Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 175, section 1. The text section number identifies this passage in the reader.
ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT 1-2
other requirements arising from legislation and other approvals
- How the performance targets are to be achieved
- When the performance targets will be satisfied
- How the performance will be monitored
- Corrective actions and contingency measures to be undertaken
- Reporting Arrangements (including monthly reports to Council
during construction)
- Auditing Arrangements
- How the requirements are to be incorporated into the
construction and works contracts.
- How the developers, employees, contractors and contractors
employees will be informed and trained with respect to the
environmental protection requirements
- Enforcement; and
- Penalties for non compliance
75 The EMP shall apply to all works and activities on all areas of the site and
adjacent road reserves (eg. All development, jetty construction1 and
operation,etc.)
76 In particular, but without limitation, the EMP shall address the following issues in
relation to the construction and operational phases of the development:
● Legislative compliance
● Vegetation protection
● Fauna and Fauna Habitat Protection
● Aquatic ecosystem protection
● Weed control
● Pest control (particularly mosquitoes)
● Soil erosion and sediment control
● Water Quality Protection
● Storage and Handling of Hazardous Substances
● Waste Management
● Bushfire Control
77 The EMP shall incorporate the requirement for monthly compliance monitoring
and annual audit reports to be submitted to Council for the construction stages
of the development. The format and content of these reports shall be in hard
copy and digital form, generally in accordance with the following:
77.1 Include tables of the monitoring results (digital form should be in
Excel).
77.2 Include individual charts plotting the results for all parameters
required in the monitoring.
77.3 Include a brief written discussion of the results and recommend any
necessary actions.
78 The Applicant and all future owners of the site shall comply with the EMP.
1
Jetty is now to be a separate application and EMP
S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.