Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific outcomes Probable solutions (if code assessment) Comments
areas of vegetation, incorporate fauna friendly
fences;
AND
S14.3 Vegetation is protected from
interference resulting from clearing or
construction activities by—
clearly marking vegetation to be retained
with flagging tape;
installing protective fencing around the
dripline of the vegetation and avoid filling
and excavation in these fenced areas; and
ensuring stock piling, storage and vehicle
parking occur outside the identified
vegetation areas;
AND
S14.4 Low impact construction techniques
are used around vegetation to minimise
interference with the vegetation.
Filling and excavation No solution provided. Complies with O15
O15 Vegetation is not adversely impacted Earthworks will only be required for the provision of
upon by earthworks and changes to the power to the approved facility and will not result in
hydrological regime, including changes to ground changes to vegetation, or the hydrological regime of
water levels, flooding levels, run-off and tidal the waterway
hydraulics.
Vegetation management
Replanting and rehabilitation S16.1 Landscaping and rehabilitation O16 is not applicable
O16 Development provides for ecologically complements and supports ecologically Ecologically important areas will not be significantly
important areas to be restored and enhanced important habitats by— impacted upon as a result of the proposed access
through the following measures— utilising native plants of local origin; and power route to the approved facility.
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.