Council archive · source document
DAForm1-DAdetails 25A Kauri St Cooroy 4563 · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (DA Form 1 & New Owners Consent) - MCU18/0165.
6.3) Additional aspects of development
Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
Not required
Section 2 – Further development details
7) Does the proposed development application involve any of the following?
Material change of use Yes – complete division 1 if assessable against a local planning instrument
Reconfiguring a lot Yes – complete division 2
Operational work Yes – complete division 3
Building work Yes – complete DA Form 2 – Building work details
Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
Multiple Housing ( Conventional Type 4) Multiple housing means the use of 17 N/A
2 Stages premises for two or more dwelling
units or accommodation units as
the case may be, occupied by
permanent or semi-permanent
residents, where the occupants
may share common facilities on the
site.
Type 4 Conventional
Means the use of premises for
dwelling units that do not fall within
Multiple housing Types 2, 3, or 5.
The use includes units,
townhouses, flats, apartments,
villas and small dwelling units.
8.2) Does the proposed use involve the use of existing buildings on the premises?
Yes
No
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10)) Dividing land into parts by agreement (complete 11))
Boundary realignment (complete 12)) Creating or changing an easement giving access to a lot
from a construction road (complete 13))
Page 4
DA Form 1 – Development Application details
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DAForm1-DAdetails 25A Kauri St Cooroy 4563 .pdfRelated documentApplication case desk ↗
About this file
- File size
- 199 KB (small file)
- File type
No other editions are linked here.