be located so that they are convenient and safe to use (refer to Noosa C 1)1~ncll VVaste
Management Gode).
The Plan shall contain the following information:
a. The site area for the storage and separatien of waste is to be shown on the pian
drawings accompanying the application.
b. A waste management table as indicated below is to tie compieted showing how waste
rnaterlal is to be segregated • recycled - reused or disposed.
MATERIALS ON-SITE DEST!Ni\T!ON I
_, Re-use and F{ecyciing Disposal i
Expected waste
materials
Estimated
vo!un'IG
On-slte
"specify p.cposed
IOfi:-slte
"specify contractor
~specify contractor
and landfill site or
(m") re-use or on~-slte !and recycling outlet other disposal site
recvdim:i methods I
·-
I Excavation materiai l
! Green waste j
J
Bricks I i
Concrete
Timber-please
specify
Plasterboard l
Metals - please
''
I
apacifv I I I
Asbestos i
Other - please
specifv
'
I I Il
Note * If a demoHtlon C'AJrrcractor is undertaking works, then the Waste Management table is to
be com latad b the demolition contractor.
The purpose of the Waste Management Plan Is to facilitate the segregation of waste for the
effecttve reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landflll some items are free.
H' her ate fees are char ed for loads of mixed waste.
Trad9 Waste
101. The drainage system from all business that are likely to discharge trade waste must comply
with Council's Trade Waste Policy and S,.mshine Water's guide!lnes for accepting trade
waste into the sewer. AH appropriate trade waste permit and/or agreements must be applied
for and issued prior to the discharge of any trade waste to the seweL
102. Noise emission from mechanical equipment shall comply with the following requirements:
Air-conditioning and Refrigeration
a. 7am to 10pm: Maximum background+ 5dB(A)
b. 1Oprn to 7am: Maximum background + 3d8(A)
Pumps
c. 7am to 7pm: Maximum background+ 5dB(A)
d. 7pm to 10pm: Maximum background+ 3dB(A)
e. 1Opm to 7am: No audible noise.
103. Written certification from a suitably qualified person shall be submitted confirming that the
noise levels from all mechanical equipment comply when measured at either the residential
boundary or outside the most exposed part of an affected building, whichever is the closest
to the equipment.
Page 12of13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.