Appendix D Code Assessment · MCU16/0099.01

of 110

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Appendix D – Code Assessment




                               28


[OCR of page images]
Appendix D — Code Assessment

28
Full text of pages 2 to 97 (of 110)

Page 2

Division 11 — Cooroibah Locality Code
Table 1 Specific outcomes for the Cooroibah locality code
                  Specific Outcomes                                      Probable solutions                                        Comments

 Effects of use
 Amenity                                                    No solution provided                             Complies with O1
 O1       Uses are located, designed and operated to                                                         The proposed access track and power installation
 avoid significant adverse changes to the light, air                                                         to the approved facility will not have a significant
 quality, noise, accessibility or other conditions                                                           adverse impact on the conditions enjoyed by the
 enjoyed by users of associated, adjoining or nearby                                                         users of associated, adjoining or nearby uses. The
 uses.                                                                                                       proposed access track and power installation has
                                                                                                             been strategically located adjacent to the shared
                                                                                                             property boundary to minimise impacts.
 Entrances                                                  No solution provided                             Complies with O2
 O2      The southern and northern entrances to the                                                          The proposed access and power installation will not
 Cooroibah locality are characterised by bushland,                                                           have a significant impact on the bushland character
 which is protected from visually intrusive                                                                  within the Cooroibah locality. Only minor vegetation
 development.                                                                                                removal (three trees) is required to establish the
                                                                                                             proposed access, which is significantly less than
                                                                                                             the vegetation clearing required for the originally
                                                                                                             approved application (approximately 30 m 2). No
                                                                                                             vegetation clearing is required to establish power to
                                                                                                             the approved facility.
 Major road network                                         No solution provided                             Complies with O3
 O3      The function of, and visual amenity and                                                             The proposed changes to the approved
 character surrounding the, major road network,                                                              development will not impact upon the major road
 including McKinnon Drive and Lake Cooroibah                                                                 network in Cooroibah. McKinnon Drive is located
 Road is protected and enhanced.                                                                             approximately 3 km to the west, and Lake
                                                                                                             Cooroibah Road is located approximately 900 m
                                                                                                             east of the subject site. At these distances, the
                                                                                                             proposal will not impact on the function, visual
                                                                                                             amenity or character of these roads. No other
                                                                                                             major roads are located within close proximity to the
                                                                                                             subject site. Construction traffic will only be
                                                                                                             generated for a short duration. Maintenance visits



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 1

Page 3

                Specific Outcomes                                    Probable solutions                                           Comments

                                                                                                            are infrequent and are only required 2-4 times a
                                                                                                            year.
Built form
Density                                                 No solution provided                                O4 is not applicable
O4       The density of development within the site                                                         The proposed changes outlined in this change
area—                                                                                                       application do not relate to density of development.
      is compatible with surrounding development;                                                           The proposed access track and power installation
      and                                                                                                   to the approved facility is designed to coordinate
     has a low site impact to enhance the                                                                   more effectively with the surroundings and avoid
     opportunity to maintain natural site                                                                   adverse impacts to accessibility for adjoining land
     characteristics, including native vegetation and                                                       uses and will maintain natural site characteristics.
     natural landforms.                                                                                     Only minor vegetation removal (three trees) is
                                                                                                            required to establish the proposed access, which is
                                                                                                            significantly less than the vegetation clearing
                                                                                                            required for the originally approved application
                                                                                                            (approximately 30 m2). No vegetation clearing is
                                                                                                            required to establish power to the approved facility.
Height                                                  S5.1     Buildings and other structures have a      O5 is not applicable
O5     Buildings and other structures—                  maximum building height of—                         The proposed changes outlined in this change
     are low rise and present a building height              if in the Rural or Rural Settlement Zone—      application do not relate to buildings and other
     consistent with structures on adjoining and             8 m, or 9 m where the pitched roof but no      structures.
     surrounding premises;                                   other part of the building or structure
     have a maximum building height of 2 storeys;            exceeds 8 m; or
     do not visually dominate the street, surrounding        in all other zones—8 m.
     spaces or the existing skyline;
     preserve the amenity of surrounding land;
     respect the scale of surrounding vegetation;
     and
     respond to the topography of the site and
     avoid extensive excavation and filling.
Setbacks                                                S6.1   Buildings and structures comply with the     O6 is not applicable
O6      Buildings and other structures are              setbacks specified in Schedule 1 - Minimum          The proposed changes outlined in this change
appropriately designed and sited to—                    Boundary Setbacks.                                  application do not relate to buildings and other


                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 2

Page 4

                       Specific Outcomes                                    Probable solutions                                        Comments

          provide amenity for users of the premises as                                                          structures.
          well as preserve the visual and acoustic privacy
          of adjoining and nearby properties;
          preserve any existing vegetation on the site
          that will buffer the proposed building;
          allow for landscaping to be provided between
          buildings;
          maintain the visual continuity and pattern of
          buildings and landscape elements within the
          street; and
          help protect the natural character and visual
          amenity of the Noosa River system.
Site cover                                                     No solution provided                             O7 is not applicable
O7       The site cover of buildings and other roofed                                                           The proposed changes outlined in this change
structures—                                                                                                     application do not involve buildings or roofed
      is of a scale that is compatible with surrounding                                                         structures.
      development;
          for a class 1 or class 10a building within the
          Detached Housing Zone, does not exceed—
    i.      for a single storey building - 50%; or
    ii.     for a building of 2 or more storeys - 50% on
            the ground floor and 30% for the upper
            storey(s), or 40% for all storeys for a building
            of 2 or more storeys;
          for other classes within the Detached House
          Zone - 40%;
          does not present an appearance of bulk to
          adjacent properties, roads or other areas in the
          vicinity of the site;




                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 3

Page 5

                     Specific Outcomes                                     Probable solutions                                            Comments

          maximises the retention of existing mature
          trees and allows for additional deep
          landscaping between buildings;
          allows for adequate area at ground level for
          outdoor recreation, entertainment, clothes
          drying and other site facilities; and
          facilitates onsite stormwater management and
          vehicular access.
Flooding and drainage1                                      S8.1     For new buildings or structures or            Complies with O8
O8        Buildings and other works are designed and        additions of more than 50m2 gross floor area to        The proposed access involves an existing waterway
sited to—                                                   an existing building or structure, floor levels for    crossing which has been assessed and determined
       provide flood free access to premises and flood      habitable rooms are—                                   to provide sufficient access for construction and
       free habitable areas;                                      for areas where minimum floor levels are         maintenance vehicles to the approved facility and
          allow only minor, short term and infrequent             available—not less than the specified            does not result in any new buildings or structures
          flooding of non-habitable areas;                        level;                                           that may increase the risk of adverse flooding or
                                                                                                                   drainage impacts.
          ensure carparking areas can be adequately               for areas where flood modelling is
          drained;                                                available—a minimum of 300mm above
          ensure drainage does not adversely impact               the modelled flood level; and
          upon other premises; and                                for areas where flood modelling is not
                                                                  available, a minimum of 300mm above the
          ensure filling or excavation does not adversely
                                                                  highest known flood level;
          impact upon other premises by—
    i.      causing ponding on the site or nearby land;
                                                            AND
    ii.     increasing flooding, which adversely affects
            the safety or use of any land upstream and
                                                            S8.2     Where Council infrastructure is
            downstream; and
                                                            available—
    iii. adversely affecting the flow of water in any             any drainage (from buildings and land)
         overland flow path.                                      flows to that infrastructure; and
                                                                  the infrastructure has the capacity to
                                                                  accept any additional loading.


                                                            AND


                                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 4

Page 6

                  Specific Outcomes                                   Probable solutions                                           Comments


                                                        S8.3     Car parking and manoeuvring areas are
                                                        constructed at a level that permits the parking
                                                        area to drain from the site by gravity means,
                                                        without the need for mechanical pumping; or

                                                        S8.4    Basements for residential uses have
                                                        flood immunity above the 1%AEP defined flood
                                                        event where alternative means to mechanical
                                                        pumping are used to achieve such immunity; or

                                                        S8.5     Basements for non-residential uses
                                                        have flood immunity above the 1%AEP defined
                                                        flood event that may be achieved by means of
                                                        mechanical pumping only where the mechanical
                                                        feature is installed with adequate holding tanks
                                                        and an alternative back up power source.
Roof form                                               S9.1     The main roof of the building has a roof    O9 is not applicable
O9      Rooflines—                                      pitch no less than 5 degrees and has minimum         The proposed changes outlined in this change
      contribute positively to the local skyline;       600mm eaves to at least 75% of the perimeter of      application do not involve any new buildings or
      complement the character of the locality;         the building;                                        structures and do not involve roofline design.
      are articulated, pitched or skillion;             AND
      avoid low pitched (e.g. less than 5 degrees) or
      box profiles/parapets;                            S9.2     Buildings and structures do not include
      do not create opportunities for residents to      roof top terraces.
      overlook the private open space areas of
      neighbouring properties.
Materials and finishes                                  S10.1 Buildings—                                     O10 is not applicable
O10      Buildings and other structures use materials        use a mix of lightweight and textured           The proposed changes outlined in this change
and finishes that complement the rural character and         external building materials, including          application do not involve any new buildings or
integrate with the surrounding natural landscape             timber, corrugated iron, steel and              structures.
                                                             weatherboard; or




                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 5

Page 7

                 Specific Outcomes                                      Probable solutions                                            Comments

                                                               use masonry construction with where
                                                               variation in texture, detailing and the like;
                                                               use materials and finishes that blend with
                                                               the surrounding vegetation.
Environment, Conservation and Recreation
Environment and cultural heritage values                  No solution provided                                  Complies with O11
O11      There are no significant adverse effects on                                                            The proposed access track to the approved facility
biodiversity, native vegetation, habitat, landscape                                                             will result in less vegetation clearing than the
quality, water quality or cultural heritage values,       Editor’s note:                                        originally approved application, which proposed
including those related to—                               PSP24 – Effluent Disposal details requirements        vegetation clearing for an area of approximately
      changes to natural drainage;                        for the design and siting of effluent disposal        30 m2. Therefore, impacts to protected vegetation
      disturbance of the wetland system;                  systems where located outside a sewerage              within the riparian overlay will be minimised.
                                                          service area. Compliance with PSP24 will be
      management of landslide and fire risk;              considered as part of Council’s assessment of         The proposed access track will not be a publicly
      erosion and the transport of sediments off site;    the plumbing and drainage application.                accessible road and there will be no disturbance to
      unmanaged public access;                                                                                  any existing wetland system.
                                                                                                                The removal of the three trees will allow for an
                       2
      effluent disposal ;                                                                                       adequate fire break between the adjoining property
      changes to fauna habitat and behaviour; and                                                               and the proposed access track and power line. The
                                                                                                                proposed power installation will be installed
      disturbance of buildings and features, including                                                          underground.
      natural features, of cultural heritage
      significance.
Open space network                                        S12.1 Open space corridors and existing               O12 is not applicable
O12       An integrated open space network is             native vegetation in areas indicated in Schedule      The proposed access track is not within an open
established, enhanced and protected throughout the        5 – Map 3 are protected from fragmentation and        space corridor.
locality to—                                              encroachment by development.
       provide for both passive and active recreational
       pursuits;
      provide connectivity for pedestrians, cyclists,
      and horse riders;
      provide habitat connectivity for wildlife;
      protect watercourses and drainage lines;



                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 6

Page 8

                 Specific Outcomes                                       Probable solutions                                           Comments

      protect vegetation on steep slopes; and
      form a scenic backdrop for residential
      development.
Noosa Trail Network                                        S13.1 No solution provided                           O13 and O14 are not applicable
O13       A comprehensive network of bridle trails and                                                          The proposed access track does not cross any
pedestrian and bicycle linkages is established,            S14.1 Development includes linkages to or            known or mapped trails in the Noosa Trail network.
enhanced and protected incorporating road reserves,        between existing or future components of the
State forests, Council owned land and private lands        Noosa Trail Network, as indicated in Schedule 5
consistent with the lifestyle and                          – Map 2;
outdoor recreation needs of the Shire’s residents and
visitors;                                                  AND

AND                                                        S14.2 Development does not have an adverse
                                                           impact on the access functions of the Noosa
O14      Existing and future pedestrian, bridle trail or   Trail Network, as indicated in Schedule 5 – Map
bicycle linkages are retained as part of a Shire wide      3, including severing of existing or future
trail network.                                             linkages; or
                                                           S14.3 Alternative linkages to those indicated in
                                                           Schedule 5 – Map 2 are provided;

                                                           AND

                                                           S14.4 Linkages to the Noosa Trails Network
                                                           are designed and constructed in accordance
                                                           with—
                                                                 Australian Standard 2156.1 Walking
                                                                 Tracks Part 1: Classification and Signage
                                                                 to a minimum of a Class 4 Standard; and
                                                                 Australian Standard 2156.2 Walking
                                                                 Tracks Part 2. Infrastructure Design
Pedestrian and bicycle pathways                            S15.1 Pedestrian and bicycle pathways are            O15 is not applicable
O15     Safe and convenient pedestrian and bicycle         provided and retained where indicated in the         The proposed access track will not be open for
pathways are provided and retained between and             Priority Infrastructure Plan in Part 15;             public access as a pedestrian or bicycle pathway.
around key destinations.



                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 7

Page 9

                   Specific Outcomes                                                   Probable solutions                                                      Comments

                                                                     AND

                                                                     S15.2 Contributions toward pedestrian and
                                                                     bicycle pathways are provided in accordance
                                                                     with the Priority Infrastructure Plan in Part 15.
1 Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These provisions are not limited to areas shown as Flood
Hazard Areas on overlay maps 1.3-9.3.

2 Council may request additional information on the proposed method of effluent disposal to ensure the nature of the development is compatible with environmental
values. Refer to PSP1 – Information Council May Request.




                                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 8

Page 10

Division 14 — Specific Outcomes and Probable Solutions for the Rural
Settlement Zone
Table 2 Specific Outcomes and Probable Solutions for the Rural Settlement Zone
                   Specific Outcomes                                   Probable solutions                                        Comments

 Consistent uses
 O32     The following defined uses and use classes       No solution provided                             O32 is not applicable
 are consistent uses and are located in the Rural                                                          The proposed changes relate to the establishment
 Settlement Zone—                                                                                          of an access track and underground powerline, and
       Cultivation Type 1;                                                                                 is not one of the consistent uses defined in the
       Animal husbandry Type 1;                                                                            specific outcome O32
       Forestry;
       Commercial business Type 1 if an estate sales
       office;
       Commercial business Type 3;
       Home-based business;
       Emergency Service Type 2
       Detached house;
       Community residence; and
       Visitor accommodation Types 1 or 3.
 Inconsistent uses
 O33     The following defined uses and use classes       No solution provided                             O33 is not applicable
 are inconsistent uses and are not located in the Rural                                                    The proposed changes outlined in this change
 Settlement Zone—                                                                                          application involves a newly proposed access and
       Cultivation Type 2;                                                                                 power installation to an approved use.
       Animal husbandry Type 2;
       Commercial business Type 1 where not an
       estate sales office;
       Commercial business Type 2;



                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 9

Page 11

                   Specific Outcomes                                  Probable solutions                                        Comments

      Entertainment and dining business;
      Industrial business;
      Retail business;
      Education;
      Emergency Services Type 1;
      Open Space;
      Wellbeing;
      All Infrastructure Uses;
      Ancillary dwelling unit;
      Multiple housing; and
      Visitor accommodation Types 2 or 4.
Effects of Use
O34     Visitor Accommodation and non-residential        No solution provided                             Complies with O34
uses do not create nuisance by way of noise, dust,                                                        The proposed changes outlined in this change
fumes, vibrations or traffic.                                                                             application do not involve the establishment of
                                                                                                          visitor accommodation and does not produce any
                                                                                                          dust, noise, fumes, vibrations or traffic beyond a
                                                                                                          reasonable standard.
Built form
Visual amenity                                           No solution provided                             Complies with O35
O35     Development is at a scale and nature                                                              The proposed access track is designed to tie-in to
complementary and respectful to its surroundings                                                          the surrounding landscape as it adjoins the shared
and does not unduly impact on the visual amenity of                                                       lot boundary and will result in less vegetation
adjoining and surrounding development;                                                                    clearing than the previously approved application,
                                                                                                          which requires 30 m2 of clearing.
AND
                                                                                                          O36 and O37 are not applicable
O36       Landscaping is established to lightly screen                                                    The proposed changes do not involve the
buildings and other structures when viewed from the                                                       establishment of a new building and therefore will
street, lake or riverfront;                                                                               have no effect on the natural skyline or possible
                                                                                                          views of buildings from the street, lake or riverfront.
AND


                                                                                     Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 10

Page 12

                 Specific Outcomes                       Probable solutions                                        Comments


O37      Buildings and structures do not interrupt the
natural skyline when viewed from the major road
network or any areas of public open space.




                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 11

Page 13

Division 4 — Biodiversity Overlay Code
Table 3 Specific outcomes for the biodiversity overlay code
                      Specific outcomes                       Probable solutions (if code assessment)                                 Comments

 Vegetation retention and conservation3
 Environmental Protection Area & Environmental             S1.1    An Ecological Assessment Report              Complies with O1
 Enhancement Area Vegetation & Riparian Buffer             prepared in accordance with Planning Scheme          The proposed access to the approved facility is
 Area                                                      Policy 18 – Ecological Assessment Guidelines         intended to minimise the amount of vegetation
 O1        Vegetation of local origin4 on premises         demonstrates that the flora on the premises          clearing required within the Riparian Buffer area,
 identified as—                                            does not constitute Environmental Protection         proposing the clearing of three trees, which is
        Environmental Protection Area5 or Riparian         Area or Environmental Enhancement Area               significantly less than the vegetation clearing
        Buffer Area on the Biodiversity Overlay Maps       vegetation.7                                         required for the originally approved application
        OM1.1 to OM9.1, is retained and conserved in                                                            (approximately 30 m2). Furthermore, the proposed
        its present form or improved to ensure its                                                              vegetation clearing within this change application
                                                           OR
        ongoing contribution to the natural resources                                                           will not result in edge effects or fragmentation and
        and biological diversity of the Noosa Shire; and                                                        will maintain the vegetation in manageable and
                                                           S1.2    Where constructing a Detached House;
           Environmental Enhancement Area6 on                                                                   viable configurations. The proposed access will be
                                                           or Community residence interference with
           Biodiversity Overlay Maps OM1.1 – OM9.1, is                                                          within the adjoining lot via a new easement, utilising
                                                           vegetation does not extend beyond—
           protected from the impacts of development                                                            an existing waterway crossing for construction and
                                                                30m of a building or 10m of a structure on
           by—                                                                                                  maintenance vehicle access.
                                                                lots greater than 10ha; or
     i.      avoiding edge effects;                             10m of a building or structure on lots 10ha     O2 is not applicable
     ii.     avoiding fragmentation; and                        or less but more than 0.3ha; or                 The Reconfiguring of a Lot is required for the
     iii. maintaining vegetation in manageable and              3m of a building or structure on lots 0.3ha     proposed easement connecting the subject site to
          viable configurations.                                or less.                                        Jirrima Court through the adjoining lot. No new lots
                                                                                                                are proposed.
 AND
                                                           S2.1    Where clearing vegetation on the
 O2      For the purpose of Reconfiguring a Lot new        premises is for the purpose of Reconfiguring a
 lots are only created where they minimise the             Lot—
 fragmentation and maximise the retention of                    new boundaries to lots do not transect and
 existing vegetation.                                           fragment existing vegetation;




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 12

Page 14

                 Specific outcomes                            Probable solutions (if code assessment)                                Comments

                                                                new lots are created to allow for suitable
                                                                house site areas or other future buildings
                                                                and works to be located within existing
                                                                cleared areas or areas of low ecological
                                                                value; and
                                                                building envelopes are designated for each
                                                                lot.
O3     Clearing vegetation only occurs where—              No solution provided                                Complies with O3
     no other suitable cleared or partially cleared                                                            The proposed access to the approved facility is
     area is available on the premises;                                                                        designed to minimise clearing vegetation to a
     the development minimises the total footprint                                                             greater extent than the originally approved access,
     within which all activities, buildings, structures,                                                       which originally proposed to clear
     driveways and other works are contained; and                                                              approximately 30 m2 of vegetation. The proposed
                                                                                                               access will no longer require extensive vegetation
     the development is located in areas of low                                                                disturbance within the Riparian Buffer Area.
     ecological value over other areas, to the                                                                 Approximately three trees are to be removed to
     greatest extent practicable.                                                                              establish the proposed access.

