Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Acceptable solutions Comments
(if accepted development subject to
requirements)
Probable solutions
(if code assessment)
development.
Local amenity S4.1 The following control measures are Complies with O4
O4 Earthworks do not cause disturbance to the implemented— No significant earthworks are proposed. Only minor
amenity of the neighbouring land. regular water spraying of exposed areas to earthworks are required to upgrade the proposed
suppress dust; access track to the approved facility with a gravel
provision of dust stabilised or sealed all-weather finish. The power installation to the
internal roads; approved facility will be minimal as power will be
installed underground.
protective covering of exposed areas that
are left for more than 2 weeks; and
if there is no valid development permit for
the site, disturbed areas are revegetated
using species identified in PSP3 -
Landscaping Plants and Guidelines;
AND
S4.2 Earthworks are undertaken only during
the hours of 7am to 6pm, Monday to Friday and
7am to 6pm on Saturday. No work is
undertaken on Sunday or public holidays.
Vegetative Waste S5.1 Cleared vegetation is transported off- Complies with S5.1
O5 Vegetation cleared from a development site is site for disposal in an approved green waste Cleared vegetation will be transported and
disposed of in an environmentally responsible disposal facility; disposed of prior to the completion of construction.
manner.
OR
S5.2 Cleared vegetation is mulched on-site
and reused for landscaping of the finished
development;
OR
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.