES 49 THE ESPLANADE MAROOCHYDORE Ph (07) 5443 2844 Fax (07) 5443 7146 APPROVED ANDREW McPHAIL RPEQ 6921 MATTHEW HILL RPEQ 11578 FOR & ON BEHALF QF CALIBRE CONSULTING (QLD) PTY LTO “CLIENT PALM LAKES RESORT PROECT PALM LAKES - COOROY RETIREMENT COMMUNITY calibre ‘DRAWING TITLE SOUTHERN BASIN OUTLET STRUCTURE DETAILS (CONSULT AUSTRALIA CalbreConsutng (QLD) Py Lid ng ened Gard For, 3% thre, CHD At 4000 DRAWING NOMEER BaUE ieee hank ies B14158.W-SK109 A Recere Cuber Katou fay Sapo Ben Coat 1c 4004
Page 23
SPA
[OCR of page images]
PROPOSED 6m WID!
DRAINAGE EASEMENT
PLUNGE POOL /
ENERGY
DISSIPATER
EXISTING SWALE
NORTHERN BASIN
|/— PROPOSED SWIMMING POOL
REFER TO ARCHITECTURAL FOR
TOWARDS SWALE
LANDSCAPING AND FENCING
5m WIDE
STORMWATER
EASEMENT
FLOW DIVERSION
D900
PEAK FLOWS ABOVE THE 1 YEAR
ARI STORM TO BE DIRECTED
I
SPLITTER MANHOLE TO DIRECT 1 YEAR ARI
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
THE PROPOSED SWALE & DRAINAGE EASEMENT TOWARDS SOUTHERN
LEGEND:
EASEMENT
ye
3m WIDE DRAINAGE
PROPOSED STORMWATER DRAINAGE
DESIGNED TO CONVEY MINOR FLOWS
SITE BOUNDARY
PROPOSED STORMWATER DRAINAGE
PROPOSED STORMWATER EASEMENT
RETAINING WALLS
FLOW DIRECTION
1 YEAR ARI PEAK FLOW DIVERSION
DISCHARGE LOCATION
SWALE
mi
BASIN
| aa \ 1) |_ ba
FILE: B14158.W-SKNI0.dwg_ DATE: 12-11-2015 TIME: 08:49
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
CONSTRUCTION PURPOSES
xref’s: X_B1s158.W_BASE X_B14158.W_MODFIED ARCH X_B1G1S8.W_TITLE ADAM DTM Layer Copy USR: Sam Linde B14158.W-03.
Taar [ons awn] ONT SORE TETAS T TACROPEN Wo SENT DRAWN TLE
AMENDMENT DETAILS: DESIGN CHECK| SURVEYOR: KEN HICKS & ASSOCIATES arn
pref ba eee [specs Une an tana woo 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CCONBULT AUSTRALIA CONCEPT STORMWATER
i 150 5 ‘0 2 at Ph (07) 5u43 2864 Fax (07) S443 7146 | SD DRAINAGE PLAN
‘ 11000 ry SR 7 rn
Nc chawn cnrex PROJECT No. APPROVED SHEET 1 OF 2
: 2 B14158.W AMIRTHEW HL PED TT PALM LAKES - COOROY Calibre Ger er Mag Dud a —
. i oat
SIF FOR & ON BEHALF OF CALIGE CONSULTING (QLD) PTY LTO RETIREMENT COMMUNITY CONSULTING Daten fata town fry nen tant Tb GBt B14158.W-SK110 A
Page 24
POO
L
SPA
[OCR of page images]
\ SN
~~ EXCESS PIPE FLOWS
\ \
Lo \
/ SPLIT FLOW PIT
“Oo
7d
a
LY
fe
Y 2 1 YEAR ARI
\x OVERFLOWS 7" ~
f
4
snceole SWIMMING POOL
REFER TO ARCHITECTURAL FOR
~~ LANDSCAPING AND FENCING
—
\
\ _
LNG FLOWS ABOVE THE 1 YEAR ARI
\ STORM TO BE DIRECTED TOWARDS SWALE
PAV
900 STORMWATER 1 YEAR ARI
PEAK FLOW DIVERSION PIPE
ab ——F BASIN
IM U7 SL 101.7
Le,
2
t
I
1) Pe,
3m WIDE DRAINAGE
EASEMENT
LEGEND:
SITE BOUNDARY
PROPOSED STORMWATER DRAINAGE N
\
PROPOSED STORMWATER EASEMENT
RETAINING WALLS
MAJOR FLOW DIRECTION
1 YEAR ARI PEAK FLOW DIVERSION
DISCHARGE LOCATION
SWALE
SPLITTER MANHOLE TO DIRECT 1 YEAR ARI
PEAK FLOWS TO BASIN AND MAJOR FLOWS TO
THE PROPOSED SWALE & DRAINAGE EASEMENT
f
| STORMWATER
q EASEMENT
FILE; BU41S8.W-SKIIO.dug DATE: 12-11-2015 TIME: 08:49
PXref’s: X_B1s158.W_BASE X_B1158.W_MODIFED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde
pe
NOTES:
I
I
I
I
I
5m WIDE
STORMWATER
EASEMENT
i
1.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
B14158.W-03.
