Building Height
'JO. The finished h9ight of the building, including any rooftop plant or structures, shall not exceed
15 rnsetr,as above natural and finished gro•jnd levels.
11. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificatt-:i lodged with Council at completion of work co11firming compliance with the
maximum allowable building height as required by either the conditions of approval or the
P!ann1r1g Scheme.
Operating lfotirij & Deliveries
The restaurants and bar are to operate between the hours o"f 6am and 12pm only.
13. Business deliveries are to be undertaken between the hours of 6am to 7pm Monday to
Satu;day and 8am to 5pm Sunday only.
14. Ss:irnice vehicles shall not attend the site outside the hours of 8am to 5pm.
Vegetation
15. Existing trees on the site and within road reserves are to be retained except where required
to be removed due to building operations, requirements of the approved Settler's Cove
Management Plans or the cor~duct of the approved use.
16. The Koa1a and Glossy Black Cockatoo habitat trees identified for retention on plan L--SD-
·1.01 (Rev. A) dated August 2009 by DBI Design Pty Ltd sha!i be retained.
17. The existing Koala and Glossy Black Cockatoo habitat trees and any other trees •,vlthin
setback and open space areas to be retained must be protected. As b,Jllding works are
iil<ely to impact the trees' mot zones, a qualified Arborist (having a minimt.im Diploma of
Arboriculture or ISA certification and a minimum of three years' field experience) must be
contracted to prepare a lree Management and Protection plan and shall:
a, oversee installation of a hard temporary protection zone prior to commencement of
works with 'no go' signage in accordance with AS 4970-2009. AH site workars must be
inducted in relation to the tree protection:
b. supervise any works within the temporary protection zonia;
c. undertake hazard reduction and formative pruning as necessary; &
d. provide certification that the trees were protected in accordance with the Arborlst's
recommendations.
The Tree Management and Protection Plan Shall be presented prior to or at the pre-start
meeting for the site.
The Arborist shall monitor the heaith and structural integrity of the trees to be retained at
least monthly during the construction period and quarterly for 12 months after construction is
completed. The developer shall rectify any decline in the health or structural integrity of the
trees, !11 accordance with the Arborist's recommendations.
18, Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
a. Re-use for building rnaterials.
b. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, fess than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
c. Disposal for firewood.
d. Disposal for landscaping purposes.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.