Editor’s note:
Environmental Protection category
Vegetation that falls within the Environmental
Protection category comprises regional
ecosystems that possess at least one of the
following environmental values or criteria—
• The regional conservation status under the
  Queensland Vegetation Management Act 1999 is
  “Endangered”;
• It forms habitat for threatened or protected fauna
  species, as identified in Vegetation of Noosa
  Shire;
• It is ‘rare’ or naturally restricted regionally or
  locally, as identified in Vegetation of Noosa Shire;
  or


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 13

Page 15

                  Specific outcomes                        Probable solutions (if code assessment)                              Comments

• The extent reserved within protected areas in
  Noosa is ‘low’, as identified in Vegetation of
  Noosa Shire.
Environmental Enhancement category
Vegetation that falls within the Environmental
Enhancement category comprises regional
ecosystems that possess at least one of the
following environmental values or criteria—
• The regional conservation status under the
  Queensland Vegetation Management Act 1999 is
  “Of Concern”; or
•   The extent reserved within protected areas in
    Noosa is ‘medium’, as identified in Vegetation of
    Noosa Shire.
Wetlands                                                S4.1   A minimum separation distance of           O4 is not applicable
O4      Wetlands are protected from removal or          100m is provided between a wetland and any        The proposed access to the approved facility and
degradation and any adverse impacts on wetlands         adjacent development or use.                      power route will not traverse any wetlands.
are prevented, minimised or mitigated by—
      maintaining adequate separation between the
      wetland and any adjacent development or use8;
      minimising any modification of the natural
      characteristics of the wetland, including the
      topography, surface and groundwater
      hydrology, water quality and flora and fauna
      species;
      preventing any new development within
      wetlands;
      minimising access to the wetland;
      minimising impacts associated with pest insect
      control and invasion by undesirable plant
      species; and



                                                                                     Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 14

Page 16

                 Specific outcomes                           Probable solutions (if code assessment)                                 Comments

     providing for the rehabilitation and replanting of
     degraded wetlands.
Riparian Zones                                            S5.1     No new development occurs on, or            Complies with O5
O5       The biodiversity and ecosystem values of         partly on, premises indicated as Riparian Buffer     The proposed access to the approved facility will
watercourses, drainage lines, wetlands and adjacent       Area on Biodiversity Overlay Maps OM1.1 to           utilise the existing waterway crossing and will
riparian zones are protected by—                          OM9.1, except for—                                   therefore allow for wildlife corridors along the
       avoiding any new development in the riparian             temporary use of the land; or                  identified waterway to remain intact.
       buffer area;                                            infrastructure which provides access to a
     retaining aquatic and terrestrial habitat in              watercourse for recreational purposes;
     riparian zones;
     maintaining wildlife corridors along                 OR
     watercourses and drainage lines for native
     fauna movement;                                      S5.2     Where constructing a Detached house
                                                          or Community residence and on an allotment
     avoiding edge effects and incompatible uses in       situated wholly within the Riparian Buffer Area,
     riparian zones;                                            fronting the Noosa River – development is
     maintaining bank stability by minimising bank              setback a minimum of 40m from mean
     erosion and slumping;                                      high water spring or as otherwise
     maintaining water quality by filtering sediments,          prescribed by the Environmental
     nutrients and other pollutants; and                        Protection Agency’s Erosion Prone Area
                                                                Maps;9
     removing undesirable plant species and
     replacing them with vegetation of local origin;           not fronting the Noosa River –
                                                               development is located outside the riparian
                                                               zone and setback a suitable distance from
                                                               the watercourse having regard to the
                                                               development constraints of the property
                                                               and the need to protect environmental and
                                                               riparian values;

                                                          OR

                                                          S5.3    For Animal husbandry on premises in
                                                          the Rural Zone—



                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 15

Page 17

Specific outcomes      Probable solutions (if code assessment)                                 Comments

                          stock proof fencing is installed along
                          watercourses at a distance of no less than
                          10m from the top of the bank;
                          stock watering points are located no less
                          than 15m away from the top of the bank of
                          watercourses; and
                          stock crossing points across watercourses
                          are defined and controlled with stock proof
                          fencing,
                          to prevent stock from damaging riparian
                          vegetation or banks to watercourses;

                    OR

                    S5.4    Recreational facilities (including
                    playgrounds, pergolas, barbeques etc) are
                    setback a minimum of 30m from the top of the
                    bank of a watercourse and 10m from the top of
                    the bank of a drainage line;

                    OR

                    S5.5    For Forestry uses the cultivated area is
                    separated from watercourses by a distance not
                    less than the distances identified below,
                    measured from high water mark or the top of the
                    bank, whichever is the greater distance—
                               Feature                Distance
                      Stream order 1 or 2               5m
                      Stream order 3 or 4              10 m
                      Stream order greater than 4       20 m

                    AND



                                                    Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 16

Page 18

                Specific outcomes                           Probable solutions (if code assessment)                                 Comments

                                                         S5.6     Where Forestry is carried out on that
                                                         part of premises indicated as Riparian Buffer
                                                         Area and outside the separation distances
                                                         specified in S5.5—
                                                               species planted are of local origin and are
                                                               harvested through sustainable harvesting;
                                                               and
                                                              any undesirable plant species are replaced
                                                              by vegetation of local origin.
Managing public access and edge effects                  S6.1    Development adjacent to a waterway           O6 is not applicable
O6      Development on land adjacent to a                or wetland provides that—                            The proposed access will not require a new lot and
waterway or wetland maintains an appropriate                  no new lots directly back onto the riparian     will not be a publicly accessible road. No clearing is
extent of public access to waterways and wetlands             area; and                                       required to establish power to the approved facility.
and minimises edge effects.                                   new public roads are located between the
                                                              riparian buffer and the proposed
                                                              development areas.
Koala Habitat Areas                                      S7.1     Development avoids removing and             Complies with O7
O7     Development is designed, constructed and          fragmenting koala habitat and includes koala         The flora survey undertaken in April 2017 confirmed
operated to—                                             sensitive design measures consistent with the        that the three trees proposed for clearing to
     avoid adverse impacts on koalas and koala           Nature Conservation (Koala) Conservation             establish the proposed access to the approved
     habitat;                                            Plan 2006 and Management Program 2006-               facility are not non-juvenile koala habitat trees.
     provide measures to assist the survival of koala    2016 and Koala Sensitive Design Guideline
     populations in the area to mitigate any potential   201210
     threats or risks to koalas;
                                                         S7.2     Where clearing of non-juvenile koala
     provide for safe and appropriate koala              habitat trees is unavoidable in an area shown
     movement across the landscape; and                  as bushland habitat, high value rehabilitation
     provide for a net gain in mature and actively       habitat or medium value rehabilitation habitat
     regenerating koala habitat.                         on the map called ‘Map of Values’11, such
                                                         clearing is minimised, and a biodiversity offset
                                                         is provided in accordance with the Queensland
                                                         Environmental Offset Policy.
Open space networks & ecological linkages                S8.1     Vegetation and ecological linkages are      O8 is not applicable
O8     Open space networks and ecological                enhanced through revegetation, rehabilitation        The proposed access and power route are not


                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 17

Page 19

                     Specific outcomes                         Probable solutions (if code assessment)                                  Comments

linkages are maintained and enhanced to provide             and vegetation maintenance in areas indicated         within an open space network.
for safe movement of fauna and viable connectivity          in Schedule 5 on Map 4 - Open Space
between ecologically important areas by protecting          Networks in such a way as to—
and replanting vegetation of local origin—                        ensure protection of wildlife refuges;
      along and around watercourses, wetlands,                     facilitate the dispersal and movement of
      drainage lines and ridgelines; and                           native wildlife; and
          as linkages between areas of remnant                     maintain vegetation in patches of the
          vegetation, including—                                   greatest possible size and with the
    i.      across property boundaries;                            smallest possible edge-to-area ratio.
    ii.     to areas of national park, conservation park,
            State forest or reserve; and                    AND
    iii. into adjoining local government areas.
                                                            S8.2      Development is sited and designed to—
                                                                   maximise the ecological connectivity of
                                                                   vegetation within the site and to adjacent
                                                                   sites;
                                                                   to avoid creating physical barriers and
                                                                   safety hazards (such as roads, pedestrian
                                                                   access and in-stream structures) to the
                                                                   movement of fauna along and within the
                                                                   ecological linkage; and
                                                                   provide mitigation measures such as
                                                                   wildlife movement infrastructure, fauna
                                                                   exclusion and directional fencing,
                                                                   underpasses, overpasses and traffic
                                                                   calming devices, signage and lighting.
Scenic amenity                                              S9.1 and S10.1 Vegetation is retained and             Complies with O9 and O10
O9      The scenic amenity and vegetated                    enhanced—                                             No vegetation removal is proposed along
character of the locality and its watercourses,                  within 30m of prominent ridgelines and hill      watercourses and drainage lines. No vegetation
drainage lines, sloping land and ridgelines is                   slopes;                                          removal is proposed within the other areas listed.
retained and enhanced;                                             in gullies;
AND



                                                                                             Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 18

Page 20

                  Specific outcomes                         Probable solutions (if code assessment)                                  Comments

                                                               along watercourses and drainage lines;
O10      Vegetation which makes a positive                     and
contribution to the streetscape or major road                  within 10m of road reserves.
network is retained.
Habitat trees                                            S11.1 No clearing of koala habitat trees              Complies with O11
O11      Habitat trees (including dead trees) and        greater than 4 m in height or with a diameter         The three trees proposed for clearing to establish
recruitment habitat trees are protected for native       greater than 100 mm at 1.3 m above the                the proposed access to the approved facility are not
fauna habitat, where practicable.                        ground;                                               koala habitat trees.

                                                         AND

                                                         S11.2 No clearing of other habitat trees or
                                                         recruitment habitat trees.
Lake Macdonald                                           No solution provided.                                 O12 is not applicable
O12     Vegetation within 400m of the full ponded                                                              The proposed access and power route are not
water within Lake Macdonald is retained.                                                                       located within 400 m of Lake Macdonald.

Steep slopes                                             No solution provided.                                 O13 is not applicable
O13     Vegetation on steep slopes is retained and                                                             No vegetation removal on steep slopes is proposed.
managed to avoid erosion and landslide and to
protect natural resources and values.
Engineering and site works                               S14.1 Works, including roads, driveways,              Complies with O14
O14     Development is sited and designed to—            fences, sewer lines and other infrastructure—         The proposed access to the approved facility will
      provide adequate separation distance between            do not transect areas of vegetation; or          transect fewer areas of vegetation and will allow for
      the vegetation to be protected and the                   are co-located within a combined utility        less earthworks for the installation of underground
      development to avoid disturbing, destabilising           corridor; and                                   power. It is not anticipated that the proposed
      and deoxygenating any tree or altering the                                                               access and power route will fragment significant
      drainage;                                                provide for fauna underpasses, speed            flora or fauna species as only three trees are
                                                               reduction devices and associated fencing,       proposed to be removed.
      avoid traversing or fragmenting vegetation or            lighting and warning signs, where
      habitats for significant flora or fauna species;         appropriate;
      and
      avoid creating barriers to faunal movement.        AND

                                                         S14.2 Development within or adjacent to



                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 19

Page 21

                 Specific outcomes                    Probable solutions (if code assessment)                                    Comments

                                                   areas of vegetation, incorporate fauna friendly
                                                   fences;

                                                   AND

                                                   S14.3 Vegetation is protected from
                                                   interference resulting from clearing or
                                                   construction activities by—
                                                          clearly marking vegetation to be retained
                                                          with flagging tape;
                                                         installing protective fencing around the
                                                         dripline of the vegetation and avoid filling
                                                         and excavation in these fenced areas; and
                                                         ensuring stock piling, storage and vehicle
                                                         parking occur outside the identified
                                                         vegetation areas;

                                                   AND

                                                   S14.4 Low impact construction techniques
                                                   are used around vegetation to minimise
                                                   interference with the vegetation.
Filling and excavation                             No solution provided.                                   Complies with O15
O15      Vegetation is not adversely impacted                                                              Earthworks will only be required for the provision of
upon by earthworks and changes to the                                                                      power to the approved facility and will not result in
hydrological regime, including changes to ground                                                           changes to vegetation, or the hydrological regime of
water levels, flooding levels, run-off and tidal                                                           the waterway
hydraulics.
Vegetation management
Replanting and rehabilitation                      S16.1 Landscaping and rehabilitation                    O16 is not applicable
O16      Development provides for ecologically     complements and supports ecologically                   Ecologically important areas will not be significantly
important areas to be restored and enhanced        important habitats by—                                  impacted upon as a result of the proposed access
through the following measures—                         utilising native plants of local origin;           and power route to the approved facility.




                                                                                      Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 20

Page 22

                 Specific outcomes                          Probable solutions (if code assessment)                                   Comments

     siting landscaped areas to complement and                 utilising suitable plant species identified in
     enhance existing vegetation;                              PSP3 – Landscaping Plants and
     removal of all species likely to displace native          Guidelines;
     flora species or degrade fauna habitat;                   replicating adjacent remnant habitats,
     replanting and rehabilitating12 degraded habitat;         including understorey vegetation;
     and                                                       creating or enhancing linkages between
     replacing any vegetation removed with suitable            existing habitats;
     replacement vegetation of local origin.                   avoiding the use of undesirable plant
                                                               species listed in Table 9.1 of PSP3
                                                               Landscaping Plants and Guidelines; and
                                                               planting riparian zones to filter stormwater
                                                               run-off and provide for wildlife habitat;
                                                         AND

                                                         S16.2 Vegetation removed is replaced with—
                                                              plantings of equivalent area that replicate
                                                              the floristic structure of the vegetation
                                                              removed; or
                                                               where this is not possible due to the
                                                               characteristics of the site and the
                                                               development, plantings twice the number
                                                               of the removed trees and plants of local
                                                               origin.
Fire management                                          No solution provided                                   Complies with O17
O17    Fire management measures are adopted                                                                     The proposed access to the approved facility will
based on ecological principles, which—                                                                          act as a fire break between the approved facility
      maintain and enhance biodiversity;                                                                        and Jirrima Crescent. This will be achieved through
     minimise threat of fire to the natural                                                                     the establishment of the access track through a less
     environment, life and property; and                                                                        densely vegetated area which ensures less risk in
                                                                                                                the event of a bushfire.
     provide for effective use and maintenance of
     buildings and structures.




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 21

Page 23

                  Specific outcomes                             Probable solutions (if code assessment)                             Comments

Clearing protected vegetation in the protected               No solution provided                             Complies with O18
vegetation overlay area                                                                                       The proposed access track to the approved facility
O18     Clearing protected vegetation does not                                                                will necessitate less vegetation clearing than the
involve—                                                                                                      originally approved application. Therefore, impacts
      the removal of vegetation in ecologically                                                               to protected vegetation in the riparian vegetation
      important areas;                                                                                        area will be minimised.
      removal of vegetation or habitat for fauna
      identified or referred to as requiring protection in
      State or Commonwealth legislation;
      removal of vegetation located on a prominent
      hillside, slope or ridgeline;
      vegetation within 400 metres of the full level of
      ponded water within Lake Macdonald;
      removal of riparian vegetation;
      vegetation which is or is capable of forming or
      contributing to a buffer between different land
      uses;
      vegetation which is or is capable of forming or
      contributing to a visual buffer or a buffer against
      pollution, light spillage or noise;
      vegetation which contributes to scenic amenity
      or landscape quality;
      vegetation the clearing of which may cause or
      contribute to erosion or slippage.
O19     Clearing protected vegetation does not               No solution provided                             Complies with O19
increase the likelihood of or result in adverse                                                               The proposed vegetation clearing required to
impacts on—                                                                                                   establish the proposed access track and power
      remnant vegetation of local origin, classified as                                                       route to the approved facility will not result in
      remnant of concern regional ecosystem or                                                                adverse impacts to the environment or scenic
      remnant endangered regional ecosystem or is                                                             amenity. Only three trees are to be removed to
      vegetation located in a wetland;                                                                        allow for construction and maintenance vehicle
                                                                                                              access.



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 22

Page 24

                    Specific outcomes                                      Probable solutions (if code assessment)                                                   Comments

    the diversity of flora or fauna species supported
    or likely to be supported by the vegetation
    community;
    a flora or fauna community or individual species
    which has conservation status in State or
    Commonwealth legislation;
    hydrology of an area or upon a hydrologically-
    sensitive plant community such as heathland,
    sedgeland, melaleuca forest or mangrove forest;
    a water catchment area or water quality;
    vegetation which has cultural heritage values;
    vegetation required to support, protect and
    maintain biodiversity values within the Noosa
    Shire, whether these be of local, regional, state
    or national significance;
    a person or industry reliant on maintaining the
    vegetation; or
    neighbouring land, scenic amenity and
    environmental values.
3 PSP18 Ecological Assessment Guidelines details information Council may require as part of an information request.

4 Local origin is defined in the Dictionary (Part 2 Interpretation)

5 Refer to Council’s Vegetation of Noosa Shire study for further details on what constitutes Environmental Protection vegetation.

6 Refer to Council’s Vegetation of Noosa Shire study for further details on what constitutes Environmental Enhancement vegetation.

7 This solution does not apply to the Riparian Buffer Area.

8 The extent of separation will be determined from the size, values and vulnerability of the wetland, likely natural fluctuations, and the nature of potential threats to its
integrity and functions.

9 The Erosion Prone Area map for the Noosa River is reproduced in Schedule 5.




                                                                                                                Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 23

Page 25

10 Schedule 7 Koala Habitat Areas is used for assessing development in koala habitat areas against the Biodiversity Overlay Code provisions and the koala conservation criteria contained in the
Nature Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and the Koala Sensitive Design Guideline 2012. Koala habitat trees are not confined to the areas
mapped in Schedule 7, but also occur throughout other parts of Noosa Shire.

11 The Assessable Development Area Koala Habitat Values are mapped in the South East Queensland Koala Conservation State Planning Regulatory Provisions.

