Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 151, section 1. The text section number identifies this passage in the reader.

15

 

4.2 CONSTRUCTION STAGE

A number of fauna management measures are to be implemented (and monitored) during
the construction stage of the development under various other management plans.
Measures identified in this Fauna Management Plan and not specified in other plans are
addressed in the site Environmental Management Plan. Specific measures relating to fauna
will be completed or supervised, where appropriate, by the wildlife ecologist. Where
necessary, measures from these other plans will also be incorporated into the site
Environmental Management Plan.

Ecological Restoration Plan and Specifications

e Chipping/mulching of felled trees and vegetation;
e Continue planting and restoration works; and

e Continue weed control.

Stormwater Management Plan/Sediment & Erosion Control Plan
¢ Ongoing water quality monitoring;
e Monitoring and maintenance of water quality control devices.

Landscape Master Plan

e Erection of approved fauna friendly fences (with exit facilities) within the development
areas (referred to as building envelopes in Figure 5);

e Limit the use of fertilisers, pesticides, herbicides, etc.;

e Responsible use of water for irrigation (eg. drip irrigation); and

e Source suitable species for local fauna for landscaping.

Environmental Management Plan (fauna component)

e Ensure (induction) that construction personnel are aware of fauna and general site
environmental values;

e Ensure (induction) that construction personnel are aware of the “no go” or exclusion
areas during construction;

e Ensure construction personnel are aware of the presence of koalas on the site and the
prohibition of dogs and cats during construction;

e Qualified arborist® to cut and treat tree roots and branches where there is potential for
interference with machinery;

e Qualified fauna spotter/catcher to be on site during removal or pruning of habitat trees;

e Removal of habitat trees in accordance with vegetation clearing and retention strategy
(Section 3.4.2 and Landscape Management Plan);

® Arborist qualifications & experience:

i) tertiary or other qualifications in arboriculture, forestry, horticulture, plant ecology or equivalent, with appropriate specialist training; and ii) at
least 5 years relevant experience or experience considered acceptable to Council; and iii) be registered or eligible for registration as a
“consulting arborist” by the National Arborists Association of Australia.

FAUNA MANAGEMENT PLANSETTLER’S COVE DEVELOPMENT PTY LTD
MAY 2005
R79130 (70934)

C&B GROUP
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.