RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 241, section 1. The text section number identifies this passage in the reader.
EMP – CONSTRUCTION PHASE 4-7
Strategy: To identify and protect vegetation that is to be retained and manage clearing of
other areas in an environmentally sensitive manner.
36. All disturbed earthworks areas are to be temporarily stabilised by mulching with material
produced from native vegetation cleared from the site (refer Landscape Master Plan). Any
exposed areas are to be stabilized within two weeks of clearing.
37. Mulch stockpiles are not to exceed 2 m high, be located no closer than 10m from habitat
protection areas.
38. The speed of machinery used for clearing is not to exceed 30kph on site.
39. The site is revegetated as soon as practicable after clearing. All revegetation within the RHD
construction area shall be carried out in accordance with Landscape Master Plan;
40. No clearing of vegetation, ground disturbance and associated earthworks activities covering areas
in excess of 600m2 are to be undertaken without an approved erosion and sediment control plan
being available for such works.
41. To avoid contamination of potential mulch material for revegetation and landscaping, the
Contractor shall separate native and non-native/weed species into different stockpiles as far as is
practicable. Non-native vegetation (including seed pods and other propagative material) shall not
be mulched for re-use on site, to minimise the risk of propagation and consequent contamination
of landscaping/revegetation material. The only exception to this is the woody material from
umbrella trees.
42. If archaeological material is identified during clearing activities, work must cease in the vicinity
of the material to allow its significance to be established and an appropriate course of action
undertaken as outlined in the EMP’s.
Staging of Clearing
Vegetation clearing shall generally correspond with proposed staging of the Settlers Cove
development. The stages are:
Stage 1 – Residential Single Lots 1 -13
Stage 2 – Residential Single Lots 14 – 33
Stage 3 – High Density Residential Lots 3 – 9 Lot 5 shall not be cleared until at least 25
Eucalyptus tereticornis trees have been planted, are well established (refer Ecological
Restoration Plan for criteria) and attained 3m in height in the Private Open Space for
Conservation & Waterways Protection area of Lot 5.
Stage 4 – High Density Residential Lots 10 & 11.
Post Clearing Activities
At the completion of development (civil) works, cleared areas shall be restored/landscaped as follows:
• RHD building envelope in to be protected by mulch with further works to be in accordance with
approved Landscape Master Plan and landscape operational works plans;
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.