12 Revegetation and rehabilitation works are to be carried out in accordance with an approved Revegetation and Rehabilitation Management Plan, as referred to in
PSP18 Ecological Assessment Guidelines




                                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 24

Page 26

Division 9 — Natural Hazards Overlays Code
Table 4 Specific outcomes for the natural hazards overlay code
                  Specific outcomes                                       Acceptable solutions                                         Comments
                                                                      (if accepted development)
                                                                            Probable solutions
                                                                           (if code assessment)
 Effects of use
 General                                                  S1.1    The proposed development is not                Complies with S1.1
 O1      Development is located to ensure it does not     located in a landslide hazard area as indicated        The proposed access and power installation to the
 compromise the safety of people, property or             on Overlay Maps OM1.3-OM9.313;                         approved facility are not proposed within areas of
 hazardous materials manufactured or stored in bulk                                                              landslide hazard and will therefore not compromise
 by increasing risk of landslide;                         OR                                                     the safety of people, property, or hazardous
                                                                                                                 materials.
 AND                                                      S1.2    The development site is not subject to
                                                          landslide, either internally or from sloping land      Complies with S1.2
 O2     Development, including access ways is             above the site e.g. slopes are less than 1 in          The proposed access and power installation to the
 designed and constructed to—                             10 (10%)                                               approved facility are not subject to landslide as the
      minimise impacts on the natural landform;                                                                  slopes in the subject area are less than 10%.
       minimise risk to people and property from          AND
       landslide;                                                                                                S1.3 is not applicable
                                                          S1.3     Development, including necessary              The proposal is not located within Precinct F.
       avoid any potential instability and associated     earthworks within Precinct F of the Noosa
       problems, including long term stability of the     Springs site, improves the stability of any non-
       site and long-term stability of the development.                                                          Complies with O2
                                                          natural landform so it is not at risk from
                                                                                                                 The proposed access will have minimal impact on
                                                          landslide either on the site or from sloping land
                                                                                                                 natural landform as only a gravel upgrade is
                                                          above the site.
                                                                                                                 required to provide safe all-weather access for
                                                                                                                 construction and maintenance vehicles. The
                                                          S2.1    No solution provided
                                                                                                                 proposed power will be installed underground and
                                                                                                                 will have no impact on landform. Both the proposed
                                                                                                                 access and power installation to the approved
                                                                                                                 facility will not increase the risk to people and
                                                                                                                 property from the original approved routes.
 Protection of Infrastructure and Community               S3.1 Community Uses and Infrastructure Uses            O3 is not applicable
 Uses                                                     are not located in a landslide hazard area as          The proposal does not involve a community use or
 O3      Community Uses and Infrastructure Uses,          indicated on Overlay Maps OM1.3- OM9.3;                an infrastructure use.


                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 25

Page 27

                    Specific outcomes                                     Acceptable solutions                                         Comments
                                                                      (if accepted development)
                                                                            Probable solutions
                                                                           (if code assessment)
 including that identified below, are able to function
 effectively during and immediately after landslide        OR
 events—
       Emergency service facilities;                       S3.2   The community infrastructure
       Hospitals;                                          development—
                                                                does not result in any new building work
       Education Type 4 uses, including stores for              other than an addition to an existing
       valuable records or items of historic or cultural        building;
       significance; and
                                                                 does not involve vegetation clearing; and
       Service and utility use, including electricity
       substations, major electrical depots and water            does not alter ground levels or stormwater
       treatment plants.                                         conditions;

                                                           OR

                                                           S3.3    The development includes measures
                                                           that ensure—
                                                                 the long-term stability of the site;
                                                                 access to the site will not be impeded by a
                                                                 landslide event; and
                                                                 the community infrastructure will not be
                                                                 adversely affected by landslides
                                                                 originating on sloping land above the
                                                                 site14.


Table 5 Bushfire hazard overlay areas15
                    Specific Outcomes                                     Probable solutions                                           Comments

 Effects of use and works
 New Uses                                                  S4.1    The use is sited on land that is not in a     Complies with O4
 O4      The proposed use does not compromise              Bushfire Hazard Area16;                               The use of the area for the approved facility has


                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 26

Page 28

                   Specific Outcomes                                      Probable solutions                                          Comments

the safety of people or property from bushfire.                                                                 been determined to not compromise the safety of
                                                          OR                                                    people or property in the event of a bushfire. The
                                                                                                                proposed access track and power route that is the
                                                          S4.2     The use is sited on land that is             subject of this change application will not increase
                                                          determined as low bushfire risk by a site-            this risk.
                                                          specific bushfire hazard assessment;17
Protection of Infrastructure and Community Uses           S5.1     Community Uses and Infrastructure            O5 is not applicable
O5       Community Uses and Infrastructure Uses,          Uses are not located in Bushfire Hazard Area;         The proposed access and power installation to the
including that identified below, are able to function                                                           approved facility is not associated with any of the
effectively during and immediately after bushfire         OR                                                    community or infrastructure uses listed.
events—
      Emergency service facilities;                       S5.2     Building work will not involve more than
      Hospitals;                                          an additional 20m2 of gross floor area to an
                                                          existing building;
      Education Type 4 uses, including stores for
      valuable records or items of historic or cultural   OR
      significance; and
      Service and utility use, including electricity      S5.3    Where located in a Bushfire Hazard
      substations, major electrical depots and water      Area, uses are designed to function effectively
      treatment plants.                                   during and immediately after bushfire events
                                                          and have direct access to low hazard evacuation
                                                          routes18.
Hazardous materials                                       S6.1    Hazardous materials are not                   O6 is not applicable
O6       Public safety and the environment are not        manufactured and stored in a Bushfire Hazard          The proposed access and power installation to the
adversely affected by the detrimental impacts of          Area.                                                 approved facility does not involve the storage of
bushfire on hazardous materials manufactured or                                                                 hazardous materials.
stored in bulk.
Siting, design and construction
O7       Uses and works including building works          S7.1   Uses and works including building              O7 is not applicable
are sited, designed and constructed to—                   works are sited—                                      No building works are proposed.
      minimise the number of people and property               on lots greater than 2500m2;
      subject to bushfire risk; and                            i.   in locations of lowest hazard within the
      maximise the protection of people and property                lot (Figure 13.5 provides guidance); and
      during the passage of a fire front.




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 27

Page 29

                Specific Outcomes                                    Probable solutions                                          Comments

                                                       ii.     to achieve setbacks from hazardous
                                                               vegetation of 1.5 times the predominant
                                                               mature canopy tree height or 10m
                                                               whichever is the greater; and
                                                       iii. 10m from any retained vegetation strips
                                                            or small areas of vegetation; and
                                                       iv. so that the elements of the development
                                                           least susceptible to fire are sited closest
                                                           to the bushfire hazard;
                                                             on lots 2500m2 or less - to maximise
                                                             setbacks from hazardous vegetation37
O8       An adequate and accessible water supply    S8.1    For premises not in a water service            Complies with O8
is provided for firefighting purposes and can be    area—                                                  The use of the area for the approved facility has
accessed by firefighting appliances.                each lot has an accessible dam, swimming               been determined to comply with this specific
                                                    pool or water tank accessible by the fire              outcome and has suitable access to a water supply
                                                    brigade that contains at least 5000 litres of          for firefighting purposes. The proposed access track
                                                    water.                                                 and power route that is the subject of this change
                                                                                                           application will not affect this access.

Vehicle access and fire trails
Firebreaks and fire access tracks                   S9.1       Firebreaks are provided by—                 O9 is not applicable
O9      Firebreaks or fire access tracks provide—            a cleared road reserve not less than 20m      No firebreaks or fire access tracks are proposed.
      adequate access for firefighting and other             wide located around the perimeter of the      However, the proposed access to the approved
      emergency vehicles; and                                development;                                  facility will provide adequate access for firefighting
     adequate width to minimise the risk of fire             OR                                            and emergency vehicles in the event of a bushfire.
     crossover.                                              fire access tracks between the
                                                             development and surrounding vegetated
                                                             lands that—
                                                       i.      are a minimum cleared width of 6m;
                                                       ii.     have a maximum grade of 1 in 8
                                                               (12.5%) ;
                                                       iii. have a formed pavement;



                                                                                      Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 28

Page 30

                      Specific Outcomes                                       Probable solutions                                           Comments

                                                                   iv. have access at each end and in other
                                                                       locations where necessary;
                                                                   v.   have passing areas and turning areas;
                                                                   vi. have clearly identified access points for
                                                                       emergency vehicles; and
                                                                   vii. are located on public land or within
                                                                        access easements that are granted in
                                                                        favour of the Noosa Council and the
                                                                   viii. Queensland Fire and Rescue Service.19
Reconfiguring a Lot
General                                                       S10.1 The proposed lots are not located on             O10 is not applicable
O10     The safety of people and property are                 land that is subject to Bushfire Hazard20;             The proposed access and power route to the
maintained by                                                                                                        approved facility are not associated with a house
     Locating house site areas and other sensitive            OR                                                     site or a sensitive use. The Reconfiguring of a Lot
     uses on that part of the land least affected by                                                                 is required for the proposed easement connecting
     the bushfire hazard; and                                 S10.2 The proposed lots are sited on land              to Jirrima Court. A new lot is not proposed.
          fire mitigation methods are used that are           determined as low bushfire risk by a site-specific
          adequate for the Potential Bushfire Hazard          bushfire hazard assessment.21
          rating of the individual site, having regard to –
                                                              AND
    i.      vegetation type;
    ii.     slope;                                            S10.3 Additional lots are not created where
    iii. aspect;                                              their only vehicular access route is through a
                                                              Bushfire Hazard area .
    iv. on-site and off-site fire hazard implications of
        the development;
    v.      bushfire history;
    vi. conservation values of the site; and
    vii. ongoing maintenance.




                                                                                                Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 29

Page 31

                Specific Outcomes                                     Probable solutions                                           Comments

Firebreaks and fire access tracks                   S11.1 Firebreaks are provided by—                        O11 is not applicable
O11     Firebreaks or fire access tracks provide—        a cleared road reserve not less than 20m            No firebreaks or fire access tracks are proposed.
      adequate access for firefighting and other         wide located around the perimeter of the            However, the proposed access to the approved
      emergency vehicles; and                            subdivision, between the created lots and           facility will provide adequate access for firefighting
     adequate width to minimise the risk of fire         surrounding vegetated lands;                        and emergency vehicles in the event of a bushfire.
     crossover.                                              OR
                                                             fire access tracks (may be in the form of
                                                             an access easement) between the created
                                                             lots and surrounding vegetated lands
                                                             that—
                                                       i.      are a minimum cleared width of 6m;
                                                       ii.     have a formed pavement;
                                                       iii. have access at each end and in other
                                                            locations where necessary;
                                                       iv. have passing areas and turning areas;
                                                       v.      have clearly identified access points for
                                                               emergency vehicles; and
                                                       vi. are located on public land or within
                                                           access easements that are granted in
                                                           favour of the Noosa Council and the
                                                           Queensland Fire and Rescue Service22.
Road network                                        S12.1 Cul-de-sacs or no-through roads are not            O12 is not applicable
O12    Roads provide for the safe and effective     used in the street network unless—                       The proposal does not involve new roads.
evacuation of users of premises and access by             a perimeter road reserve with a minimum
Emergency services.                                       reserve width of 20m and a formed width
                                                          of not less than 6m is provided; or
                                                             cul-de-sacs or no-through roads are
                                                             provided with fire trails or access
                                                             easements, capable of being navigated by
                                                             conventional vehicles, that link to through
                                                             roads (see Figures 1 and 2);
                                                    AND


                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 30

Page 32

Specific Outcomes                    Probable solutions                                             Comments


                    S12.2 Roads have a maximum grade of 1 in 8
                    (12:5%).




                    Figure 1: Consistent road network and lot layout




                    Figure 2: Inconsistent road network and lot layout




                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 31

Page 33

                Specific Outcomes                                    Probable solutions                                           Comments




Lot design                                         S13.        Each residential lot—                        O13 is not applicable
O13     Lot design and building siting minimises            includes a house site area, identified on       The Reconfiguring of a Lot is required for the
bushfire hazard to people and property having               the plan of subdivision;                        proposed easement connecting to Jirrima Court. A
regard to slope, aspect, existing vegetation and            is of sufficient size and dimensions to         new lot is not proposed.
adequate separation from hazardous vegetation.              accommodate a dwelling and ancillary
                                                            buildings and use areas;
                                                            for lots more than 2,500m—
                                                      i.      conform with the principles for house
                                                              site numbers 1, 2 or 3 shown in Figure
                                                              3; and
                                                      ii.     are separated from hazardous
                                                              vegetation for a distance the minimum
                                                              of 1.5 times the predominant mature
                                                              canopy height or 10m, whichever is the
                                                              greater; and




                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 32

Page 34

                    Specific Outcomes                                                    Probable solutions                                                       Comments

                                                                           iii. for lots less than 2,500m2, maximise
                                                                                separation of buildings from hazardous
                                                                                vegetation.
                                                                      S13.2 Residential lots are designed so that
                                                                      their size and shape allow for efficient
                                                                      emergency access to buildings for firefighting
                                                                      appliances (e.g. by avoiding long narrow lots
                                                                      with long access driveways).

                                                                      Figure 3: House sites in bushfire hazard areas




13 If Acceptable Solution 1.1 is complied with no further action is required. PSP1 details information Council may request to determine whether or not the site is at risk from landslide.

14 PSP1 details information Council may request including the preparation of a site-specific geotechnical analysis prepared by a registered professional to demonstrate
the achievement of the solution to the satisfaction of the Council.

15 In accordance with Section 12 of the Building Regulation 2006, any building assessment work in a designated bush fire prone area must comply with the bushfire
protection provisions of the BCA. Land shown as Bushfire Hazard Area on the overlay maps is designated as the bushfire prone area for the purposes of the Building
Regulations 2006. The bushfire hazard area includes land covered by the very high, high and medium bushfire hazard areas as well as the buffer area category on the
overlay maps.

16 If probable solution S4.1 or S4.2 is complied with no further action is required. PSP1 details information Council may request to determine whether or not the site is in a
Bushfire Hazard Area, as well as information relating to the preparation a Bushfire Management Plan. Appendix 9 of the SPP Guidelines: Mitigating the Adverse Impacts of
Flood, Bushfire and Landslide provides more information on Bushfire Management Plans.

17 A site specific bushfire hazard assessment is necessary to demonstrate that although the site is identified within a Bushfire Hazard Area, the bushfire risk is low as per
PSP1 detailing the site-specific assessment of bushfire risk prepared in accordance with Appendix 3 of the SPP Guidelines: Mitigating the Adverse Impacts of Flood,
Bushfire and Landslide.



                                                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 33

Page 35

18 PSP1 details information Council may request for determining whether or not the site is in a Bushfire Hazard Area, as well as information relating to the preparation a
Bushfire Management Plan. Appendix 9 of the SPP Guidelines: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide provides more information on Bushfire
Management Plans.

19 Where Council has not previously approved a Bushfire Management Plan for premises, Council may request the proponent to prepare a plan, as per PSP1 Information
Council May Request. Appendix 9 of the SPP Guideline: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide provides more information on Bushfire
Management Plans.

20 PSP1 details information Council may request to determine whether or not the land is in a Bushfire Hazard Area.

21 A site specific bushfire hazard assessment is necessary to demonstrate that although the site is identified within a Bushfire Hazard Area, the bushfire risk is low as per
PSP1 detailing the site-specific assessment of bushfire risk prepared in accordance with Appendix 3 of the SPP Guidelines: Mitigating the Adverse Impacts of Flood,
Bushfire and Landslide.

22 Where Council has not previously approved a Bushfire Management Plan for premises, Council may request the proponent to prepare a plan, as per PSP1 Information Council May Request.
Appendix 9 of the SPP Guideline: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide provides more information on Bushfire Management Plans.




                                                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 34

Page 36

Division 5 — Infrastructure Uses Code
Table 6 Specific outcomes for the infrastructure uses code
                  Specific outcomes                            Probable solutions (if code assessment)                                   Comments
 Effects of use
 Location and siting                                         S1.1 For Installations and Towers, where              Complies with O1
 O1     The location and siting of Infrastructure            practicable, infrastructure is —                      The change application proposes a new access
 Uses—                                                             co-located with existing Infrastructure         and power installation to the approved Type 3
       maximises accessibility for maintenance                     Uses; or                                        Tower Facility. The access is to be installed within
       purposes; and                                               located on or within an existing building;      an easement to ensure the access to the approved
       does not disrupt access for other purposes.                                                                 facility is maintained.
                                                             AND

                                                             S1.2    Easements for access to Infrastructure
                                                             Uses are granted to the Council or the
                                                             beneficiary of the easement to ensure suitable
                                                             access can be gained, where practicable.
 Separation from incompatible uses                           No solution provided.                                 Complies with O2
 O2     Sufficient separation distance is provided                                                                 The proposed access track and powerline
 between Infrastructure Uses and incompatible uses                                                                 installation are sufficiently separated from the other
 on the same site and neighbouring premises to                                                                     uses within the property and will not interfere with
 maintain amenity for neighbouring uses.                                                                           the amenity of the site or neighbouring sites.

 O3      Vehicular access to the site of the                 S3.1     Vehicle access to the infrastructure is      Complies with O3
 Infrastructure Use does not adversely impact on             gained from roads other than local residential        The proposed access will not have an adverse
 residential amenity.                                        streets to maintain residential amenity.              impact on residential amenity as no buildings or
                                                                                                                   structures are proposed close to Jirrima Crescent.

 Building siting and design                                  No solution provided                                  O4 is not applicable
 O4      The siting and design of buildings or other                                                               No buildings or structures are proposed within the
 structures reflects and is compatible with the setting                                                            change application. The proposed access and
 and character of the locality in which the                                                                        power installation will have no additional impact to
 Infrastructure Use is located, including the use                                                                  amenity in the area.
 of sympathetic colour schemes.


                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 35

Page 37

                 Specific outcomes                         Probable solutions (if code assessment)                                  Comments
Safety and security                                      S5.1   For Installations and Towers—the use is       Complies with O5
O5     Infrastructure Uses are secure and potential      fenced with security fencing;                        The proposed powerline infrastructure will be
impacts from vandalism are minimised.                                                                         located underground and will therefore not be
                                                         AND                                                  impacted by potential vandalism.

                                                         S5.2     For other Infrastructure Uses—no
                                                         probable solution
Artificial lighting                                      S6.1     Lighting associated with the use is         O6 is not applicable
O6       The generation of spill light by development,   designed, installed, operated and maintained in      No artificial lighting is proposed as part of this
which gives rise to annoyance, discomfort, distraction   accordance with Section 3 of AS4282 The              application.
or a reduction in the ability to see essential           Control of the Obtrusive Effects of Outdoor
information, is avoided.                                 Lighting.
Mechanical plant and equipment                           S7.1     Plant and equipment are—                    O7 is not applicable
O7       Mechanical plant and equipment                        located more than 2m from any property         No permanent plant or equipment are proposed as
(including air conditioning equipment) are—                    boundary; and                                  part of this application.
       positioned to minimise adverse impacts on the           screened by dense vegetation or fencing
       amenity of any residential premises;                    (i.e. 1.5m wide vegetated buffer area);
     designed and positioned to visually integrate       OR
     with the building and roof design; and
     appropriately screened.                             S7.2     Plant and equipment are located within
                                                         a building.
Environment & heritage values                            No solution provided                                 Complies with O8
O8     There are no significant adverse effects on the                                                        The proposed access track, powerline infrastructure
biodiversity, natural vegetation, native wildlife,                                                            and tree clearing that is the subject of this
habitats, landscape quality, water quality or heritage   Editor’s Note:                                       application will not result in adverse impacts on
values, including those related to—                      PSP24 – Effluent Disposal details requirements       biodiversity, natural vegetation, native wildlife,
      changes to natural drainage;                       for the design and siting of effluent disposal       habitats, landscape quality, water quality or
     disturbance to any of the wetland                   systems where located outside a sewerage             heritage. Only three small trees are to be removed
                                                         service area.                                        to establish access. No vegetation disturbance or
     systems;
                                                         Compliance with PSP24 will be considered as          removal will occur as a result of the power
     management of landslide and fire risk;              part of Council’s assessment of the plumbing         installation.
     erosion and the transport of sediments off- site;   and drainage application
     unmanaged public access;
     effluent disposal;



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 36

Page 38

                   Specific outcomes                        Probable solutions (if code assessment)                                 Comments
       changes to fauna habitat and behaviour; and
       disturbance of buildings and features, including
       natural features, of heritage significance


Table 7 Service and utility type 3 - tower
                   Specific outcomes                        Probable solutions (if code assessment)                               Comments
 Effects of use
 Visual amenity                                           S10.1 The tower is—                                 O10 is not applicable
 O10      The tower is visually integrated with its            not established in the Detached Housing,       No changes to the approved tower are proposed
 landscape or townscape setting so as not to be                Semi-Attached Housing, Attached Housing        within the change application. The proposed
 visually dominant or obtrusive.                               or Visitor Mixed Use Zones;                    access track and power installation to the
                                                                camouflaged through the use of colours        approved facility will not result in the worsening
                                                                and materials which blend into the            of visual amenity impacts, health and safety or
                                                                surrounding landscape; and                    access to sunlight.
                                                                unobtrusive when viewed from any part of
                                                                the major road network;


                                                          OR

                                                          S10.2 The tower is co-located on an existing
                                                          telecommunication tower;

                                                          AND

                                                          S10.3 The height of the tower does not
                                                          exceed—
                                                               20 metres where on land in the
                                                               Community Services, Business Centre or
                                                               Industry Zones; or
                                                                25 metres where on land in the Rural
                                                                Zone.



