Skip to the record
Accept no imitations.

Council archive · source document

Appendix D Code Assessment · MCU16/0099.01

of 110

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                   Specific Outcomes                                                   Probable solutions                                                      Comments

                                                                     AND

                                                                     S15.2 Contributions toward pedestrian and
                                                                     bicycle pathways are provided in accordance
                                                                     with the Priority Infrastructure Plan in Part 15.
1 Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These provisions are not limited to areas shown as Flood
Hazard Areas on overlay maps 1.3-9.3.

2 Council may request additional information on the proposed method of effluent disposal to ensure the nature of the development is compatible with environmental
values. Refer to PSP1 – Information Council May Request.




                                                                                                              Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 8

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Code Assessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.