Wessel Petroleum Pty Ltd – GEOTECHNICAL INVESTIGATION - Proposed Service Station Reconstruction, 52-54 Mary Street and Weyba Road,
Noosaville
TABLE 6 GEOTECHNICAL DESIGN PARAMETERS
Angle of Shear Strength
Unit Weight
Material type 3 Internal
(kN/m ) Cu (kPa) C’ (kPa)
Friction (°)
Fill / Loose Natural Sands 18.5 26 NA 0
Medium Dense Sands 19.5 33 NA 0
Dense Sands 21.0 35 NA 5
Very Stiff Clays 19.5 27 150 2
Note: The above parameters are based upon interpretations of the soil descriptions and the
reported DCP results.
The lateral earth pressure distribution that affects the retention systems on the site will depend
upon the following parameters:-
Insitu material properties.
Design water regime at the rear of the retention wall.
Retention system type and cut geometry.
Boundary conditions i.e., location and type (i.e., movement sensitivity) of nearby
structures, need for underpinning, adjacent service, surcharges, etc.
The structural bracing/anchoring of the system.
Construction Options
Options which may be considered for temporary retention include:
Batter to safe angle – possible option only if adequate space is available and for shallow
excavations. Refer to Section 6.2.8 of this report.
Sheet piles – Steel sheets are driven or vibrated along the line of the proposed
excavations. Difficulties expected in penetrating lower level soils with pre-boring
expected to be required in the indurated sands.
Pile type system (contiguous, secant, etc). These type of systems involves piers drilled
at nominated spacings, including overlapping, with the spaces, where present, filled with
sprayed concrete, etc. The piers would be drilled to below the depth of maximum
excavation and suitably anchored (if required). The pier spacing depends on the
stability and effect of seepage of the exposed materials during construction as well as
required wall stiffness The Secant system would provide a better watertight retention
system.
Whatever temporary retention system is adopted a detailed design will be required to
determine the appropriate support system. The magnitude of differential settlement /
displacement that may be acceptable will be subject to adjacent conditions (e.g.,
proximity of adjacent services, structures, boundaries). Soil Surveys Engineering is well
placed to assist with the design of any proposed system.
SOIL SURVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.