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 37

Page 39

                Specific outcomes                        Probable solutions (if code assessment)                                 Comments
Health and safety                                      No solution provided                                  Complies with O11
O11      The development avoids or effectively                                                               The approved facility, proposed access and
manages any emissions of light, noise, vibration or                                                          power installation will effectively manage noise,
radiation beyond the site such that—                                                                         vibrations and radiation in accordance with
      environmental nuisance to occupants or users                                                           Australian Standards and the ARPANSA
      of surrounding premises is not caused;                                                                 guidelines. The proposed access and power
     unacceptable risks to the environment or to                                                             installation will not emit light.
     personal and public safety are unlikely to be
     caused; and
     public access is restricted to meet workplace,
     health and safety requirements.
Access to sunlight                                     S12.1 For proposed buildings or structures            Complies with O12
O12     The Tower does not cast shadows such that      having a height exceeding 8.5m above ground           The approved facility will not over shadow
the amenity of surrounding premises or useability of   level and a cross sectional area exceeding            residential dwellings, child care centres or public
public open space is unduly reduced.                   20m2, shadowing does not affect residential           open space. The proposed access and power
                                                       lots, child care centres or public open space to      installation will have no impact on shadowing.
                                                       the extent of more than 20% of their site area        Power will be installed underground and will not
                                                       for a period in excess of three hours on any          be seen.
                                                       day of the year.




                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 38

Page 40

Division 13 — Driveways and Carparking Code
Table 8 Specific outcomes for the driveways and carparking code
                  Specific Outcomes                          Probable solutions (if code assessment)                                 Comments

 General
 O1     Vehicular access does not adversely impact         S1.1   Vehicular access is located and              Complies with O1
 on safety, capacity and operations of the existing or     designed in accordance with                         The proposed access from Jirrima Crescent to the
 planned road network, the proposed driveway,              AS/NZS2890.1:2004;                                  approved facility will be designed in accordance
 cycleways or pedestrian pathway systems.                                                                      with Australian Standards and the specifications of
                                                           AND                                                 a rural driveway as outlined in the standard
                                                                                                               drawing’s requirements.
                                                           S1.2    Only one footpath crossing is
                                                           provided23;

                                                           AND

                                                           S1.3     Driveways, have a maximum grade in
                                                           accordance with Council’s standard
                                                           requirements.
 O2     Driveways and crossovers—                          S2.1     Design of the driveway across the          S2.1 is not applicable
       are suitable and safe for their intended use; and   footpath is in accordance with Council’s            The proposed access driveway does not cross a
       match Council infrastructure.                       Standard Drawing requirements as appropriate        footpath.
                                                           for the particular type of development as
                                                           annotated on the drawings;                          Complies with S2.2
                                                           AND                                                 The proposed driveway will be constructed in
                                                                                                               accordance with Australian Standards and the
                                                           S2.2    Driveways are designed and                  specifications of a rural driveway as outlined in the
                                                           constructed in accordance with Council              standard drawing’s requirements.
                                                           Standard Drawing requirements , as
                                                           appropriate for the particular type of              Complies with S2.3
                                                           development as annotated on the drawings;           The proposed driveway will be constructed in
                                                           AND                                                 accordance with Australian Standards and the
                                                                                                               specifications of a rural driveway as outlined in the
                                                           S2.3   The change in grades in the                  standard drawing’s requirements.
                                                           driveways and ramps is in accordance with


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 39

Page 41

                 Specific Outcomes                         Probable solutions (if code assessment)                                      Comments

                                                         Council’s Standard Drawing requirements.
O3    In commercial zoned areas, the number of           S3.1    Design of multi-tenanted developments            O3 is not applicable
driveways across pedestrian footpaths is                 in commercial zoned areas include shared                 The proposed access and power route are not
minimised.                                               driveways and parking areas;                             located within a commercial zoned area.

                                                         AND

                                                         S3.2      Driveways are located so they abut
                                                         existing driveways of adjoining development
                                                         where practicable and reciprocal easements
                                                         are created to reduce
                                                         the sealed driveway width.
O4     Vehicular access does not adversely impact        S4.1      Footpath and kerb crossings are                Complies with S4.1
on the capacity, operations and maintenance of the       located clear of existing stormwater inlet               The footpath and kerb crossings are located clear
existing infrastructure;                                 structures, water and sewerage infrastructure            of existing infrastructure, landscaping and
                                                         fittings, any other exiting utility infrastructure,      vegetation.
AND                                                      existing landscaping and vegetation.
                                                                                                                  Complies with S5.1
O5     Vehicular access does not adversely impact        S5.1     Vehicular access avoids disturbance             Access to the proposed easement area will be
on the health and integrity of existing landscaping or   to the tree protection zone of trees on public           directly from the road and will not involve
native vegetation, where possible.                       land.                                                    disturbance to the tree protection zone.
O6     Driveway run-off is filtered prior to leaving     S6.1     For—                                            Complies with O6
the premises.                                                  Ancillary dwelling unit, Multiple housing          All driveway run-off will be absorbed by the
                                                               Type 2 if less than 5 carparking spaces,           surrounding grasses and vegetation.
                                                               Visitor accommodation Type 1 and Home-
                                                               based business Type 3—the driveway is
                                                               formed to drain to landscaped areas; and
                                                               for other uses—grease and oil arrestors or
                                                               stormwater quality improvement devices
                                                               are incorporated into the design to treat
                                                               run-off prior to run-off exiting from the
                                                               premises.




                                                                                             Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 40

Page 42

Table 9 Carparking and manoeuvring
                Specific Outcomes                        Probable solutions (if code assessment)                                    Comments

 Carpark design and layout
 O7       Sufficient carparking is provided to         S7.1     The number of parking and loading bays         O7 is not applicable
 accommodate the number and type of vehicles           is not less than the minimum number specified in        The proposal involves a new access and power
 likely to be generated by the development having      Table 14-51 Vehicle Parking Requirements;               installation to the approved facility. No carparking
 regard to the specifics of the use including—                                                                 is proposed.
        the type and intensity of land use;
      any existing parking available on the site;
      hours of operation;
      likely numbers of users;
      the peak parking demand periods of uses on
      the site; and
      the availability of alternative carparking.
 O8      The layout of the development provides        S8.1    Parking bays, manoeuvring areas,                O8 is not applicable
 adequate, clearly defined and easily                  queuing areas, loading, setdown and pickup              The proposal involves a new access and power
 accessible—                                           areas and driveways are designed to the                 installation to the approved facility. No
      on-site vehicle parking and manoeuvring          standards set out in the Australian Standards for       carparking is proposed.
      areas; and                                       Off-street Carparking and Off-street Commercial
      loading and manoeuvring areas for delivery       Vehicles Parking.
      and service vehicles.                            AND

                                                       S8.2    The number of loading bays is not less
                                                       than the minimum number specified in Table 14-
                                                       51.
 O9     Parking areas are located where they will      S9.1    Carparking areas are accessed from rear         O9 is not applicable
 not unduly conflict with pedestrians and will not     laneways where practicable.                             The proposal involves a new access and power
 dominate the streetscape.                                                                                     installation to the approved facility. No carparking
                                                                                                               is proposed.

 O10      Provision is made for a reasonable number    S10.1 Carparking spaces are provided for                O10 is not applicable
 of onsite carparking spaces identified and reserved   people with disabilities at the rate specified in the   The proposal involves a new access and power
 for people with disabilities.                         Australian Standards for Off-street                     installation to the approved facility. No carparking
                                                       Carparking.                                             is proposed.


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 41

Page 43

                Specific Outcomes                          Probable solutions (if code assessment)                                 Comments

O11     Access and egress points do not impact on        S11.1 Vehicle manoeuvring areas are provided         Complies with S11.1
the safety and operations of the road system.            in accordance with Australian Standards for Off-     Access to the road system from the proposed
                                                         street Carparking, so vehicles enter and leave       access track will be in accordance with the
                                                         the site in a forward gear.                          Australian Standards so vehicles can enter
                                                                                                              and leave the site in forward gear.
O12     Parking areas are designed to -                  S12.1 At locations where pedestrian and              O12 is not applicable
      provide a progressive reduction in speed           vehicle conflicts are likely to occur –              The proposal involves a change to the access track
      between the external road and internal parking
                                                  a)     sight distances of at least 2.5 seconds of travel    and power installation to the approved facility. No
      spaces;                                            time at the designated speed are provided;           carparking is proposed.
      ensure lower speeds near areas of high      b)     splayed corners on structures are incorporated;
      pedestrian activity through the use of      c)     landscaping is designed to allow clear views; and
      appropriate road geometry or devices        d)     sign placement ensures that sight distance
      designed to limit speed; and                       requirements are not impeded.
      maintain sight distances which are appropriate
      for the likely operating speeds in all areas of
      potential pedestrian/vehicle and vehicle/vehicle
      conflict.
O13      A clearly defined pedestrian network is         S13.1 In large open car parks with greater than      O13 is not applicable
provided that –                                          200 car parking spaces, a pedestrian path            The proposal involves a change to the access track
      is located in areas where people will choose to    between parking spaces is provided on every          and power installation to the approved facility. No
      walk;                                              second aisle.                                        carparking is proposed and no pedestrian pathways
      ensures that pedestrian movement through car                                                            will be required.
      parking areas or structures are along aisles
      rather than across them.
O14     Provision is made for pedestrian and             S14.1 No probable solution identified;               O14 is not applicable
vehicular queues at conflict points.                                                                          The proposal involves a change to the access track
                                                                                                              and power installation to the approved facility. No
                                                                                                              carparking is proposed.
O15      Parking areas are lit to provide security for   S15.1 Lighting is provided in accordance with        O15 is not applicable
night-time users.                                        the Australian Standard for Road Lighting -          The proposal involves a change to the access track
                                                         Vehicular Traffic (Category V) Lighting -            and power installation to the approved facility. No
                                                         Performance Installation and Design                  carparking is proposed.
                                                         Requirements.



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 42

Page 44

                Specific Outcomes                            Probable solutions (if code assessment)                                 Comments

O16     In mixed use areas of Business centres             S16.1 Resident carparking is limited to one          O16 is not applicable
residents do not compete with customers for                space per dwelling unit or accommodation unit;       The proposal involves a change to the access track
carparking spaces.                                                                                              and power installation to the approved facility. No
                                                           AND                                                  carparking is proposed. The subject site is not
                                                                                                                located in a mixed-use area.
                                                           S16.2 Resident carparking is not located in the
                                                           road reserve or between the residential or
                                                           business building and the principal street
                                                           frontage.
O17     Car parking areas are landscaped to—               No solution provided                                 O17 is not applicable
      provide shade;                                                                                            The proposal involves a change to the access track
      maximise infiltration of stormwater run-off;                                                              and power installation to the approved facility. No
                                                                                                                carparking is proposed.
      define parking areas;
      reduce direct visibility of car parking areas from
      external viewpoints; and
      soften views of hardstand areas.
O18     Development with the potential to                  No solution provided                                 O18 is not applicable
generate significant traffic and parking impacts                                                                The proposal involves a change to the access track
gives appropriate consideration to transport and                                                                and power installation to the approved facility. The
land use issues24.                                                                                              proposed changes will not result in an increase to
                                                                                                                traffic generation in the area.

Motor Cycles & Motor Scooters                              S19.1 For Commercial businesses,                     O19 is not applicable
O19     Designated Motor cycle or motor                    Entertainment & dining business, Industrial          The proposal involves a change to the access track
scooter parking spaces reduce the reliance on              business Types 1 and 2, Retail business Types        and power installation to the approved facility. No
cars.                                                      2, 4, 5, 6 and 7, Education Types 1 and 2, Open      carparking is proposed.
                                                           Space, Wellbeing Uses and Transport Types 1,
                                                           2, 3 and 4 motor cycle parking spaces accord
                                                           with Planning Scheme Policy PSP26 Motor Cycle
                                                           & Motor Scooter Parking.
O20      Carparks are designed to ensure run-off           S20.1 Grease and oil arrestors or stormwater         O20 is not applicable
is treated to remove pollutants prior to leaving           quality improvement devices                          The proposal involves a change to the access track
the premises.                                              are incorporated into the design to treat run-off    and power installation to the approved facility. No
                                                           prior to it leaving the premises.                    carparking is proposed.


                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 43

Page 45

                   Specific Outcomes                                    Probable solutions (if code assessment)                                         Comments

O21      Carparking areas are designed to ensure                     No solution provided                                          O21 is not applicable
drainage without the use of pumps or other                                                                                         The proposal involves a change to the access track
electrical apparatus.                                                                                                              and power installation to the approved facility. No
                                                                                                                                   carparking is proposed.

O22      Site layout and building design provides for                S22.1 Below ground components of buildings,                   O22 is not applicable
soft landscaping to be established.                                  including car parks, do not extend beyond the                 No landscaping is proposed along the proposed
                                                                     above ground footprint to allow for the provision             access and power installation to the approved
                                                                     of landscaping, particularly within building                  facility. However, landscaping around the approved
                                                                     setbacks.                                                     facility is proposed. An updated landscaping layout
                                                                                                                                   is provided in the Amended Proposal Plans.

Education Types 1, 2 or 3                                            S23.1 Paved setdown areas are provided within                 O23 is not applicable
O23       Carparking and setdown areas are                           the site;                                                     The proposal involves a change to the access track
designed and located to facilitate their safe and                                                                                  and power installation to the approved facility. No
efficient use.                                                       AND                                                           carparking is proposed.

                                                                     S23.2 For a minimum of 50% of carparking
                                                                     spaces, pedestrian access to buildings is not
                                                                     across or through driveways, carparks, setdown
                                                                     or manoeuvring areas;

                                                                     AND

                                                                     S23.3 Carparking and setdown areas are
                                                                     visible from off-site or signed.
 23 Justification for additional driveways may need to be supported by a detailed Traffic Study. See PSP 1 for details.

 24 PSP 1 details information Council may request, including a detailed Traffic Impact Assessment Report




                                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 44

Page 46

Division 14 — Earthworks Code
Table 10 Specific outcomes for the earthworks code
                 Specific Outcomes                                   Acceptable solutions                                         Comments
                                                             (if accepted development subject to
                                                                          requirements)
                                                                      Probable solutions
                                                                     (if code assessment)
 Effects of works
 Drainage                                              S1.1      The finished surface gradient of any       Complies with O1
 O1     Finished surface levels ensure land is free    filled or excavated area is within the range 0.5%    The proposed access to the approved facility will
 draining.                                             to 1.5% and drains to Council’s stormwater           be upgraded with an all-weather gravel finish. The
                                                       infrastructure where available or where              surface is considered to be semi-permeable and
                                                       stormwater infrastructure is not available,          therefore free draining.
                                                       toward the street.
 Hydraulics                                            No solution provided.                                Complies with O2
 O2    Any change to the level of the land does                                                             Minimal earthworks, involving the addition of gravel
 not have an adverse flooding impact on the flooding                                                        to create the proposed access, will not have an
 and drainage characteristics off-site.                                                                     adverse impact on the flooding and drainage
                                                                                                            characteristics of the site. The gravel surface will
                                                                                                            be semi-permeable and will not have a significant
                                                                                                            impact on flooding or drainage.

 Geotechnical considerations                           For assessable development—                          Complies with O3
 O3     Earthworks do not result in geotechnical       S3.1    Filling works are undertaken in              No significant earthworks are proposed. Only minor
 instability on the premises or nearby premises.       accordance with Section 2.8- Filling of Site of      earthworks are required to upgrade the proposed
                                                       Council’s PSP5 - Engineering Design                  access track to the approved facility with a gravel
                                                       Standards- Roads and Drainage & Earthworks           all-weather finish. The power installation to the
                                                                                                            approved facility will be minimal as power will be
                                                                                                            installed underground.
                                                       AND

                                                       S3.2   Where the filling is for residential
                                                       commercial or industrial purposes the works
                                                       comply with Australian Standard - Guidelines for
                                                       earthworks on commercial & residential


                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 45

Page 47

               Specific Outcomes                                   Acceptable solutions                                           Comments
                                                           (if accepted development subject to
                                                                         requirements)
                                                                     Probable solutions
                                                                    (if code assessment)
                                                      development.
Local amenity                                         S4.1     The following control measures are           Complies with O4
O4     Earthworks do not cause disturbance to the     implemented—                                          No significant earthworks are proposed. Only minor
amenity of the neighbouring land.                           regular water spraying of exposed areas to      earthworks are required to upgrade the proposed
                                                            suppress dust;                                  access track to the approved facility with a gravel
                                                            provision of dust stabilised or sealed          all-weather finish. The power installation to the
                                                            internal roads;                                 approved facility will be minimal as power will be
                                                                                                            installed underground.
                                                            protective covering of exposed areas that
                                                            are left for more than 2 weeks; and
                                                            if there is no valid development permit for
                                                            the site, disturbed areas are revegetated
                                                            using species identified in PSP3 -
                                                            Landscaping Plants and Guidelines;


                                                      AND

                                                      S4.2      Earthworks are undertaken only during
                                                      the hours of 7am to 6pm, Monday to Friday and
                                                      7am to 6pm on Saturday. No work is
                                                      undertaken on Sunday or public holidays.
Vegetative Waste                                      S5.1      Cleared vegetation is transported off-      Complies with S5.1
O5    Vegetation cleared from a development site is   site for disposal in an approved green waste          Cleared vegetation will be transported and
disposed of in an environmentally responsible         disposal facility;                                    disposed of prior to the completion of construction.
manner.
                                                      OR

                                                      S5.2   Cleared vegetation is mulched on-site
                                                      and reused for landscaping of the finished
                                                      development;

                                                      OR


                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 46

Page 48

                Specific Outcomes                                   Acceptable solutions                                            Comments
                                                            (if accepted development subject to
                                                                         requirements)
                                                                     Probable solutions
                                                                    (if code assessment)

                                                      S5.3     Cleared vegetation is disposed of for
                                                      the purpose of firewood. (Note: Disposal of
                                                      vegetative waste by burning off is not an
                                                      acceptable method of disposal).
Managing contamination risk                           S6.1     The fill material is solid clean earth, free   O6 is not applicable
O6    Materials used as fill are suitable for         of putrescible or refuse material, vegetation,          No fill materials are proposed. The proposed
development of the land and filling or excavation     acid sulfate soils, building or construction            access to the approved facility will involve the
works do not result in the contamination of land.     material or other material or contaminants;             laying of gravel to ensure all-weather access is
                                                                                                              achieved. There will be no risk in the contamination
                                                      AND                                                     of land.


