1-22276-01 site plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnProject No. 1
1-22276 Page | 17
February, 20
020
Ref: 1-22276,
6, 2020-02-28, BR VE
ER 2
Wessel Petrooleum Pty Ltd – GE
EOTECHNICAL INVE
ESTIGATION - Propo
osed Service Statio
on Reconstruction, 52-54 Mary Street aand Weyba Road,
Noosaville
Adopt a nominal
n CB
BR value o
of 5.0% for design (tto be conffirmed based on site
e
conditions).
It is expectted that the
e majority, iff not all of the site will be clearedd following demolition..
Also, all sooils contain
ning organicc and deleterious mattter should be strippe ed from thee
construction area. This material iis not considered suitable for reusse as structural fill.
Proof roll building
b and
d pavement constructio on areas (if appropriatee) using a vehicle
v with
h
a tare of at least 5 to
onnes, unde er the supeervision of Soil
S Surveyss Engineering. Areass
demonstratting excessive moveme ent under proof
p rolling should be treated (dried/wateredd
and recom mpacted) if possible, o or removed d to compe etent materrial and repplaced withh
compacted select fill, as detailed d in the following sec ctions. Treaatment shouuld be to a
standard sufficient
s soo that the subgrade passes
p pro
oof rolling aand that th
he project’ss
compaction n specifications can b be achievedd. In areas of cut, thee proof rolling may be e
deferred to after the cu
ut operation
n.
Any fill matterial encou
untered sho ould be cons sidered unc
controlled a nd requiring
g treatmentt
(i.e. excavaate/conditio
on/replace/ccompact as s required). The degreee of treatm ment workss
should be decided
d on site by Soill Surveys Engineering
E in conjuncttion with oth
her relevantt
parties at th
he time of th
he civil worrks. Refer to
o comments s above in thhis section in relation t
partial subggrade replaccement.
Depression ns formed by b the remo oval of und
derground elements,
e vvegetation, etc. should
d
have all dissturbed, we eakened so oil cleaned out
o and be backfilled wwith compaacted selectt
fill as detailled in the fo
ollowing secctions.
Excavation sides on site
s where n not supported/retained, etc. shou ld be bench hed to "keyy
in" backfill material and optimise ccompactionn. The benc ches should slope backk at 1V:10HH
and be at least 0.5m wide.
w Wideer benches to accommodate the w width of the
e roller mayy
need to be adopted in some situa ations. Figurre 2 refers.
1
10
Min width 0.5m
0
FIGURE 2
Survey of the subgrade surfa ce (i.e. su urface folloowing strippping, demolition and d
preparation n) is recommmended; this survey y will alloww accuratee identificattion of the
e
fill/natural interface and assist witth constructtion of the proposed
p buuildings.
6.2.6 Matterial Usag
ge and Fill
From a geo otechnical perspective
p e, the insitu soils, wherre free of orrganic and deleteriouss
m be used for structtural fill pro
material, may ovided the moisture
m coontent of th
he soils, on
n
placement, approximates the OMC (Opttimum Moiisture Conntent) appropriate forr
SO
OIL SUR
RVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.