INTRODUCTION 1-10
It is proposed that this EMP will be attached to all tender documents provided to contractors and
compliance with the EMP will be a condition of contract.
The Principal Contractor will be required to appoint a Site Environmental Officer (SEO), with
qualifications in environmental management and with relevant experience, to manage environmental
issues during the construction phase. The SEO is to be delegated sufficient authority to ensure full
compliance with the EMP. Key personnel proposed as part of the implementation of the EMP are set
out in Table 1-2.
Table 1-2 Project Positions and Responsibilities
Project Position Appointed By Responsibilities
Phase
Project Manager Settlers Cove Oversee design and
Development Pty Ltd reporting phase prior to
construction
Pre- commencing to ensure
Construction/Design EMP provisions are
addressed (particularly
in specific design
components).
Superintendent Settlers Cove Oversee construction
Development Pty Ltd phase. Ensures
(or delegate) Principal Contractor
complies with
environmental
requirements of EMP.
Principal Contractor Settlers Cove Responsibility for on-
Construction
Development Pty Ltd site implementation of
(or delegate) the EMP.
Site Environmental Principal Contractor Ensures Principal
Officer Contractor and other
contractors comply with
environment and safety
requirements of EMP.
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.