                                                      S6.2      The site is not on the contaminated land
                                                      register.
Haulage activity and amenity                          No solution provided                                    O7 is not applicable
O7    Haulage of material to and from a site                                                                  No fill materials are proposed as part of the change
ensures—                                                                                                      application.
     minimal disturbance to neighbouring properties
     and properties along the haulage route; and
     Council’s road infrastructure including
     pavements is not adversely affected.
Extent of earthworks                                  S8.1     All earthworks, including cut and fill         O8 is not applicable
O8     Earthworks are contained within the subject    batters, retaining walls etc. are contained within      No cut or fill batters, or retaining walls are proposed
property.                                             the subject site.                                       as part of the change application to the existing
                                                                                                              approval.

Sloping sites                                         S9.1     Cut or fill is less than 2m in depth           O9 is not applicable
O9    On sloping sites, excavation or filling are     relative to the natural ground surface.                 The proposed access track is not on sloping land.
designed to maximise the use of natural slope and
minimise the need for cut and fill.



                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 47

Page 49

                Specific Outcomes                                 Acceptable solutions                                            Comments
                                                         (if accepted development subject to
                                                                       requirements)
                                                                   Probable solutions
                                                                  (if code assessment)
Environmental protection                             No solution provided.                                  Complies with O10
O10    Earthworks minimise any adverse impact                                                               The existing waterway crossing has been assessed
upon groundwater, watercourses, drainage lines,                                                             to determine its suitability to accommodate
wetlands, and native vegetation.                                                                            construction and maintenance vehicles to the site
                                                                                                            and it has been determined to be sufficient without
                                                                                                            the need for upgrade works, or additional
                                                                                                            earthworks surrounding the waterway.

Dams                                                 S11.1 Where the site is in the Rural Zone—             O11 is not applicable
O11    Dam location and construction does not             the land has a slope of less than 25%             The proposal does not involve a dam.
impact upon neighbouring properties in terms of—          (1:4); and
     hydrology;                                            the earthworks including cut and fill batters
     alteration of existing overland flowpaths and         and retaining walls are setback a minimum
     patterns;                                             of 50m from the property boundary; and
     landslide or failure of dam wall; and                 the size of the lot is greater than 5
     effluent disposal areas.                              hectares;

                                                     AND

                                                     S11.2 Where the site is in the Rural
                                                     Settlement Zone or the Rural Zone where the lot
                                                     is less than 5 hectares—
                                                            the land has a slope of less than 1:6; and
                                                           the earthworks including cut and fill batters
                                                           and retaining walls are setback a minimum
                                                           of 20m from the property boundary; and
                                                           involving less than 500m 3 of material;
                                                     AND

                                                     S11.3 For all other zones—
                                                     No solution provided.


                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 48

Page 50

Division 15 — Erosion and Sediment Control Code
Table 11 Specific outcomes for the erosion and sediment control code
                 Specific Outcomes                         Probable solutions (if code assessment)                                   Comments

 Effects of works
 Erosion and drainage control, sediment capture and      S1.2    Construction works are designed and           Complies with S1.1, S1.2, S1.3, S1.4 and S1.5
 stormwater runoff                                       managed to restrict the extent of clearing and        Construction of the proposed access track and
 O1     Development design, density, layout, and         soil exposure to that necessary for access, and       powerline installation for the approved facility will
 staging provide for erosion control, drainage control   safe construction;                                    involve minimal earthworks. Further, only minor
 and sediment capture and treatment during the                                                                 clearing and soil exposure will be required.
 construction phase.                                     AND                                                   Adequate sediment and erosion control, and
                                                                                                               stormwater management measures will be
                                                         S1.3     Clean stormwater is diverted or              implemented during construction.
                                                         managed around or through the site without
                                                         increasing the concentration of total suspended
                                                         solids or other contaminants in the flow and
                                                         without causing erosion (onsite or offsite);

                                                         AND

                                                         S1.4      Cleared areas are effectively stabilised
                                                         prior to rainfall if works are delayed or works are
                                                         not intended to occur immediately;

                                                         AND

                                                         S1.5     For buildings,
                                                                upstream runoff must be diverted around
                                                                the construction site; and
                                                                sediment barriers are provided downslope
                                                                of disturbed areas to prevent sediment
                                                                washing into gutters, drains and
                                                                watercourses either on or off the site; and




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 49

Page 51

                Specific Outcomes                        Probable solutions (if code assessment)                                  Comments

                                                            exposed soil and construction access must
                                                            be managed in accordance with
                                                            International Erosion Control Association
                                                            Best Practice Erosion and Sediment
                                                            Control (BPESC) 2008; and
                                                            temporary or permanent downpipes are
                                                            connected to the stormwater system
                                                            before laying the roof; or
                                                            localised erosion is avoided by directing
                                                            flow from downpipes over non-erosive
                                                            areas.
O2      Works in a watercourse                         S2.1     Work within waterways must be               O2 is not applicable
Construction activities within watercourses are        undertaken in accordance with Best Practice          The proposed access track will incorporate an
planned to prevent erosion, construction failure and   Erosion and Sediment Control, Appendix I –           existing waterway crossing that has been assessed
associated sedimentation.                              Instream works, Sections 14 and 16                   as being efficiently able to support construction and
                                                       International Erosion Control Association 2008.      maintenance vehicles to the approved facility. The
                                                                                                            power will be installed beneath the waterway via
                                                       S2.2     Temporary vehicular crossings of            under boring. No works are required within the
                                                       waterways must be designed and constructed to        waterway.
                                                       convey flows for the 50%AEP event and remain
                                                       stable for all rainfall events up to 10%AEP
                                                       event.




                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 50

Page 52

Division 16 — Existing Services Code
Table 12 Specific outcomes for the existing services code
                  Specific Outcomes                           Probable solutions (if code assessment)                                    Comment

 Setbacks and easements                                     S1.1     The footing of any structure or building      O1 is not applicable
 O1    Development near a sewer, water main,                is located clear of the zone of influence but no       The proposed access and power installation to the
 stormwater drain, overland flow path or                    closer than 1.5m (measured horizontally) from          approved facility are not located near a sewer,
 associated structure does not—                             infrastructure including sewers, water mains and       water main, stormwater drain, or overland flow path
      adversely affect the function of the service;         stormwater structures;                                 identified in O1. The proposed access and power
       place an additional load on the service; and                                                                installation to the approved facility are located on
                                                            AND                                                    rural properties containing natural features such as
       unduly increase future maintenance costs.                                                                   vegetation and a watercourse. Both are located
                                                            S1.2    No building or structure overhangs the         more than 20 m from these services located on or
                                                            zone of influence;                                     adjacent to the existing dwellings of the subject site
                                                            AND                                                    and access lot.

                                                            S1.3     Finished surface levels maintain a
                                                            minimum of 600mm of cover, but no greater
                                                            than 3m of cover to the underground
                                                            infrastructure;

                                                            AND

                                                            S1.4    If the existing surface level is altered,
                                                            surface level services including manholes and
                                                            inspection points are altered to match the new
                                                            surface level;

                                                            AND

                                                            S1.5   Alterations are constructed in
                                                            accordance with Section 4 of PSP5 –
                                                            Engineering Design Standards – Roads,
                                                            Drainage and Earthworks and applicable water
                                                            and sewerage design standards;



                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 51

Page 53

               Specific Outcomes                     Probable solutions (if code assessment)                                  Comment


                                                   OR

                                                   S1.6    Existing services are relocated, and the
                                                   design and construction of the relocated
                                                   services is in accordance with Section 4 of
                                                   PSP5 –Engineering Design Standards – Roads,
                                                   Drainage and Earthworks and applicable water
                                                   and sewerage design standards.
O2     Maintenance access is provided to all       S2.1    For trunk infrastructure a registered        O2 is not applicable
sewers, water mains, stormwater drains, overland   easement in favour of Council is created over all    The proposed access and power installation to the
flow paths and associated structures.              underground infrastructure located in private        approved facility does not involve the installation of
                                                   property;                                            trunk infrastructure and therefore does not require
                                                                                                        maintenance access to the listed infrastructure.
                                                   AND                                                  Additionally, the proposed access and power
                                                                                                        installation to the approved facility will not have an
                                                   S2.2    The width of the easement is the             impact on maintenance access to existing
                                                   greater of 3m or the width of the zone of            infrastructure.
                                                   influence;
                                                   AND

                                                   S2.3     The easement is centred over the
                                                   centreline of the infrastructure.




                                                                                   Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 52

Page 54

Division 17 — Landscaping Code
Table 13 Specific outcomes for the landscaping code
                 Specific Outcomes                           Acceptable solutions (if accepted                                     Comments
                                                           development subject to requirements)
                                                          Probable solutions (if code assessment)
 General requirements
 Streetscape and amenity                                  S1.1    Landscaped areas, not less than the         Complies with O1
 O1      Sufficient landscaped areas are                  minimum areas and dimensions specified in           A minor amendment to the approved landscaping
 provided to—                                             Tables 15 or 16, are provided and maintained;       plan is proposed to accommodate for the newly
       enhance the visual amenity and natural                                                                 proposed access to the approved facility. An
       landscape character of the area, streetscape       AND                                                 amendment to the approved landscaping plan is
       and local area;                                                                                        required as the access gate has been moved to
       retain natural landscape features, such as rock    S1.2    Landscaping is designed, planted and        align with the proposed access which is to be
       outcrops and existing large trees;                 maintained in accordance with PSP3                  received from the south. However, no landscaping
                                                          Landscaping Plants and Guidelines.                  is proposed along the proposed access or power
       retain existing native vegetation and enhance                                                          installation. The amended landscaping plan is
       buffer areas around property boundaries;                                                               provided in Appendix C and has been designed in
       suit the relative size and nature of the                                                               accordance with PSP3.
       development and its setting;
       reduce the visual impact of large or bulky
       structures and fencing along watercourses; and
       conceal service, carparking and loading areas
       of developments;
       screen incompatible land uses; and
       provide privacy between any dwelling units and
       accommodation units on and adjoining the site
       to a height and density appropriate to the scale
       of the development.




                                                                                         Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 53

Page 55

               Specific Outcomes                            Acceptable solutions (if accepted                                       Comments
                                                         development subject to requirements)
                                                        Probable solutions (if code assessment)
Building and landscape design                           S2.1     Below ground components of                    Complies with O2
O2      Site layout and building and landscape          buildings do not extend beyond the above               A minor amendment to the approved landscaping
design—                                                 ground footprint to allow for landscaping              plan is proposed to accommodate for the newly
      provides for soft landscaping to be established   particularly within building setback areas;            proposed access to the approved facility. An
      in and around the development;                                                                           amendment to the approved landscaping plan is
     maximises the retention of large canopy trees;     AND                                                    required as the access gate has been moved to
                                                                                                               align with the proposed access which is to be
     within the Eastern Beaches Locality and Noosa      S2.2   Basement carparks do not                        received from the south. However, no landscaping
     Heads Locality, avoids the removal of heath        encroach into building setback areas;                  is proposed along the proposed access or power
     vegetation, except where required for internal                                                            installation. The amended landscaping plan is
     roads and service and infrastructure               AND                                                    provided in Appendix C and has been designed in
     construction;                                                                                             accordance with PSP3.
     minimises the extent of impervious paved           S2.3     Plants are grouped in mulched beds
     areas;                                             rather than planted individually to provide for
     provides for suitable plant layouts and            optimum growing conditions and less
     densities;                                         maintenance;
     facilitates the adoption of appropriate planting   AND
     techniques; and
     considers on-going maintenance requirements        S2.4    These plants grouped in mulched
     to assure the establishment and ongoing            beds are not subject to any hedging
     survival of plantings.                             maintenance regimes;

                                                        AND

                                                        S2.5    Landscaping is designed, planted and
                                                        maintained in accordance with PSP3
                                                        Landscaping Plants and Guidelines;

                                                        AND

                                                        S2.6     Alternatives to impervious pavement
                                                        are provided and are located where
                                                        landscaping and existing vegetation will
                                                        benefit from increased infiltration of rainwater.


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 54

Page 56

               Specific Outcomes                             Acceptable solutions (if accepted                                       Comments
                                                           development subject to requirements)
                                                          Probable solutions (if code assessment)
Species selection                                                                                               Complies with O3
O3    Landscaped areas include plant species              S3.1      Plantings—                                  A minor amendment to the approved landscaping
that—                                                            comprise plant species identified for the      plan is proposed to accommodate for the newly
     are appropriate to the biophysical conditions               relevant landscape character area in PSP3      proposed access to the approved facility. An
     and landscape character of the area;                        Landscaping Plants and Guidelines; and         amendment to the approved landscaping plan is
     are suitable for the space available, the level of          avoid undesirable plant species identified     required as the access gate has been moved to
     visual and climatic exposure, the functional                in PSP3 Landscaping Plants and                 align with the proposed access which is to be
     requirements of the site and the scale of the               Guidelines;                                    received from the south. However, no landscaping
     development;                                                                                               is proposed along the proposed access or power
                                                                                                                installation. The amended landscaping plan is
     provide for appropriate levels of shade and          OR                                                    provided in Appendix C and has been designed in
     sunlight to occupants of the development                                                                   accordance with PSP3.
     throughout the year;                                 S3.2      For landscaping around pool areas—
     minimise the demand for water use;                          no more than 30% of the landscaped area
                                                                 is a mixture of plants of local origin and
     in road reserves, provide street trees with                 exotic plant species, provided none of the
     effective canopy shading having regard to the               plant species are undesirable plants
     size and scale of the road reserve and the                  identified in PSP3 Landscaping Plants and
     location of services and other structures;                  Guidelines; and
     for street trees in towns are villages, are                 palms are specifically located in group
     consistent with the existing streetscape                    plantings in accordance with PSP3
     character;                                                  Landscaping Plants and Guidelines;
     do not cause potential damage to buildings or
     structures;                                          AND
     are not harmful to pedestrians, particularly
     around schools, childcare centres, shopping          S3.3    Root guards are utilised around
     areas and other high pedestrian areas;               species with potentially invasive roots.
     in intensively used environments, can endure
     high levels of activity; and
     for rural residential developments, are best
     suited to less intensive maintenance and low
     availability of water for gardens.




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 55

Page 57

                Specific Outcomes                             Acceptable solutions (if accepted                                         Comments
                                                           development subject to requirements)
                                                          Probable solutions (if code assessment)
Safety and security                                       S4.1   No solution provided.                             Complies with O4, O5 and O6
O4     Landscaping is designed and located to                                                                      A minor amendment to the approved landscaping
maximise the safety and security of public and            Figure 4: Landscaping allows for adequate safe vision    plan is proposed to accommodate for the newly
private areas by—                                         at driveways and intersections
                                                                                                                   proposed access to the approved facility. An
      clearly defining the boundaries between private                                                              amendment to the approved landscaping plan is
      and public spaces;                                                                                           required as the access gate has been moved to
      promoting casual surveillance of buildings and                                                               align with the proposed access which is to be
      public areas from the street and other public                                                                received from the south. However, no landscaping
      areas for personal security reasons;                                                                         is proposed along the proposed access or power
                                                                                                                   installation. The amended landscaping plan is
      avoiding concealment spots; and                                                                              provided in Appendix C and has been designed in
      maintaining safe sight distances to and from                                                                 accordance with PSP3.
      road and building corners, carpark entrances
      and driveways (see Figure 4);
      maintain safe sight distances at planting bed
      ends within carparks;
      protecting solid fences from graffiti by            S5.1    Landscaping provided which allows
      incorporating elements such as landscaping,         adequate visibility for casual surveillance of
      creepers, murals or vandal resistant paint; and     public and semi-public spaces, including
                                                          entrances and exits to sites and buildings, by:
      separating and defining pedestrian and vehicle            planting trees which have clean trunks to a
      circulation routes.                                       height of at least 1.8 m; and
                                                                 appropriately spacing shrubs at 1.2m
O5       The provision of landscaping is to a                    horizontal centres, with a maximum height
satisfactory standard ensuring that it does not lead to          of 0.75m, to avoid clumping and to retain
opportunities for concealment and possible assault               sightlines.
sites.
                                                          S6.1     Street trees and trees in carparking
O6       Street trees and plantings in towns and          areas achieve a maximum of 900mm clear trunk
villages, carparks and other areas where potential        height for a 2.0m high tree at planting and are
conflicts with vehicles and pedestrians are evident,      able to attain a clear trunk height of 1900mm on
are planted so as to maximise vehicle and pedestrian      maturity;
safety.                                                   AND

                                                          S6.2     All scrub planting to be a maximum


                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 56

Page 58

                Specific Outcomes                         Acceptable solutions (if accepted                                       Comments
                                                        development subject to requirements)
                                                       Probable solutions (if code assessment)
                                                      height of 700mm from the road pavement (not
                                                      top of kerb).
                                                      S7.1      Plant species used in landscaping            Complies with O7
Services and utilities                                adjacent to substations, or adjacent to or on          A minor amendment to the approved landscaping
                                                      electricity transmission line easements, are less      plan is proposed to accommodate for the newly
O7       All landscaping works maintain adequate      than 4m high at maturity and do not encroach           proposed access to the approved facility. An
safe distance from services and utilities including   within 3m of a substation boundary;                    amendment to the approved landscaping plan is
substations, overhead powerlines, power poles and                                                            required as the access gate has been moved to
transformers, street lamps, stormwater catchment      OR                                                     align with the proposed access which is to be
pits, and underground services and utilities.                                                                received from the south. However, no landscaping
                                                      S7.2      For trees higher than 4m, trees are          is proposed along the proposed access or power
                                                      planted at a distance from any part of an              installation. The amended landscaping plan is
Figure 5                                              electricity transmission line at least equal to the    provided in Appendix C and has been designed in
                                                      expected height of the tree at maturity (see           accordance with PSP3.
                                                      Figure 5);

                                                      AND

                                                      S7.3     For power lines that connect to a
                                                      premises, the height of plant species at maturity
                                                      provides for a 2m clearance below the power
                                                      line; (see Figure 6)

Figure 6                                              AND

                                                      S7.4   Trees and large scrubs are located a
                                                      minimum of—
                                                           5m from electricity poles and pillars;
                                                            4m from street lamps;
                                                            2m from stormwater catchment pits; and
                                                            2m from underground services and
                                                            utilities; AND




                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 57

Page 59

                  Specific Outcomes                       Acceptable solutions (if accepted                                       Comments
                                                        development subject to requirements)
                                                       Probable solutions (if code assessment)
                                                           S7.5 Plants are located to enable
                                                           tradespersons to access, view and inspect
                                                           service meters, such as water and
                                                           electricity meters;

