Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions (if code assessment) Comments
comply with Table 13.12; or
are designed and constructed to exclude
water inundation or infiltration and resist
hydrostatic and hydrodynamic forces as a
result of inundation.
Electricity supply infrastructure Complies with O18
S18.1 Building footprints are situated clear of
O18 Uses and works maintain a safe distance any power easements on-site; The proposed access and power installation for
from electrical infrastructure including substations, the approved facility are not located near any
AND existing power easements on site.
overhead power lines, power poles and
transformers. S18.2 Building footprints are not less than 50m
from an existing fenced electricity substation.
Earthworks and stormwater management31
O19 Stormwater run-off is managed so as not No solution provided Complies with O19
to cause any adverse impacts on the built or The proposed access to the approved facility
natural environment including changes in quality, requires an all-weather gravel track and will be
quantity or location of stormwater discharges. semi-permeable. No adverse impacts on the
natural or built environmental are expected to
occur.
O20 Filling or excavation only occurs where it No prescribed solution. Complies with O20
does not adversely impact on— The existing watercourse crossing has been
watercourses, drainage lines and assessed to determine its suitability to
wetlands; or accommodate construction and maintenance
vehicles to the site and it has been determined to
vegetation on land identified on Biodiversity
be sufficient without the need for additional
Overlay Maps OM1.1-OM9.1; or
earthworks surrounding waterways.
water levels on properties elsewhere.
Landscaping and visual amenity
O21 Land development responds to the S21.1 The natural landform and landscape are Complies with S21.1
distinctive landscape character of the site by not modified to accommodate the The proposed access and power installation to the
utilising the natural features of the site, which development. approved facility will not adversely impact on the
include— natural landform and landscape of the area. The
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.