RFI Eng response notice items 4-19 MCU150111
Attached to the e-mail MCU15/0111 Response to information request - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy - email 1 of 2.
Attachment 1
15‐003352 ‐ Palm Lake, Cooroy
Existing 100yr ARI conditions (RAFTS Model) and influence of existing farm dams on catchment hydrology
Site flows and Farm Dam fill times
6
5
4
100yr ARI Flows (cumecs)
3
2
1
0
0 0.5 1 1.5 2 2.5 3
Time (hrs)
A2 B4 B3 C2 OUT N Basin Centre Basin Centre South Basin South Basin TOTAL
Centre South
Dam N Basin Centre Basin South Basin TOTAL
Basin
Weir level (mAHD) 99.75 98.75 99.75 102.75 -
Bund level (mAHD) 100.25 99 100 103 -
Dam Area (m2) 888 1246 415 1066 3615
Estimated Dam Volume (ML)
1.345 2.001 0.544 1.625 5.515
(Assumes 2m depth; 1:2 batters)
Model Output Location Node A2 Node B4 Node B3 Node C2 OUT
Dam fill time (hrs): 0.30 0.23 0.18 0.27 0.28
Total Flow Volume (ML): 180 1127 536 487 1437
Est. Dam Volume as % of
0.7% 0.2% 0.1% 0.3% 0.4%
Design Storm Flow Volume
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.