                                                       AND

                                                       S7.6     Root barriers are installed around trees
                                                       that are located within 3m of any infrastructures
                                                       or that have potentially invasive roots.
Landscaped entry statement                             S8.1     No solution provided.                        Complies with O8 and O9
O8      Tree and plant massing are the dominant                                                              A minor amendment to the approved landscaping
features of entry statements to residential or         S9.1     Landscaped entry statements are low          plan is proposed to accommodate for the newly
commercial estates and are integrated with the         maintenance and located entirely within               proposed access to the approved facility. An
landscape theme of the estate and the natural          privately-owned land.                                 amendment to the approved landscaping plan is
landscape character of the locality, rather than the                                                         required as the access gate has been moved to
entry being dominated by built elements such as                                                              align with the proposed access which is to be
masonry walls, waterfalls and assembled rock                                                                 received from the south. However, no landscaping
outcrops. (see Figure 7).                                                                                    is proposed along the proposed access or power
                                                                                                             installation. The amended landscaping plan is
O9      Entry statements are low maintenance.                                                                provided in Appendix C and has been designed in
                                                                                                             accordance with PSP3.
Figure 7: Typical estate entrance




                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 58

Page 60

                Specific Outcomes                             Acceptable solutions (if accepted                                     Comments
                                                           development subject to requirements)
                                                          Probable solutions (if code assessment)
Specific requirements for Multiple housing & Visitor Accommodation
Private open space                                        S10.1 For Multiple housing Types 2 and 4,            O10 is not applicable
O10      Private open space is—                           each dwelling unit provides for landscaped           The proposed access and power installation to the
      provided to all dwelling units and                  private open space comprising—                       approved facility does not involve the allocation of
      accommodation units;                                      for units at ground level, a minimum area      private open space for dwelling units.
      of adequate size and dimensions to suits the              of 25m2 exclusive of the clothes drying
      needs of occupants;                                       area, with minimum dimensions of 4m and
                                                                maximum gradient of 1 in 10 (10%); or
      clearly set apart for private use and separate
      from communal areas;                                      for units above ground level, a minimum
                                                                area of 12m2, with minimum dimensions of
      directly accessible from a living area of the unit;       2.5m; or
      located away from noise generating uses;                  if small dwelling units within the Business
     capable of receiving adequate sunlight; and               Centre Zone, a balcony not less than 1.5m
     designed to provide for the privacy of                    depth and with a minimum area of 4m2;
     occupants of the premises and adjoining
     premises.
                                                         AND

                                                         S10.2 For Multiple housing Types 2 and 4, the
                                                         private open space area at ground level is
                                                         enclosed by side and rear fencing, screening or
                                                         dense landscaping and the landscaping can
                                                         attain the equivalent of 60% of the height of the
                                                         building on maturity to protect the privacy of
                                                         residents;

                                                         OR

                                                         S10.3 For Visitor accommodation no solution
                                                         provided




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 59

Page 61

                Specific Outcomes                           Acceptable solutions (if accepted                                  Comments
                                                          development subject to requirements)
                                                         Probable solutions (if code assessment)
Communal open space                                      No solution provided                             O11 is not applicable
O11     Communal open space within the                                                                    The proposed access and power installation to the
development provides adequate area for children to                                                        approved facility does not involve the allocation of
play and for socialising, and preferably has a                                                            communal spaces for multiple housing & visitor
northern aspect.                                                                                          accommodation.

Screening & Mounding                                     No solution provided                             O12 is not applicable
O12      Planting is provided between units, adjacent                                                     The proposed access and power installation to the
to service and car parking areas and around the          Figure 8:                                        approved facility does not involve planting between
boundary of the site to provide for adequate                                                              units or planting adjacent to services and car park
screening. (see Figure 8).                                                                                spaces for multiple housing & visitor
                                                                                                          accommodation.
O13     Clothes drying areas and waste disposal
areas are screened from adjoining properties and                                                          O13 is not applicable
road frontages.                                                                                           The proposed access and power installation to the
                                                                                                          approved facility does not involve clothes drying
O14      Mounding adjacent to units do not extend                                                         areas or waste disposal areas for multiple housing
into service corridors, cover utility covers, obstruct                                                    & visitor accommodation.
overland stormwater flow, or cause ponding on
footpaths, verges or on adjoining private property.                                                       O14 is not applicable
                                                                                                          The proposed access and power installation to the
O15     Mounding associated with noise barriers is                                                        approved facility does not involve mounding
designed to avoid linear shapes and incorporates                                                          adjacent to units for multiple housing & visitor
undulating shapes and forms that vary in height                                                           accommodation.
and width.
                                                                                                          O15 is not applicable
                                                                                                          The proposed access and power installation to the
                                                                                                          approved facility does not involve mounding
                                                                                                          associated with noise barriers for multiple housing
                                                                                                          & visitor accommodation.




                                                                                     Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 60

Page 62

               Specific Outcomes                        Acceptable solutions (if accepted                                            Comments
                                                      development subject to requirements)
                                                     Probable solutions (if code assessment)
Streetscape character                                No solution provided                                       O16 and O17 are not applicable
O16      Landscaping complements and enhances                                                                   The proposed access and power installation to the
                                                     Figure 9: Lack of integration with street, unsuited to
the existing streetscape character by providing                                                                 approved facility does not involve landscaping for
                                                     scale of buildings
plantings that match the scale of buildings within                                                              multiple housing & visitor accommodation.
the street. (see Figure 9 and Figure 10).

O17     Where a podium is provided, planting is
established on the podium to soften the bulk and
appearance of the building, and species are used
that can tolerate difficult climatic conditions.
                                                     Figure 10: Continuation of streetscape, scale of
                                                     building and landscaping relate well




Passive solar access and energy efficiency           No solution provided                                       O18 is not applicable
O18      Plantings contribute to passive solar                                                                  The proposed access and power installation to the
access, energy efficiency and amenity by providing                                                              approved facility does not involve landscaping for
shade in summer, particularly to western walls and                                                              multiple housing & visitor accommodation.
open car parking areas, and admitting winter
sunlight to outdoor and
indoor living areas.




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 61

Page 63

                Specific Outcomes                            Acceptable solutions (if accepted                                           Comments
                                                           development subject to requirements)
                                                          Probable solutions (if code assessment)
Specific requirements for Business Use
Design of commercial and retail spaces                    No solution provided                                      O19 is not applicable
O19       Landscaping softens building bulk and                                                                     The proposed access and power installation to the
creates pleasant settings for visitors and staff that     Figure 11: Landscaping solutions that appear to           approved facility does not involve landscaping for
                                                          lessen the impact of building bulk
function well in an intensively used environment                                                                    business uses.
by—
      providing canopy trees and ancillary shade
      structures;
      using shrubs and garden beds to clearly define
      public spaces and pedestrian walkways;
      providing areas for public art, where
      appropriate;
                                                          Figure 12: Outdoor eating areas integrate well with the
      providing outdoor areas with seating for staff      streetscape
      and visitors;
      adopting landscape solutions that reduce the
      visual impact of building bulk (see Figure 11);
      using screen planting to conceal service and
      loading areas;
      making provision for outdoor dining areas
      where appropriate, that integrate well within the
      streetscape (see Figure 12);
      providing adequate screening along the
      perimeters of the development;
      avoiding the use of formal planting design for
      frontage works; and
      providing planting design and species selection
      that can endure an intensively used
      environment.




                                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 62

Page 64

               Specific Outcomes                            Acceptable solutions (if accepted                                           Comments
                                                          development subject to requirements)
                                                         Probable solutions (if code assessment)
Industrial Business                                      No solution provided                                      O20 is not applicable
O20      Landscaping within industrial                                                                             The proposed access and power installation to the
developments is designed to—                             Figure 13: Appropriate species at correct density and     approved facility does not involve landscaping for
                                                         height effectively screen bulky industrial buildings
     maximise retention of existing vegetation;                                                                    business uses.
     provide planting in mulched areas at entrances,
     along boundaries and around car parking and
     site facilities to provide screening and shading;
     lessen the impact of building bulk though the
     planting of vegetation that is in scale with the
     building, and by using mounding where
     appropriate (see Figure 13); and
     provide outdoor areas for staff.
Open space areas and road reserves
Active parkland                                          S21.1 Landscape works for active parkland                 O21 is not applicable
O21      Landscaping in and around active parkland       include—                                                  The proposed access and power installation to the
creates an environment that provides functional                formation of grassed and well-drained               approved facility does not involve landscaping in
recreation areas and facilities in a landscaped                areas for recreation;                               and around active parkland.
setting that reflect the natural landscape character           retention of existing vegetation surrounding
of the locality.                                               recreation facilities;
                                                               the planting of shade trees around
                                                               recreation facilities, including playfields
                                                               and playgrounds;
                                                               provision of landscaped buffer areas to
                                                               adjacent residential development; and
                                                               installation of recreational facilities that
                                                               include the use of natural materials and
                                                               finishes, where appropriate, and colours
                                                               that blend with the natural environment.




                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 63

Page 65

               Specific Outcomes                            Acceptable solutions (if accepted                                       Comments
                                                         development subject to requirements)
                                                        Probable solutions (if code assessment)
Passive parkland and reserves                           S22.1 Landscape works within passive                   O22 is not applicable
O22     Landscaping within passive parkland and         parkland and adjacent to national parks and            The proposed access and power installation to the
adjacent to national parks and conservation             conservation reserves, include—                        approved facility does not involve landscaping in
reserves, provides for—-                                      retention of existing vegetation of local        and around passive parkland.
      the protection and enhancement of native                origin, including understorey plants and
      wildlife habitat and corridors;                         surface mulch;
     the replanting of disturbed areas;                       revegetation of cleared and disturbed
     the protection of riparian zones where                   areas;
     the site adjoins or includes a watercourse;              planting food/habitat trees in areas
                                                              supporting important fauna populations and
     a relaxed and pleasant environment for visitors,         including nest
     with low key, low impact recreation facilities;
     and                                                      boxes where it has been necessary to
                                                              clear
     linkages to other open space areas, where
     appropriate.                                             habitat trees for development;
                                                              removal of species identified as
                                                              undesirable plant species in PSP3
                                                              Landscaping Plants and Guidelines;
                                                              enhancement of the area through the
                                                              provision of walking trails, picnic tables and
                                                              bridges;
                                                              the provision of linkages to the Noosa Trial
                                                              Network as identified in Schedule 5 on
                                                              Map 3, where appropriate;
                                                              retention of natural ground levels and
                                                              hydrology within and around these areas;
                                                              and
                                                              minimal grassed areas.




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 64

Page 66

               Specific Outcomes                                 Acceptable solutions (if accepted                                       Comments
                                                              development subject to requirements)
                                                             Probable solutions (if code assessment)
Road reserves                                                S23.1 A minimum of 1 street tree is provided           O23 is not applicable
O23    Landscaping within road reserves—                     per lot or every 8m of frontage, whichever is the      The proposed access and power installation to the
     enhances the streetscape quality and natural            greater;                                               approved facility does not involve landscaping
     landscape character of the area;                                                                               within a road reserve.
     provides buffering to adjoining uses;                   AND
     maintains the functionality of the road reserve         S23.2 Where vehicles are parked parallel to
     for vehicles, pedestrian and bicycles, including        the kerb, landscaping is setback a minimum of
     providing adequate allowance for pedestrians to         500mm from the back of the kerb to allow
     use the verge;                                          adequate access (see Figure 14);
     provides for the retention of existing tall trees and
     remnant native vegetation;                              AND
     allows for the opening of car doors along urban
     streets;                                                S23.3 Street trees are planted a minimum of
                                                             1m from the back of the kerb in the road
     allows for maintenance or emergency access to           reserve verge.
     service corridors and utilities;
     maintains site distances to and from corners,           Figure 14: Allow 500mm for passenger Access
     intersections, driveways and pedestrian crossing
     points; and
     maintains overland stormwater flow to avoid
     ponding on footpaths, nature strips or adjoining
     premises.




                                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 65

Page 67

               Specific Outcomes                          Acceptable solutions (if accepted                                  Comments
                                                        development subject to requirements)
                                                       Probable solutions (if code assessment)
Environment protection and conservation
Watercourses and drainage lines                        No solution provided.                            O24 is not applicable
O24     Landscaping works along watercourses                                                            The proposed access and power installation to the
and drainage lines—                                                                                     approved facility does not involve landscaping
     retains and enhances the existing riparian                                                         along watercourses and drainage lines.
     vegetation including understorey; and
     rehabilitates and revegetates degraded riparian
     zones to filter stormwater run-off and provide
     for native wildlife habitat; and
     avoids slashing and turfing of watercourse
     edges and drainage lines; and
     avoids engineering design solutions, such as
     concrete drains; and
     use natural materials in the construction of
     boardwalks, bridges and similar structures to
     blend with the natural environment.




                                                                                   Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 66

Page 68

Division 18 — Transport, Roads and Drainage Code
Table 14 Strategic transport network
                  Specific Outcomes                         Probable solutions (if code assessment)                                   Comment

 Strategic Transport Network
 O1    Traffic generation from the development is        S1.1     Where the development leads to the need       O1 is not applicable
 considered in a localised and a Shire wide context to   to increase transport infrastructure in the Shire,     The proposal does not require an increase in
 ensure that—                                            the development contributes to the transport           transport infrastructure. The proposed access
      the transport network has the capacity to safely   network in accordance with the requirements of         easement and power installation to the approved
      and efficiently accommodate projected              the applicable infrastructure charging instrument      facility is for construction and maintenance only.
      movements; and/or                                  and the Priority Infrastructure Plan in accordance     Maintenance is generally required 3-4 times
       the development includes measures to upgrade      with legislation.                                      annually.
       the transport network to meet the imposed
       demands.                                          Editor’s note:
                                                         Council may for some development require the
                                                         preparation of a Transport Impact Assessment
                                                         Report. Planning Scheme Policy PSP1 details
                                                         matters to be addressed in the Report.
 O2    The street network has high street                S2.1      Road planning and development design         O2 is not applicable
 connectivity, both within the development and to the    facilitates as many pedestrian and cycle               No changes to the street network are proposed.
 surrounding local area.                                 movements as possible and provides for future
                                                         connectivity and integration with adjoining sites;

                                                         AND

                                                         S2.2   Arterial and sub-arterial roads are
                                                         designed so they can operate with acceptable
                                                         volumes of traffic during peak times;

                                                         AND

                                                         S2.3    Collector and local streets are provided to
                                                         support short trips for local traffic moving in and
                                                         between neighbourhoods. Local traffic is
                                                         channelled towards collector streets to ensure


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 67

Page 69

Specific Outcomes      Probable solutions (if code assessment)                                    Comment

                    that traffic volumes on local street are kept low;

                    AND

                    S2.4    Collector and local streets are designed
                    to discourage through traffic;

                    AND

                    S2.5     A collector street is provided parallel to
                    arterials particularly where they pass through town
                    centres;

                    AND

                    S2.6    Appropriate width of road and verge is
                    provided to allow streets to perform their
                    designated functions in the street network;

                    AND

                    S2.7     A network of local streets focused
                    towards an activity centre or school is provided
                    for safe and efficient pedestrian and bike access
                    to the school, safe conditions for school buses,
                    setdown facilities, with on-site parking where
                    practical;

                    AND

                    S2.8     Passive surveillance is maximised by
                    designing streets to enable development to front
                    all streets and roads, including arterials;

                    AND




                                                      Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 68

Page 70

                Specific Outcomes                         Probable solutions (if code assessment)                                  Comment

                                                       S2.9      Streets near Public Passenger Transport
                                                       facilities are orientated to optimise the walkable
                                                       catchments within 800 metres walking distance;

                                                       AND

                                                       S2.10 The street network has no more than
                                                       15% of lots fronting cul-de-sacs. The maximum
                                                       cul-de-sac length is 120 metres;

                                                       AND

                                                       S2.11 Street stubs to adjacent future
                                                       development areas are provided at spacings of
                                                       200 m or closer to enable future street
                                                       connections to be made;

                                                       AND

                                                       S2.12 Street block lengths are not more than
                                                       240 m long, and predominantly around 150-180m
                                                       long. Street block lengths are generally shorter
                                                       closer to town and neighbourhood centres;

                                                       AND

                                                       S2.13 Direct, safe and attractive pedestrian and
                                                       cycle routes are provided within and through the
                                                       development and connect to bus stops.
O3    Development is designed –                        S3.1    Higher density development is                 O3 is not applicable
     To encourage travel by community transport,       concentrated along public transport Routes;           The proposal is not for a community use and is
     walking and cycling rather than by private car;                                                         not accessible to the public.
     and                                               AND
     To maximise accessibility via existing and
     planned community transport facilities            S3.2   There is provision for bus routes through
                                                       development sites;


                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 69

Page 71

Specific Outcomes      Probable solutions (if code assessment)                                  Comment


                    AND

                    S3.3      Bus routes are located to maximise
                    patronage catchment and to consider personal
                    safety, lighting and traffic management;

                    AND

                    S3.4    At least 90% of all residents are located
                    within 400 metres of an existing or planned bus
                    route;

                    AND

                    S3.5    Pedestrian and cycle movement is
                    provided within local streets to and through
                    development;

                    AND

                    S3.6   Attractive and safe pedestrian and cycle
                    connections are provided with shade trees,
                    graded walking and cycle paths and lighting;

                    AND

                    S3.7    Buildings and pedestrian entrances are
                    oriented to the street;

                    AND

                    S3.8    Pathways have ramps at all kerb corners
                    for wheelchair and pram access;

                    AND


                                                    Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 70

Page 72

Specific Outcomes      Probable solutions (if code assessment)                                  Comment


                    S3.9    Every development has convenient and
                    prominent pedestrian entrances that cater for all
                    pedestrians including older people, children and
                    the mobility and vision impaired;

                    AND

                    S3.10 Expanses of ground level blank walls
                    along street frontages, and large driveways and
                    entrances to carparks are avoided;

                    AND

                    S3.11 Bus routes are not be located away from
                    activity centres;

                    AND

                    S3.12 Facilities for boarding and exiting
                    community transport facilities are incorporated
                    into developments;

                    AND

                    S3.13 Pedestrian and cycle routes within or
                    adjacent to the development are overlooked by
                    adjoining buildings, make use of views and
                    attractive sights, have lighting and are
                    signposted;

                    AND

                    S3.14 Suitable car restraint measures are
                    adopted within the development such as lower
                    speed limits or traffic calming measures to


                                                    Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 71

Page 73

                Specific Outcomes                          Probable solutions (if code assessment)                                    Comment

                                                        support greater pedestrian and cycle movement;

                                                        AND

                                                        S3.15 Traffic management devices on potential
                                                        bus routes are provided in accordance with the
                                                        accepted development subject to requirements
                                                        code for undertaking road works on local
                                                        government roads, under the Transport Planning
                                                        and Coordination Regulation 2005;

                                                        AND

                                                        S3.16 Streets identified as potential bus routes
                                                        are—
                                                               collector streets and sub-arterial/arterial
                                                               roads which provide highly accessible and
                                                               relatively direct routes wherever practical;
                                                               those that provide for the shortest and most
                                                               direct route for an efficient public transport
                                                               service; and
                                                               those that can efficiently service adjoining
                                                               development areas.
O4     Development access does not compromise           No solution provided.                                   Complies with O4
the functions of particular roads as indicated in the                                                           The proposed access easement is located off a
road hierarchy, and does not adversely impact on the                                                            local road and is to be used for construction and
safety, capacity and operations of the road system.                                                             maintenance purposes only. It is not anticipated
                                                                                                                that the existing road will be compromised during
                                                                                                                construction or during irregular maintenance
                                                                                                                visits.




