Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 218, section 1. The text section number identifies this passage in the reader.
INTRODUCTION 1-6
A Conservation Management Plan (CMP) will be jointly prepared by Council and Settlers Cove
Development Pty Ltd for the RF Thompson Environmental Park in accordance with the Deed.
Similarly, it is expected that Council will establish management strategies for the Public Esplanade
and public Park lands (including the construction of a stormwater treatment wetland).
Figure 1-2 indicates the management boundaries for the various components of the total property area
for the operational phase of the project area. As indicated in this figure, the Operational section of
this EMP (Chapter 5) addresses the area indicated as being managed by the bodies corporate within
the RHD lots.
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.