Original source · versioned page text
RFI - Ecological Assessment Report
The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 145, section 1. The text section number identifies this passage in the reader.
e Incidental planting of feed trees in the Residential High Density and Residential Single Dwelling lots; e Restriction of domestic pets during construction (condition RHD 55 & RSD 56); e Pet cats or dogs are to be kept in purpose-built cat or dog runs (large caged or fenced areas) following construction (operational stage) (condition RHD 55 & RSD 56); e Dogs need to be kept on a lead at all times when being exercised; e Avoid clearing/construction activities in areas where birds are feeding; and e Nest boxes suitable for glossy black-cockatoos will be installed within the private open space for conservation and waterways protection areas (Section 3.5) (condition RHD 38 & RSD 39). 3.3.3 Wallum Froglet e Retention of suitable habitat areas (condition RHD 39 & RSD 40); e Enhance suitable habitat (eg. implement weed control) (condition RHD 39 & RSD 40); e Stormwater management objective to maintain the hydrological regime in low-lying areas and ensure no significant reduction in water quality (condition RHD 39 & RSD 40); e Retain or aim to attain low nutrient (ie. total nitrogen 0.34 mg/L and total phosphorous 0.035 mg/L) and low pH (ie. 4-5) status (condition RHD 39 & RSD 40); e Ensure sediment fencing, where necessary, is in place before clearing and other earthworks commence; e Restriction of access to important habitat areas to limit the introduction of soil pathogens, toxins or other materials; e Limited use of herbicides, pesticides and fertilisers in rehabilitation/restoration works; e No standing water to remain on site to minimise habitat for cane toads; e Management of untreated stormwater originating offsite; and e Management (construction of a storm water management facility), by Council, of the disturbed “wetland” adjacent to Banksia Avenue. 3.4 PROTECTION OF FAUNA DURING SITE CLEARING & TREE REMOVAL 3.4.1 Identification of Habitat Trees Prior to the commencement of any clearing, a wildlife ecologist?/plant ecologist* will identify habitat trees that occur within the area to be cleared (development areas referred to as building envelopes in Figure 5). Habitat trees are considered to be trees that provide or potentially provide a number of resources and may include: * Wildlife Ecologist qualifications & experience: i) tertiary qualifications in wildlife ecology or equivalent; and ii) at least 5 years relevant experience or experience considered acceptable to Council; and iii) holding an appropriate DP! animal ethics permit; and iv) holding the appropriate EPA rehabilitation permit. * Plant Ecologist qualifications & experience: i) tertiary qualifications in plant ecology or equivalent; and ii) at least 5 years relevant experience or experience considered acceptable to Council. FAUNA MANAGEMENT PLANSETTLER’S COVE DEVELOPMENT PTY LTD MAY 2005 R79130 (70934) C&B GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.