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 72

Page 74

                     Specific Outcomes                          Probable solutions (if code assessment)                                  Comment

Pedestrian and Cycle Path Infrastructure
O5     Pedestrian and cycle path infrastructure is           S5.1      Consideration is given to existing and      O5 is not applicable
provided –                                                   future pathway linkages and pathways link to          The proposal is not for a community use and is
      to form an integrated component of the                 the Local and Regional Cycle Network and to the       not accessible to the public. No linkages to
      movement network and the open space                    Priority Infrastructure Plan in Part 15.              pathways for pedestrian or bicycle use are
      system;                                                                                                      proposed.
          to encourage walking and cycling;                  S5.2    Direct and accessible linkages are
                                                             provided into the site.
          to add variety and visual interest;
          to conserve street trees, vegetation and other     S5.3    Pathway and landscape works are
          significant features;                              provided to a high standard to Council
          to allow equitable access to public areas and      specifications and assessed for compliance with
          community facilities;                              local government cycling facility design
                                                             standards.
          with adequate lighting where subject to high
          night time usage;                                  S5.4    Pathways are provided to cater for shared
          in locations where there is casual surveillance;   use and cater for both commuting and
          or widened at potential conflict points;           recreational usage and exceed minimum
                                                             standards.
          to incorporate—
    i.      street tree planting to enhance the
            streetscape;
    ii.     directional signage that is visible under all
            conditions.
O6    Pedestrian and cycle path infrastructure is            S6.1     Pedestrian and cycle path infrastructure     O6 is not applicable
designed and constructed to –                                is designed and constructed –                         The proposal is not for a community use and is
     provide a stable, smooth surface, including                   in accordance with AUSTROADS;                   not accessible to the public. No cycle ways or
     across driveways, sections and joins;                        to comply with local government design           pathways are proposed.
          be easily maintained;                                   standards;
          a width and longitudinal gradient to cater for          to have navigational signs in accordance
          projected usage, including nearby—                      with Council ‘Wayfinding’ signage
    i.      high activity nodes;                                  specifications; and
    ii.     public transport;                                     to incorporate –



                                                                                             Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 73

Page 75

                     Specific Outcomes                    Probable solutions (if code assessment)                                     Comment

     iii. centres;                                         i.    kerb ramps at all intersections and
      provide clear sight-lines for safe use; and                designated crossings;
      be free of any obstructions such as fences,          ii.   refuge islands on all roads with median
      signage and bollards.                                      strips; and
                                                           iii. holding rails for cyclists at the intersection
                                                                of trunk collector, sub- arterial and arterial
                                                                roads that are positioned in accordance
                                                                with –
                                                                 A. Australian Standard 1742.9: 2000 -
                                                                    Manual of Uniform Traffic Control
                                                                    Devices - Bicycle Facilities; and
                                                                 B. AUSTROADS Part 14 - Bicycles -
                                                                    Section 9; and
                                                                 C. AUSTROADS Part 13 – Pedestrians.
                                                       Editor’s note:
                                                       All pathways are considered shared use
                                                       pathways, which Cyclists can legally use, unless
                                                       bicycles are specifically prohibited through signs
                                                       or markings (such as in town centres).


Table 15 Roads and drainage
                 Specific Outcomes                        Probable solutions (if code assessment)                                     Comments

 Road and drainage design and construction
 O7      Roads and pedestrian and cycle paths are      S7.1    Road planning and design supports the             O7 is not applicable
 planned and designed to support the hierarchy         hierarchy and functional aspects identified in            The proposal is not for a community use and is
 and functional aspects identified in Sections 2 and   Sections 2 and 3 of PSP5 Engineering Design               not accessible to the public. No roads, cycle ways
 3 of PSP5 Engineering Design Standards – Roads,       Standards – Roads, Drainage and Earthworks;               or pathways are proposed.
 Drainage and Earthworks and to ensure that—
       design and alignment of the roads,              AND
       intersections and all associated works—
                                                       S7.2      Road and pathway planning and design is


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 74

Page 76

               Specific Outcomes                            Probable solutions (if code assessment)                                   Comments

i.      provides a safe environment for all users;       in accordance with, in order of precedence—
ii.     is adequate for the design speed                       Noosa Integrated Local Transport Plan;
        environment;                                           Queensland Transport’s Shaping Up;
iii. is adequate for predicted traffic volumes; and            Queensland Design Code for Residential
iv. maintains the safe and efficient functioning of            Streets;
    the road network without the use of traffic                AUSTROADS Guide to Traffic Engineering
    signals;                                                   Practice;
v.      is compatible with existing roads;                     Sections 2 and 3 of PSP5 Engineering
vi. is easily maintained by Council equipment;                 Design Standards – Roads, Drainage and
    and                                                        Earthworks; or
vii. where appropriate, has the ability to                     the Noosa Cycling and Walking Network
     accommodate public transport services;                    Development Plan; OR
      road pavement surfaces—                                  A combination of the principles in these
                                                               documents.
i.      are durable enough to carry estimated wheel
        loads of travelling and parked vehicles;
                                                         AND
ii.     provide for the safe passage of vehicles,
        pedestrians, cyclists, and discharge of          S7.3    On-road cycling treatment is utilised to
        stormwater run-off from contributing             provide safe and continuous movement of cyclists
        catchments and the preservation of all-          along a roadway, such as--
        weather access;                                        sealed shoulders;
      kerb and channel—                                        wide kerbside lane;
i.      controls vehicle movement by delineating the           exclusive or peak period bicycle lane;
        carriageway for all users;
                                                               advisory treatments such as Bicycle
ii.     conveys road pavement run-off to                       Awareness Zone;
        stormwater drainage in a manner that allows
        the road to be trafficable in Q100 ARI local           shared parking / bicycle lane;
        rainfall events; and                                   contra flow bicycle lane; and
      verges and footpaths provide—                            bus/bicycle lane.
i.      safe access for pedestrians and cyclists clear
        of obstructions;                                 S7.4    The provision of bicycle lanes at
                                                         intersections is generally in accordance with


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 75

Page 77

                   Specific Outcomes                          Probable solutions (if code assessment)                                  Comments

   ii.     an access area for vehicles onto properties;    AUSTROADS Part 14, section 5 and the Manual
   iii. a corridor allocated for services and utilities;   of Urban Traffic Control Devices (MUTCD) Part 9.
        and
   iv. additional amenity for minor roads.
O8    Stormwater drainage infrastructure is                S8.1   Stormwater drainage planning, design           O8 is not applicable
planned, designed and constructed to—                      and construction is in accordance with Section 4      The proposed access and power installation for
     be accessible, cost effective and easily              of PSP5 Engineering Design Standards – Roads,         the approved facility will not provide any
     maintainable;                                         Drainage and Earthworks;                              significant impact to stormwater drainage. No
         protect downstream capacity;                                                                            stormwater drainage infrastructure is proposed.
                                                           AND                                                   The proposed access will be over an existing dirt
         protect downstream water quality;                                                                       track through the subject lot, and for this change
         maximise on-site stormwater retention and         S8.2   As Constructed data is submitted in            application, will be upgraded to an all-weather
         retardation; and                                  accordance with Section 6 of PSP5 Engineering         gravel track. The gravel surface will be semi-
         convey run-off to stormwater drainage in a        Design Standards – Roads, Drainage and                permeable and will not have a significant impact
         manner that allows roads to be trafficable in     Earthworks;                                           on flooding or drainage.
         Q100 ARI local rainfall events.
                                                           AND

                                                           S8.3     Stormwater drainage planning, design
                                                           and construction is in accordance with the
                                                           Queensland Urban Drainage Design Manual.
O9      Roads and stormwater drainage                      S9.1 Roads and stormwater drainage                    O9 is not applicable
infrastructure is constructed—                             infrastructure is constructed in accordance with—     No stormwater drainage infrastructure is
      in accordance with appropriate engineering                 Sections 2, 3 and 4 of PSP5 Engineering         proposed. The proposed access is to be an all-
      standards; and                                             Design Standards – Roads, Drainage and          weather gravel track. The gravel surface will be
         to minimise adverse environmental impacts,              Earthworks;                                     semi-permeable and will not have a significant
         including from run-off and erosion.                     Queensland Design Code for Residential          impact on flooding or drainage.
                                                                 Streets;
                                                                 AUSTROADS; or
                                                                 A combination of the principles in these
                                                                 documents;

                                                           AND



                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 76

Page 78

               Specific Outcomes                          Probable solutions (if code assessment)                                      Comments


                                                       S9.2     Erosion and sediment control measures
                                                       are designed and implemented in accordance
                                                       with the Institution of Engineers Australia
                                                       (Queensland Division) Soil Erosion and Sediment
                                                       Control - Guidelines for Queensland Construction
                                                       Sites.
Environmental Protection                               S10.1 Roads and stormwater drainage follow                O10 is not applicable
O10 Roads and stormwater drainage infrastructure       the edge of existing disturbed areas, or                  No stormwater draining infrastructure is
are located and aligned so as to—                      alternatively, these works are co-located within a        proposed. The proposed access is to be an all-
      minimise disturbance to native vegetation        combined utility corridor;                                weather gravel track. The gravel surface will be
      and/or other habitat areas;                                                                                semi-permeable and will not have a significant
     protect and maintain wildlife corridor            AND                                                       impact on flooding or drainage. The proposed
     movements and the safety of native fauna;                                                                   upgrade will not provide any significant impact to
                                                       S10.2 Roads avoid native vegetation and                   existing native vegetation, wildlife corridors,
     minimise changes to the hydrological regime,      provide for fauna underpasses and associated              hydrological regimes, or watercourses, and will
     including drainage patterns, run-off and water    fencing where appropriate;                                require minimal earthworks.
     quality;
     avoid crossing watercourses, drainage lines       AND
     and wetlands, but where such crossings are
     unavoidable, disturbed areas are reinstated and   S10.3 Road infrastructure within or adjacent to
     revegetated on completion of works; and           native habitat incorporates fences which allow for
     minimise bulk earthworks.                         protected wildlife movement and controls
                                                       unrestricted access of domestic cats and dogs;
                                                       AND

                                                       S10.4 Native vegetation is protected from
                                                       clearing or construction activities by—
                                                             clearly marking vegetation to be retained
                                                             with flagging tap;
                                                             installing protective fencing around the
                                                             dripline of vegetation; and




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 77

Page 79

                Specific Outcomes                        Probable solutions (if code assessment)                                  Comments

                                                            ensuring stock piling, storage and vehicle
                                                            parking occur outside the areas of
                                                            vegetation to be retained;
                                                      AND

                                                      S10.5 Low impact construction techniques are
                                                      used around areas of vegetation to be retained to
                                                      minimise interference with the vegetation.
O11      Roads and stormwater drainage                No solution provided                                  O11 is not applicable
infrastructure is proven to be suitable for its use                                                         No stormwater draining infrastructure is
prior to Council accepting the dedicated asset.                                                             proposed. The proposed access is to be an all-
                                                                                                            weather gravel track. The gravel surface will be
                                                                                                            semi-permeable and will not have a significant
                                                                                                            impact on flooding or drainage.

O12      Alignment of stormwater drainage             S12.1 The location, design and construction of        O12 is not applicable
infrastructure is to allow for easy access for the    stormwater drainage structures is in accordance       No stormwater draining infrastructure is
ongoing maintenance by Council.                       with Sections 4 and 5 of PSP5, Engineering            proposed. The proposed access is to be an all-
                                                      Design Standards - Roads, Drainage and                weather gravel track. The proposed upgrade will
                                                      Earthworks;                                           not provide any significant impact to stormwater
                                                                                                            drainage
                                                      AND

                                                      S12.2 Where infrastructure is located on private
                                                      land an easement is dedicated over the
                                                      infrastructure in accordance with Section 4 of
                                                      PSP 5, Engineering Design Standards – Roads,
                                                      Drainage and Earthworks.




                                                                                      Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 78

Page 80

                Specific Outcomes                       Probable solutions (if code assessment)                                     Comments

Frontage works
O13      Development is provided with external       S13.1 The following infrastructure components            O13 is not applicable
roadworks along the full extent of the frontage of   already exist at the frontage of the site or are         No roadworks are proposed.
the site to an appropriate standard having regard    provided at the developer’s expense—
to the specified function of the road.                     full width sealed road;
                                                           concrete kerb and channel where
                                                           appropriate;
                                                           forming and grading to footpaths;
                                                           vehicular kerb and footpath crossings;
                                                           a constructed bikeway;
                                                           a constructed footpath;
                                                           a constructed carriageway;
                                                           required alterations to public utility mains,
                                                           services or installations;
                                                           construction of any required alterations to
                                                           public utility mains, services or installations;
                                                           stormwater drainage works; and
                                                           installation of electrical conduits;
                                                     AND


                                                     S13.2 Road and drainage design and
                                                     construction is in accordance with Sections 3 and
                                                     4 of PSP5 Engineering Design Standards –
                                                     Roads, Drainage and Earthworks.




                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 79

Page 81

                Specific Outcomes                          Probable solutions (if code assessment)                                 Comments

Road and rail corridors
O14     Noise sensitive uses including residential    S14.1 Noise sensitive uses including residential       O14 is not applicable
uses are not subjected to high traffic noise levels   uses are separated by a minimum of—                    The proposal does not involve any roadworks
from the major road network or rail corridors.             40m from the property boundary of roads           near noise sensitive uses.
                                                           within the major road network; and
                                                             80m from the property boundary of rail
                                                             corridors;

                                                      OR

                                                      S14.2 Development in the vicinity of road
                                                      corridors meets the following external design
                                                      criteria for roads in the major road network—
                                                             54dB(A)L10 (18hours) based on predicted
                                                             traffic volumes ten years hence;
                                                      AND

                                                      S14.3 Development in the vicinity of rail
                                                      corridors meets the following external design level
                                                      noise criteria—
                                                            65dB(a), assessed as the 24hour average
                                                            equivalent continuous A- weighted sound
                                                            pressure level; and
                                                             87dB(A), assessed as a single event
                                                             maximum sound pressure level.




                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 80

Page 82

               Specific Outcomes                           Probable solutions (if code assessment)                                  Comments

Staged development
O15     Staged development is planned, designed         No solution provided.                                 O15 is not applicable
and constructed to ensure that—                                                                               No staged development is proposed.
     each stage of the development can be
     constructed without interruption to services and
     utilities provided to the previous stages;
     the infrastructure provided is capable of
     servicing the entire development; and
     the materials used are consistent throughout
     the development.
Alterations to services and utilities
O16     Any alterations or repairs to infrastructure    S16.1 Any alterations or repair to infrastructure     Complies with O16
as a result of the development are made at no cost      as a result of the development are completed at the   While the proposal is located on private property,
to Council.                                             developer’s expense.                                  any alterations or repairs to Council infrastructure
                                                                                                              will be made by the applicant if required.




                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 81

Page 83

Division 19 — Waste Management Code
Table 16 Waste management code
                Specific Outcomes                       Probable solutions (if code assessment)                                   Comments

 Waste separation                                      S1.1    Construction, operational and                O1 is not applicable
 O1      Development that generates several            demolition works are planned and managed in          The proposal will not generate waste requiring
 classes of waste is designed so waste is              accordance PSP1127;                                  disposal.
 collected, stored and disposed of in a safe and
 ecologically sustainable manner26.                    AND                                                  O2 is not applicable
                                                                                                            The proposal will not generate waste requiring
 O2    Waste storage areas provide for adequate        S1.2 Adequate area is provided for on-site           disposal. No waste storage areas are required.
 separation of all recyclable and non-recyclable       for the collection and separate storage of
 materials.                                            recyclable, non-recyclable, vegetative and
                                                       hazardous materials in their specific waste
                                                       streams during construction, operational and
                                                       demolition works;

                                                       AND

                                                       S2.1 Waste storage areas allow for the
                                                       separate storage of different waste materials
                                                       for reuse or recycling by—
                                                             providing sufficient area to store all
                                                             recyclable material and recycling
                                                             containers required; and
                                                             sign posting the types of waste stored.
 Design and location of waste storage areas            S3.1 Waste storage areas are designed                O3, O4, O5 and O6 are not applicable
 O3     Waste storage areas are located so that they   and maintained in accordance with PSP 9;             The proposal will not generate waste requiring
 are convenient and safe to use and provide for                                                             disposal. No waste storage areas are required.
 convenient and safe collection by service vehicles;   AND

 AND                                                   S3.2 Waste storage areas are designed
                                                       and located so they—
 O4     The location and methods of waste                   are easily accessed and convenient to use;
 storage minimises any adverse impacts on


                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 82

Page 84

                Specific Outcomes                        Probable solutions (if code assessment)                                      Comments

adjoining or nearby properties;                                have unobstructed access for the
                                                               collection of the waste by service vehicles;
AND
                                                               provide for sufficient space for safe entry
O5     Waste storage areas are designed for                    and exit and servicing by Council’s
ease of maintenance and ease of access for                     contractor without the need for manual
cleaning;                                                      handling;
                                                               are clear of carparking bays, loading bays
AND                                                            and similar areas;
                                                               are clear of footpaths and pedestrian
O6    Waste storage areas provide a safe and
                                                               access;
secure environment for users through–
     appropriate siting and access;                            are capable of being serviced by the
                                                               collection vehicle without impeding traffic
      the provision of lighting; and
                                                               flow; and
      restricting access to the general public by
                                                               have a level area provided for the storage
      making the area clearly identifiable as private
                                                               of waste and recyclable materials in
      space (e.g. through landscaping,
                                                               standard waste containers;
      change of paving material or fencing, rather
                                                        AND
      than locking the area.
                                                        S3.3 For uses that do not comprise a
                                                        caretaker’s residence or central management,
                                                        the maximum distance between waste storage
                                                        areas and the kerbside is—
                                                              for Multiple housing Type 3 – 40 m; or
                                                               for other uses – 70 m; and

                                                        S3.4 Pathways used to transport bins—
                                                             have a maximum grade of 1:15; and
                                                               are free of steps, stairs or other
                                                               impediments;

                                                        AND
                                                        S4.1     Waste storage areas are—




                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 83

Page 85

               Specific Outcomes                     Probable solutions (if code assessment)                                     Comments

                                                           integrated with the building design, where
                                                           possible;
                                                           setback a minimum of 2 m from side and
                                                           rear property boundaries;
                                                           screened so that bins are not visible from
                                                           neighbouring properties or passing
                                                           vehicular and pedestrian traffic; and
                                                           not located directly adjacent to dwelling
                                                           units on the site on neighbouring
                                                           properties;
                                                    AND

                                                    S5.1    Waste storage areas are constructed
                                                    of impermeable, durable and non-textured
                                                    materials and surfaces so that they are easily
                                                    cleaned;

                                                    AND

                                                    S5.2    A minimum distance of 0.5 m2
                                                    distance is provided between and around
                                                    waste storage bins to allow for manoeuvring
                                                    and washing of bins.

                                                    AND

                                                    S6.1      No solution provided.
Water management for waste storage areas            S7.1      The waste storage area —                     O7 is not applicable
O7    Waste storage areas are designed to                  is bunded and graded so that wash water         The proposal will not generate waste requiring
contain and appropriately dispose of leakage from          and bin leakage are drained to the sewer        disposal. No waste storage areas are required.
bins and wastewater from bin washing.                      or an on-site effluent disposal system via a
                                                           gully within the storage area;
                                                           has a bund wall with a maximum height of
                                                           100 mm;


                                                                                      Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 84

Page 86

                  Specific Outcomes                                   Probable solutions (if code assessment)                                               Comments

                                                                              is serviced by a conveniently located
                                                                              hosecock and backflow prevention device,
                                                                              and connected to a water supply; and
                                                                              is roofed or otherwise covered if the
                                                                              storage area is—
                                                                        i.      more than 1 m2; or
                                                                        ii.     storing wet waste; or
                                                                        iii. storing other waste with a high potential
                                                                             to cause pollution if
                                                                        iv. washed or leaked from the bins,
                                                                            including waste oil or putrescibles.
26 Any proposal for the disposal of liquid trade waste to Council’s sewer must be in accordance with Council’s Environmental Health Section’s Trade Waste Policy.