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
we cM ™e 19 TA ESPLANADE MAROOCHYDORE. PALM LAKES RESORT C cofuw un & CONCEPT STORMWATER
ie soo 1 0 20 Al Ph (07) 5443 2844 Fax (07) 5443 7146 | __ i DRAINAGE PLAN
nN 11000 AB PROJECT No. APPROVED. fl
be ora coon 4158 W mucin ent! BALM LAKES - COOROY calibre econ ay etree SHEET 2 OF 2 =
it [rows aur oF cues coun a ory RETIREMENT COMMUNITY CONSULTING erecta eee nome B14158.W-SK111
Page 25
SPA
[OCR of page images]
SUB- IMPERVIOUS ] PERVIOUS
catcument_| AREA (e) | percentace | percenTace | LEGEND.
E1 (ROOF) 0.558 100 0 SITE BOUNDARY
£1 (ROAD) 0.243 60 40
Et (GROUND) 0.189 20 80 =o MUSIC CATCHMENT BOUNDARY
FA (ROOF) 1.227 100 0
F1 (ROAD) 0.610 60 40
F1 (GROUND) 0.480 20 so | ©. DESIGN CONTOURS
G1 (ROOF) 1.081 100 0
G1(ROAD) 0.388 B 2% EXISTING CONTOURS
G1 (GROUND) 0.556 80 20
£2 (ROOF) 0.491 100 0 IMPERVIOUS AREA 4 Y
£2 (ROAD) 0.237 60 40 L.
£2 (GROUND) 0.217 20 80 ROOF AREA 7
E1 (PARK) 0.038
£3 (ROOF) 0.006
£3 (GROUND) 0.304
£4 (ROOF) 0.032
£4 (GROUND) 0.171
FI (PARK) 0.253
F2_ (ROOF) 1.048
F2 (ROAD) 0.571
F2_ (GROUND) 0.406
F2 (PARK) 0.007
F4 (ROOF) 0.295
F4 (GROUND) 0.126
H_ (GROUND) 0.589
G2 (ROOF) 1.450
G2 (ROAD) 0.711
G2_ (GROUND) 0.826
F3 (PARK) 0.664
F5 (ROOF) 0.371
F5 (ROAD) 0.146
F5_ (GROUND) 0.393
F5 (CAR PARK) 0.240
EXT F GROUND 1.167
EXT F ROAD 0.372
EXT G GROUND 0.942
EXT G ROAD 0.342
TOTAL 18.347
FILE: B14158.W-SKN10.dug__DATE: 12-11-2015 TIME: 08:49
Pxref's: X_Btht58.W_BASE X_B14158.W MODIFIED ARCH X_B14158.W_TITLE ADAM DTM Layer Copy USR: Sam Linde
SOUTHERN |/,
BASIN |i
Fog bales do lal
ia aaa a
SOS
sUnetastaelata pla
dhehehe dale!
Ti ap |
zy
Se
Se
te RT,
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST
ISSUE OF CALIBRE CONSULTING REPORT No. B14158.W-03.
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
CONCEPT PLAN ONLY
FIRST [CALCS [DRAWN] _OATE
vwsue Tce [Iw | 05.02.16
AMENDMENT DETAILS.
=>
oszmEozm!
=m Sol @] >
DESIGN CHECK
1000 10
0
SCALE (METRES 7 MIGROFIM No “CLIENT
SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
7020304050 AT Ph (07) 5443 2844 Fax (07) 5443 7146
PALM LAKES RESORT
PROECT
DRAWN CHECK|
2000
AB PROJECT No. "APPROVED.
B14158,.W SNIATIE HEL RPE Te PALM LAKES - COOROY
RETIREMENT COMMUNITY
FOR & ON BEHALF OF CALISRE CONSULTING (QLD) PTY LTO
C cn Parsun IMPERVIOUS AREA
4 PLAN
Calibre Se eee =
CONSULTING (ales noms saves tony gua eevee 325M B14158,W-SK112
Page 26
PROPOSED 6m WIDE
DRAINAGE EASEMENT
2.48m
CARPARK a
EXTENDED
DETENTION
DEPTH
CARPARK
RL 98.82
ENERGY DISSIPATER SUBJECT
TO DETAILED DESIGN
BIOPOD FS
FILTER AREA: 16m?
TOTAL BASIN SURFACE AREA: 100m?
EXTENDED DETENTION DEPTH: 0.2m
FILTER DEPTH: 0.4m
SURFACE
LEGEND:
SITE BOUNDARY
SWALE
BIOPOD FILTER
PROPOSED STORMWATER DRAINAGE
PROPOSED STORMWATER EASEMENT
1 <1 3 >:
3
i 3
§
=
So Ee
&
m
TYPICAL BIOPOD DETAIL
SCALE 1:25 (A1) NOTES:
SCALE 1:50 (A3) —
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH CONCEPT PLAN ONLY
LATEST ISSUE OF CALIBRE CONSULTING REPORT No.
BIGISB.W_03. CONSTRUCTION PURPOSES
nar [ones [raw] ATE SORE METRES T TACROPEN Wo SENT DRAWN TLE
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: KEN HICKS & ASSOCIATES sy
meio [Ss fos 10 1050 1 2M 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT (CONSULT AUSTRALIA CONCEPT STORMWATER
ie oe 43 Ph (07) 5443 2844 Fax (07) 5443 7146 — i DRAINAGE PLAN
c PROECT -
pic DRAWN CHECK] PROJECT No. APPROVED ANDREW McPHAIL RPEQ 6921 Call Consuting (QLD} Pty Lid
ae tata ————— . B14158.W HATTA ALL ea 5 PALM LAKES - COOROY Call re Ger er Mag Dud paid Lame TSU
. i oat
sir FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD RETIREMENT COMMUNITY CONSULTING Dace Cetrt bow tytn Capon bueno ‘TSE B14158.W-SK113