Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions (if code assessment) Comments
Frontage works
O13 Development is provided with external S13.1 The following infrastructure components O13 is not applicable
roadworks along the full extent of the frontage of already exist at the frontage of the site or are No roadworks are proposed.
the site to an appropriate standard having regard provided at the developer’s expense—
to the specified function of the road. full width sealed road;
concrete kerb and channel where
appropriate;
forming and grading to footpaths;
vehicular kerb and footpath crossings;
a constructed bikeway;
a constructed footpath;
a constructed carriageway;
required alterations to public utility mains,
services or installations;
construction of any required alterations to
public utility mains, services or installations;
stormwater drainage works; and
installation of electrical conduits;
AND
S13.2 Road and drainage design and
construction is in accordance with Sections 3 and
4 of PSP5 Engineering Design Standards –
Roads, Drainage and Earthworks.
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 79
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.