Minor Change Report MCU19 0049 01 (As Published) · MCU19/0049.01
Prior to the approved redevelopment being introduced, car parking at the site was largely informal.
The 2019 approval included the formalisation and rationalisation of on‑site parking, resulting in an
improved parking layout, circulation and efficiency. While one (1) fewer space is now proposed,
the overall outcome remains an improvement in existing conditions, with a greater proportion of
parking demand being accommodated formally on-site rather than within surrounding streets.
As a result, despite the loss of one parking space, the development is still considered to comply
with Performance Outcome PO6 of the Driveways and Parking Code.
Existing Condition 34
34. A total of 64 car and at least 10 motorcycles parking spaces are required to be supplied for
the site, including additional and/or altered existing parking spaces as detailed in conditions
35 & 36
Applicant’s Request
The applicant has requested to amend existing condition 34 to reduce on site car parking provision
from 64 to 63.
Assessment of Request
As discussed above, the reduction of one parking space is still considered to achieve compliance
with Performance Outcome 6 (PO6) of the Driveways and Parking Code.
Recommendation
It is recommended existing condition 34 be amended to read as follows:
34. A total of 64 63 car and at least 10 motorcycles parking spaces are required to be supplied
for the site, including additional and/or altered existing parking spaces as detailed in
conditions 35 & 36
Existing Condition 4
4. The currency period for this development approval lapses if the use has not happened by 25
November 2025, unless an application to extend the currency period is approved by Council
Applicant’s Request
The applicant has requested existing condition 4 be amended to extend the currency period to 25
November 2029.
Assessment of Request
As discussed above, including the ministerial Covid extension, the currency period of the
application presently ends 25 November 2027. The applicant seeks to extend this effectively by
two years to 25 November 2029.
Given the development is for vital community infrastructure being Eden Private Hospital and the
development is still generally consistent with the intent of the Community Facilities Zone, the
proposed extension to the currency period is considered acceptable.
Recommendation
It is recommended existing condition 4 be amended to read as follows:
5. The currency period for this development approval lapses if the use has not happened by 25
November 2025 2029, unless an application to extend the currency period is approved by
Council
Page 7 of 10
Document Set ID: 24854784
Version: 7, Version Date: 17/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU19 0049 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.