Referral Agency Response - Planning RAP25 0022 (As Published) · RAP25/0022
d. no additional buildings or structures, other than those shown on the approved
plans, are to be located within 4.5 metres of the revetment wall;
e. any new side boundary fencing within 4.5 metres of the revetment wall must taper
down to a maximum height of 1.2 metres at the revetment wall, and must have a
height not exceeding 1.5 metres at a distance of 2.25 metres from the revetment
wall;
f. A maximum of 25% of the area is allowed to be under hard pavement, and the
balance is to be grass (not synthetic grass), ground covers or shrubs, provided no
shrubs are planted within the first 1 metre of the revetment wall;
g. All landscaping must be undertaken in accordance with Planning Scheme Policy
PSP2 – Landscaping.
4. All landscape works must be established and maintained for the life of the development,
and in a manner that ensures healthy, sustained and vigorous plant growth. All plant
material must be allowed to grow to full form and be refurbished when its life expectancy
is reached.
5. Where excavations result in a cut face greater than 0.5m, suitable landscaping is to be
installed to soften the visual impacts of the excavations to the Noosa Waters’ Canal for
the full length of the cut face. Landscaping is to be of a suitable species and in
accordance with Noosa Plan 2020 Planning Scheme Policy PSP2 Landscaping.
6. No shore side anchor points are permitted within 4.5m of the revetment wall.
Bonds
7. A site compliance bond of $5,000 is to be submitted to Council prior to the
commencement of works. The commencement of works can only commence once
Council's Construction Engineering Officer has confirmation that the bond monies have
been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance
with these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
8. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for
performance and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval
requirements have been met.
Earthworks
9. All earthworks and associated retaining structures/batters must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
10. Earthworks carried out on site must not affect the structural integrity of the revetment
wall, existing fences or other structures that border the subject site. Fences that are
affected must be replaced in a timely manner and in consultation and agreement of the
owners of the related properties.
Page 3 of 5
Document Set ID: 23750227
Version: 3, Version Date: 21/05/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP25 0022 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 114 KB (small file)
- File type
No other editions are linked here.