Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions Comments
AND
S15.2 Contributions toward pedestrian and
bicycle pathways are provided in accordance
with the Priority Infrastructure Plan in Part 15.
1 Information on minimum floor levels and flood levels for some parts of the Shire is available from Council. These provisions are not limited to areas shown as Flood
Hazard Areas on overlay maps 1.3-9.3.
2 Council may request additional information on the proposed method of effluent disposal to ensure the nature of the development is compatible with environmental
values. Refer to PSP1 – Information Council May Request.
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.