RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 81, section 1. The text section number identifies this passage in the reader.
2008/176
Contributions Towards Council Infrastructure
88. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
a. Planning Scheme Policy 12 – Public Open Space Contributions;
b. Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
c. Planning Scheme Policy 16 – Sewerage Headworks Contributions;
d. Planning Scheme Policy 17 – Water Supply Headworks Contributions;
e. Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
f. Council Policy – Rural Roadworks Contributions; &
g. Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
General
89. Any Building Format Plans (or similar) submitted for Council approval must be accompanied
by the relevant Community Management Statement (or similar) demonstrating compliance
with the conditions of this approval.
90. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
91. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. The design shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
92. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
93. A construction management plan/strategy to ensure no damage occurs to Council services
shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
Council in conjunction with any application for Operational Works.
94. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
95. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
96. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Page 11 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.