ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT 3-1
3 EMP PRELIMINARIES AND ESTABLISHMENT PHASE
Prior to the commencement of ecological restoration activities, the ERP Contractor will need to
undertake a number of actions to ensure compliance with the environmental management objectives
for the site occurs at the start of the ERP works. It is also recommended that the ERP Contractor is
familiar with the environmental management responsibilities of the Principal Contractor for the RHD
and RSL development areas so that control measures can be integrated as closely as possible.
Element 1 Pre-site Establishment Planning
Policy: To ensure pre-site planning takes account of the need to protect and enhance
ecosystems and existing residential amenity of nearby areas.
Strategy: To undertake planning of the location of environmental controls, ensure
management measures proposed are in compliance with the EMP and associated
storage and disposal areas are located to ensure minimal impact during the ERP
implementation phase.
Responsibility: ERP Contractor, Restoration Ecologist
Management Actions: Upon award of the Ecological Restoration contract, the ERP Contractor will
ensure that
1. Final approved plans are available that indicate:
• The agreed limits to clearing and ERP boundaries are clear (also refer Construction Element
C.2 in EMP 1)
• Sediment and erosion control measures associated with the establishment of the site
operations area and associated access paths in accordance with directions provided by the
Design Engineer/ Superintendent for the RHD and RSL development areas;
• The appropriate location of :
construction toilets (no closer than 20m from residences). It is desirable that the toilets
used for the RHD or RSL construction are also used for the ERP program.
hazardous or toxic chemical (including weedicide) storage areas (no closer than 20m
from protected bushland);
ERP launch area including the site compound and office – this is to be located within
the boundaries of the building envelope in either the RHD or RSL areas, no closer than
50m to existing residential areas and in a location approved by the Project Manager in
liaison with Council. Fencing of this area is to be undertaken in accordance with the
requirements of the Restoration Ecologist. Should a temporary nursery be required for
the storage of delivered plants, the location of this should be agreed to in liaison with the
Restoration Ecologist,
mulch and soil stockpiles (if required)
waste disposal areas (including skip locations)
S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.