Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 75, section 1. The text section number identifies this passage in the reader.
2008/176
End-of-Trip Facilities
25. End of trip facilities shall be provided for staff and shall include:
a. a minimum of eight (15) lockers; and
b. a minimum of three male and three female shower cubicles with ancillary change
rooms.
Aternative Transport
26. A shuttle bus with a minimum of 22 seats shall be provided and operated in conjunction with
the resort to ferry guests to local destinations to minimise traffic impacts on the local area.
Details of the proposed operation shall be submitted for Council approval prior to the issue of
a Development Permit for Operational Works.
27. A minimum of 10 motor scooters shall be made available for use by resort guests, the
provision of which may be via a service agreement with a hire company
Energy & Water Efficiency
28. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
29. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may apply, with toilets to comply with the AAAA Water
Conservation Rating System. All new tap ware and shower roses shall not exceed a
maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement.
Community Management Statement Requirements
30. The Developer and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with the
EMP shall be referenced in any community management statement over the site.
31. The Fire Management Plan is to be implemented by the Developer and future owners of the
site and is to be referenced in any community management statement.
Development Permits
32. The Developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Compliance Bond
33. Security in the form of a cash bond or trading bank guarantee for the sum of $100,000 must
be submitted to secure performance of all conditions of this approval prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
34. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
35. The Development Permit for a material change of use lapses if the use has not commenced
by 8 April 2014, unless an application to extend the currency in accordance with the
provisions of the Sustainable Planning Act 2009 is approved by Council.
Page 5 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.