Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 92, section 1. The text section number identifies this passage in the reader.
2008/176 Schedule A - Glossary Clearing, for vegetabon * means remove, cut down, nngbark, push over, porson or destroy in any way including by burning, flooding or draining, but * does not include destroying standing vegetation by stock, or lopping a tree Clearing as a result of the MCU includes * clearing of assessable vegetation that will result from the change in use, consisting of any of the following — leaning for infrastructure—including buildings, stormwater management systems, water supply and sewerage systems—that are proposed as part of the MCU application — cleaning for roads, vehicle parking, vehicle and pedestnan access, utilities comidors, services, fences, firebreaks and fire management lines that are proposed as part of the MCU application ~ Cleanng that may not be necessary for developing infrastructure but is associated with the use applied for. And * cleanng of assessable vegetation that will become exempt if the development application ts approved This includes any of the following examples — cleaning for routine management and essential management purposes associated with the approved development including clearing to maintain proposed infrastructure, facilities, roads, access routes, utilities, services and fences, and clearing to maintain the safety of persons and property that will be associated with the development =~ cleaning for necessary fire breaks and fire management lines associated with the development This will be assessed as follows 1 all built infrastructure other than underground services, roads and fences will be assessed as requiring cleanng for firebreaks with a width of 1 5 times the height of the tallest vegetation adjacent to the infrastructure, or 20m, whichever is the greater However, evidence may be provided to NRW that confirms that an alternative firebreak width is required that is consistent wth the State Planning Pohcy (SPP) 1/03 Guideline all proposed allotment boundaries will be assessed as requinng clearing for fire management lines with a width of 10m constructed on either side of the allotment boundary, unless NRW ts provided with evidence that confirms that an alternative width of fire management line 1s required or an alternative configuration of fire management lines are required that ts consistent with the SPP 1/03 Guideline jm in the case of evdence being presented that demonstrates alternative fire management guidelines as being sufficient and consistent with the SPP 1/03, NRW may condition the development so that the full extent of exempt clearing prescribed for essential management under Schedule 8 of the IPA cannot be carned out by current or future landholders — where there is a concurrent application for Reconfiguring of a Lot (RaL) for the same land that has not yet been decided—cleanng as a result of the RaL as set out in the Ral Policy item 2 will be assessed Endangered Regional Ecosystem means a regional ecosystem that is prescribed under a regulation and has either— (a) less than 10% of its pre-clearing extent remaining, or Department of Natural Resources and Water |COSOBNAMOCO2 Page 3 of 4 Page 22 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.