Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific outcomes Probable solutions (if code assessment) Comments
stock proof fencing is installed along
watercourses at a distance of no less than
10m from the top of the bank;
stock watering points are located no less
than 15m away from the top of the bank of
watercourses; and
stock crossing points across watercourses
are defined and controlled with stock proof
fencing,
to prevent stock from damaging riparian
vegetation or banks to watercourses;
OR
S5.4 Recreational facilities (including
playgrounds, pergolas, barbeques etc) are
setback a minimum of 30m from the top of the
bank of a watercourse and 10m from the top of
the bank of a drainage line;
OR
S5.5 For Forestry uses the cultivated area is
separated from watercourses by a distance not
less than the distances identified below,
measured from high water mark or the top of the
bank, whichever is the greater distance—
Feature Distance
Stream order 1 or 2 5m
Stream order 3 or 4 10 m
Stream order greater than 4 20 m
AND
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.