27 PSP 11 requires Waste Management Plans to be prepared as part of certain types of development applications to ensure proper consideration is given to waste
minimisation, segregation and reuse.




                                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 85

Page 87

Division 20 — Water Sensitive Design Code
Table 17 Water sensitive design code
                 Specific Outcomes                        Probable solutions (if code assessment)                                 Comments

 Maintenance of environmental values and water         S1.1    Development meets the applicable              O1 is not applicable
 quality objectives                                    performance outcomes of the State Planning            The proposal will not adversely impact on
 O1      Downstream ecosystems, properties and         Policy Appendix 2 SPP Code: Water Quality;            changes to flow, water quality or ecosystem
 infrastructure are not adversely impacted by either                                                         health. The proposal involves a proposed access
 changes to flow, water quality or ecosystem health    AND                                                   and power installation to the approved facility. No
 caused by development.                                                                                      works are required within the existing waterway
                                                       S1.2    Design and construction methods for           on the subject site or adjoining subject lot.
                                                       stormwater quality treatment assets are in
                                                       accordance with Healthy Waterways Water
                                                       By Design Guidelines;

                                                       AND

                                                       S1.3     Commitments are made to implement a
                                                       cost-effective maintenance strategy for the life
                                                       cycle of any engineered water quality treatment
                                                       device;

                                                       AND

                                                       S1.4    Water quality nutrient load modelling is
                                                       undertaken in accordance with Water by Design
                                                       Music Modelling Guidelines to demonstrate
                                                       compliance with the SPP nutrient reduction
                                                       requirements;

                                                       AND

                                                       S1.5    Stormwater outlets that directly
                                                       discharge to naturally acidic environments are
                                                       managed to prevent eutrophication;



                                                                                       Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 86

Page 88

                 Specific Outcomes                          Probable solutions (if code assessment)                                  Comments


                                                         AND

                                                         S1.6      Suitable methods are incorporated to
                                                         prevent the spread of invasive
                                                         environmental weed species at stormwater
                                                         outlets.
Water demand                                             S2.1      Captured water is plumbed to be              O2, O3 and O4 are not applicable
O2    Urban development reduces the need for             available for all external uses including gardening,   Urban development and backflow devices are not
mains water by capturing and utilising run-off from      irrigation, ponds and outdoor cleaning.                proposed.
appropriate areas on site.
                                                         S3.1   Planting is in accordance with PSP 3
O3     Urban development reduces the need for            Landscaping Plans and Guidelines.
mains water by eliminating requirement for irrigation
via the use the endemic plant landscaping design.        S4.1      A suitable backflow prevention device
                                                         is installed to protect the drinking water within
O4       Backflow devices or similar systems are         the reticulated water supply in accordance with
installed, where necessary, to ensure water reuse        AS/NZS 3500:2003 Plumbing and Drainage.
facilities have no impact on the quality of the town
mains water.
Shire Business Centre                                    No probable solution                                   O5 and O6 are not applicable
O5       Within the Shire Business Centre site, as                                                              The proposal is not within the Shire Business
shown on Map SBC run-off treatment is contained                                                                 Centre site.
within the developable areas of the site and drainage
lines are only used for final polishing of run-off;

AND

O6     Within the Shire Business Centre site, as
shown on Map SBC, on-site detention measures are
contained within the developable areas of the site,
clear of drainage lines and Open Space
Precincts.
Use of natural treatments and systems                    S7.1    No probable solution                           O7 is not applicable
O7     Natural treatment strategies, including grass                                                            The proposed access and power installation to
swales and bio-retention systems, vegetated filtration   S8.1    Integration of stormwater quality              the approved facility will not impact on water


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 87

Page 89

                 Specific Outcomes                           Probable solutions (if code assessment)                                 Comments

strips and gross pollutant traps, are used wherever       treatment is in accordance Healthy Waterways          quality and will therefore not require any natural
possible.                                                 Water Sensitive Urban Design Guidelines for           treatment strategies.
                                                          South East Queensland and the Water by
O8      Development design including density and          Design Bio retention Technical Design                 O8 is not applicable
scale provides adequate footprint to integrate all        Guideline.                                            The proposed access and power installation to
elements of stormwater quality and quantity                                                                     the approved facility will not impact on water
treatment infrastructure including, where relevant, bio   S9.1     Landscape and ecological features            quality or stormwater quality and will therefore not
retention basin batters and maintenance access,           (e.g. plant species and habitat types) used in        require a bio retention basin or retaining walls.
without the need for retaining walls.                     stormwater conveyance channels are
                                                          complementary to the local context, including         O9 is not applicable
O9     Stormwater conveyance channels use natural         natural waterways;                                    The proposed access and power installation to
channel design principles to convey external                                                                    the approved facility will not impact on water
catchment stormwater through the development site         AND                                                   quality or stormwater quality and will therefore not
and support landscape, passive recreation and                                                                   require stormwater conveyance channels.
ecological values.                                        S9.2     Planting densities result in a stable
                                                          channel over the long term and minimize
                                                          potential for invasive weed growth.
O10      Development design and operation facilitates     S10.1 Methods to prevent gross pollutants             Complies with O10
nil increase in gross pollutants entering stormwater      entering stormwater systems and waterways are         The proposed access and power installation to
systems.                                                  adopted that—                                         the approved facility will have a nil increase in
                                                                are low maintenance;                            gross pollutants entering stormwater systems. No
                                                                prevent nutrient leaching in the event          pollutants will be produced as a result of the
                                                                scheduled maintenance is delayed; and           proposal,
                                                                facilitate human behaviour change (e.g.
                                                                signage, bins).




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 88

Page 90

Division 22 — Reconfiguring a Lot Code
Table 18 All reconfiguring a lot
                      Specific Outcomes                        Probable solutions (if code assessment)                                      Comments

 Lot Size and Dimensions
 O1     Lots have the appropriate area28 and                  S1.1     If for reconfiguration other than                S1.1(a) is not applicable
 dimensions to provide for—                                   community title subdivision, Council will require         The Reconfiguring of a Lot is required for the
      the intended use and, if not intended to be used        the following—                                            proposed easement to the approved facility,
      by the Council or State for community                         Minimum lot area and minimum average                through the adjoining lot, connecting to Jirrima
      infrastructure, conservation purposes or public               width consistent with the relevant provisions       Court. A new lot is not proposed.
      utilities including road widening are not less                of Table 23; and
      than the minimum sizes specified in Table 14-                     If for residential development—
      68; and                                                                                                           S1.1(b) is not applicable
                                                                  i.      the minimum house site area is not less       The proposal is not for a residential
           if for residential development—                                than that specified in Table 24; and          development.
     i.      a house site area of not less than that              ii.     if not in a sewerage service area an
             specified in Table 14-69; and                                effluent disposal area is provided.
     ii.     if not within a sewerage service area, an
             effluent disposal area;
           if for community title subdivision, the minimum
           lot sizes for the intended use are not less than
           identified for the relevant zone specified in
           Table 14-68;
           siting and construction of buildings to minimise
           risk of soil erosion, landslide, flooding and
           bushfire;
           siting and construction of buildings to minimise
           detrimental impacts of effluent disposal and
           water quality impacts;
           retention of natural environmental values,
           including native vegetation;
           retention of cultural features and protect views
           to cultural features;


                                                                                                  Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 89

Page 91

                 Specific Outcomes                           Probable solutions (if code assessment)                                  Comments

      minimisation of earthworks or retaining walls
      associated with building construction on sloping
      sites;
      private and public open space and on-site
      landscaped areas; and
      convenient vehicle access and on-site parking,
      loading and manoeuvring areas.
Noosa North Shore Locality
O2     No additional lots are created within the Noosa      No solution provided.                                 Complies with O2
North Shore Locality.                                                                                             No additional lots are proposed within the Noosa
                                                                                                                  North Shore Locality.
Lake Macdonald Water Supply Catchment Area
O3      No additional lots are created within the           No solution provided.                                 Complies with O3
Lake Macdonald Water Supply Catchment                                                                             No additional lots are created within the Lake
identified on Overlay Maps OM3.5 and OM9.5.                                                                       Macdonald Water Supply Catchment identified on
                                                                                                                  Overlay Maps OM3.5 and OM9.5.
Lot layout29
O4      Subdivision of land for residential                 S4.1    Lots are arranged to front streets and        O4 is not applicable
development provides for a neighbourhood with a             public open space;                                    The Reconfiguring of a Lot is required for the
strong and positive identity through—                                                                             proposed easement to the approved facility,
      legible streets and open space networks;              AND
                                                                                                                  through the adjoining lot, connecting to Jirrima
      integrating prominent site features, including        S4.2   Rear lots have views over public               Court. A new lot is not proposed. A subdivision of
      landmarks, native vegetation and views into the       open space;                                           land for residential development is not required.
      design;
                                                            AND
      the location of community, retail and
      commercial facilities at focal points either within   S4.3      intended for urban settlement are located
      convenient walking distance for residents             within 1km of retail or commercial uses or land
      where the development is urban settlement or          within a commercial zone.
      within reasonable vehicular proximity;




                                                                                            Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 90

Page 92

                Specific Outcomes                        Probable solutions (if code assessment)                                  Comments

     the location of lots intended for urban
     settlement within proximity of retail and
     commercial facilities;
     shared use of public facilities by adjoining
     communities;
     enhancement of personal safety and
     minimisation of potential for crime, vandalism
     and fear by maximising opportunities for casual
     surveillance of public spaces; and
     establishment of a sense of place.
O5     House site areas are—                             No solution provided.                                O5 is not applicable
     located at least 50m from any land including                                                             No house site areas are proposed.
     within a national park, conservation park, state
     forest reserve, nature refuge, coordinated
     conservation area or wilderness area; and
     not located on steep slopes.
O6     Lots for residential development are             S6.1    A variety of lot sizes and shapes is          O6 is not applicable
designed to ensure variety in residential               provided within the subdivision.                      No lots for residential developments are
streetscapes.                                                                                                 proposed. The Reconfiguring of a Lot is required
                                                                                                              for the proposed easement to the approved
                                                                                                              facility, through the adjoining lot, connecting to
                                                                                                              Jirrima Court.
O7    The street network—                               S7.1    Where involving the construction of a new     O7 is not applicable
     a) has design features, which convey the           road, road planning and design supports the
                                                                                                              No street networks are proposed.
     primary function of each type of street and        hierarchy and functional aspects identified in
     encourage driver behaviour, speeds and             Sections 2 and 3 of PSP5 Engineering Design
                                                        Standards – Roads, Drainage and Earthworks;
     traffic volumes that are safe and appropriate to
     that function;                                     AND
                                                        S7.2 Road and pathway planning and design is
                                                        in accordance with, in order of precedence—
                                                              Noosa Integrated Local Transport Plan;


                                                                                        Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 91

Page 93

           Specific Outcomes                         Probable solutions (if code assessment)                                  Comments

provides a high level of internal accessibility           Queensland Transport’s Shaping Up
both within the site and to external sites and            Queensland Design Code for Residential
appropriate external connections for vehicles,            Streets;
pedestrian and cycle movements;
                                                          AUSTROADS Guide to Traffic Engineering
deters through-traffic from residential areas and         Practice;
creates safe conditions for local road users,
pedestrians and cyclists;                                 Sections 2 and 3 of PSP5 Engineering
                                                          Design Standards- Roads, Drainage and
incorporates street junctions and access to lots          Earthworks;
that are located and spaced to facilitate safe
and convenient vehicle movements;                         The Noosa Cycling and Walking Network
                                                          Development Plan; or
provides for street widths and lengths that
optimise the cost effectiveness of the network            A combination of the principles in these
and the provision of public utilities;                    documents;
provides for road reserve widths not less than      AND
the minimum identified Section 2.3 of PSP5          S7.3    The achievement of multiple
Engineering Design Standards – Roads,               connections for all roads and streets (excluding
Drainage and Earthworks;                            culs-de-sac) within the subdivision and to
minimises the extent of earthworks required by      adjoining subdivisions;
being sympathetic to the terrain;
                                                    AND
has no significant adverse effects on habitat
corridors or areas of significant native            S7.4    Road networks provide connectivity
vegetation;                                         between residential areas, both internally and to
                                                    adjoining sites, using access roads
does not create noise attenuation difficulties;
incorporates pedestrian and cyclist crossings at    AND
intersections or where required to access high      S7.5   The length of a cul-de-sac does not
activity nodes and public transport;                exceed 200m in urban areas and 500m in rural
has regard to the potential for conflict between    areas;
vehicles, pedestrians and cyclists; and
                                                    AND
incorporates on-road cycling facilities.
                                                    S7.6    The layout uses street and road
                                                    design, including variations in carriageway
                                                    width, as a traffic calming measure to



                                                                                    Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 92

Page 94

                Specific Outcomes                         Probable solutions (if code assessment)                                   Comments

                                                         encourage lower traffic speeds. (Note:
                                                         Carriageway widths are identified in Section
                                                         2.3 of PSP5 Engineering Design Standards –
                                                         Roads, Drainage and Earthworks.)
                                                         AND
                                                         S7.7     On-road cycling treatment is utilised to
                                                         provide safe and continuous movement of
                                                         cyclists along a roadway such as--
                                                               sealed shoulders;
                                                               wide kerbside lane;
                                                               exclusive or peak period bicycle lane;
                                                               advisory treatments such as Bicycle
                                                               Awareness Zone;
                                                               shared parking / bicycle lane;
                                                               contra flow bicycle lane; or
                                                               bus/bicycle lane;
                                                         AND
                                                         S7.8     The provision of bicycle lanes at
                                                         intersections is generally in accordance with
                                                         AUSTROADS Part 14, section 5 and Manual of
                                                         Uniform Traffic Control Devices (MUTCD) Part 9.
O8     The development contains a pathway                S8.1     Subdivision design and layout provides        O8 is not applicable
system that encourages walking and cycling and           for walking and cycling routes designed and            No cycle or pathway systems are proposed.
provides a safe environment for users, and is--          constructed in accordance with—
      a stable, smooth surface, including across               Sections 2 and 3 of PSP5 Engineering
      driveways, sections and joins;                           Design Standards – Roads, Drainage and
     easily maintained;                                        Earthworks;
     of a width and longitudinal gradient to cater for         AUSTROADS Parts 13 and 14; and
     projected usage                                           The Noosa Cycling and Walking Network
     inclusive of clear sight-lines for safe use;              Development Plan;



                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 93

Page 95

          Specific Outcomes                    Probable solutions (if code assessment)                                   Comments

be free of any obstructions such as fences,   AND
signage and bollards.
                                              S8.2     If within 1km of the Pathways
                                              Network identified in the Priority
                                              Infrastructure Plan in Part 15, the subdivision
                                              design and layout includes pathways—
                                                    located in accordance with the Pathways
                                                    Network identified in the Priority
                                                    Infrastructure Plan; or
                                                    linking to the Pathways Network identified in
                                                    the Priority Infrastructure Plan;
                                              AND
                                              S8.3     Pedestrian routes are planned to
                                              provide clear, safe connections between
                                              residential, open space, transit stops and retail
                                              areas, and are located along, or are visible
                                              from, streets or other public spaces;
                                              AND
                                              S8.4    Primary pedestrian routes border the
                                              frontages of residential, public parks and
                                              business uses;
                                              AND
                                              S8.5     Pedestrian routes through parking lots
                                              or at the rear of lots are avoided;
                                              AND
                                              S8.6   Pedestrian and cycle path infrastructure is
                                              designed and constructed to—




                                                                               Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 94

Page 96

             Specific Outcomes                Probable solutions (if code assessment)                                      Comments

                                                    a) have sign posting, particularly where they
                                                    are commuter and recreational paths, and
                                                    incorporate pavement markings and line
                                                    work in accordance with AUSTROADS Part
                                                    14 Bicycles, Section 9;
                                                    have navigational signs generally in
                                                    accordance with the Manual for Uniform
                                                    Traffic Control Devices Bicycle Directional
                                                    Signage Guidelines, and Australian
                                                    Standard 1742.9: 2000 Manual of Uniform
                                                    Traffic Control Devices Bicycle Facilities;
                                                    be clearly delineated by pavement markings
                                                    and warning signs when an on- road bicycle
                                                    lane;
                                                    incorporate kerb ramps at all intersections
                                                    and designated crossings;
                                                    have refuge islands on all roads with median
                                                    strips;
                                                    have holding rails for cyclists at the
                                                    intersection of district collector, sub- arterial
                                                    and arterial roads that are positioned in
                                                    accordance with Australian Standard
                                                    1742.9:2000 – Manual of Uniform Traffic
                                                    Control Devices Bicycle Facilities, and
                                                    AUSTROADS Part 14 Bicycles Section 9;
                                                    have marked bicycle lanes, bicycle
                                                    awareness zones or storage boxes; and
                                                    Include lighting to pedestrian and cycle
                                                    pathways to local government requirements
                                                    and in accordance with Australian Standard
                                                    1583.1 Road Lighting – Pedestrian area
                                                    (Category P) lighting.
O9   The subdivision layout is designed to   S9.1     Where there is no relevant approved               O9 is not applicable


                                                                                 Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 95

Page 97

                 Specific Outcomes                         Probable solutions (if code assessment)                                   Comments

facilitate linkages with adjoining sites in the           master plan, concept plan, or site analysis plan,      No subdivisions are proposed.
immediate area.                                           subdivision design incorporates future road,
                                                          street, cycleway and pedestrian path and open
                                                          space connections to adjoining sites.
O10      Where the lots are to be used for                No solution provided.                                  O10 is not applicable
Industrial business or Commercial business uses, the                                                             The Reconfiguring of a Lot is required for the
layout provides for appropriate buffer areas, to                                                                 proposed easement to the approved facility,
mitigate possible impacts on nearby residences or                                                                through the adjoining lot, connecting to Jirrima
other noise sensitive uses.                                                                                      Court. A new lot is not proposed.
O11     For lots in the Rural Settlement Zone—a           No prescribed solution.                                O11 is not applicable
sealed access to the nearest urban settlement is                                                                 The Reconfiguring of a Lot is required for the
available.                                                                                                       proposed easement to the approved facility,
                                                                                                                 through the adjoining lot, connecting to Jirrima
                                                                                                                 Court. A new lot is not proposed.
Water supply for fire fighting
O12      An adequate and accessible water supply          S12.1 For development in a water service               Complies with O12
is provided for firefighting purposes.                    area, water mains within the development shall         The proposed access and power installation to the
                                                          comply with the:                                       approved facility are located within close proximity
                                                                Queensland Water Resource Commission -           to a waterway.
                                                                Guidelines for Planning and Design of
                                                                Urban Water Supply Schemes; and
                                                                Australian Standard 2419 and the Water
                                                                Providers Network Model Criteria;
                                                          AND

                                                          S12.2 Facilitate the connection of fire services
                                                          that comply with the requirements of the
                                                          Building Code of Australia.

Energy efficiency
O13     The street and lot orientation facilitates the    S13.1 For Community Title Development or urban         O13 is not applicable
construction of energy efficient buildings that respond   residential development each lot contains a            The Reconfiguring of a Lot is required for the


                                                                                           Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 96

The text continues on page 98.

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Code Assessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.