Council archive · source document
Part 1 of 2 - Part 1 of 2 - IDAS Form 1 - 24 Neptune Ct, Noosaville · OPW10/2151
A KE /
Write code here Z 0090 14 6
_. THIS IS THE NEXT PART OFA
MULTIPLE PART RECORD
Oo Part_\Of2
Application number: Pwo {21S | Oo
MAM BCS TAMiINFORMATION MA NAGEMENT:RECORDS MANAGEMENT:Control af RecordssEDRMS\Multi; Part Record: Cover SheeuNEXT PART.xts
a ie :
lOomeny Coy )
| Ner
20 OCT zo
= . .
. ] Mia tin
t | . nl) ,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
Integrated, Development’Assessment System form aR
in
Application Details - IDAS form 1
{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your-dpplication not being a properly made application.
For all development applications, you must: ,
* — complete this form (Application details - IDAS form 1) 4 :
* — complete any other forms relevant to your application \
* provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the tand. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development penmit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.
Nameis (individua! or company name in full) PILesT PTY LTD T/A NOOSA JETTY BUILDERS
For companies, contact name [DANNY REED
Postal address PO BOX 299 NOOSAVILLE QLD 4566
- Contact phone number 10408 137 526
*Mobile number (non-mandatory)
Fax number (non-mandatory) 107 5474 3480
e-mail address (non-mandatory) * [email protected]
{t. What is the nature of development proposed? (tick all applicable boxes)
material change of use of premises TST riee :
building work Development Cou nter
operational work
OXOO
reconfiguring a lot
19 OCT 2019
Tewantin
Cfo NZSaanacelaLt
Department of Infrastructure and Planning faPian} Vey
Page 3
| ~~ |[2. What type of approvals being sought? LJ development permit (] preliminary approval (both - provide details below Ia, Is the application for a mobile and temporary environmentally relevant activity (ERA)? & No oO Yes - complete table A and then go to question 5 [4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row) Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the premises Lot on plan Street Address . description Loca) government area Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns) No. | No. suburb/locality name code ‘| and plan no. 1 24 Neptune Cire, Noosaville 4566 [368 [RPB63z46 SUNSHINE coast regional (Street address / tot on plan a Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates (note: place each set of coordinates in a separate row) Zone Datum Local government Easting Northing | Latitude | Longitude reference area (If applicable) LJ pag ' (0 wese4 CO other 5. Total area of the premises on which the development is proposed (indicate hectares or m?) 925m2 6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.) 1 [house 7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) timber jetty Application Details - IDAS form 7 Version 1.0 18 December 2009
Page 4
'
OO
|B-Is-owner's: consent required -for this-application?-(refer-to- notes. at-the.end_of.this.form_for.more_information)_—__|
(1 No
Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land = John & Valde Keech Torn &€ VacoR KEECH .
\We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land) ZZ ; Kaw eb) 4a Kary ©
Date Aes Qastebet Joo.
Table E
Name of owner/s of the tand
(1) The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
oO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
KI] No (Yes - complete table G
[10. identify if any of the following apply to the premises (tick applicable box/es)
{X} adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(1 __ onstrategic port land under the Transport infrastructure Act 1994 - complete table |
C __ ina tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
1 | Noosa Waters Canal
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
{XJNo [Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 5
OOO
12. Does the proposal include new building work or operational work on the premises? (including any
[7 services) “nee
CINo Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
1X] No - Go to question 15 (1 Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
& No
(11: Yes - provide details betow
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment assessment manager
1 {Formé over the counter
2 |Checktist over the counter
3 | John Norden Plans over the counter
[17. Applicant's declaration
SS By making this application, | declare that all information in this application is true and correct (note: it is
unlawtul to provide false or misleading information).
Application Details - IDAS form 7
Version 1.0 18 December 2009
Page 6
1
OO
" Notes for compieting this form
\ Question 8:
« Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
e® Owner's consent is not required for a mobile and temporary ERA.
Question 9: :
* Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
« The Building and Construction industry (Portable Long Service Leave) Act 1991 prescribes when the portable
jong service leave levy is payable.
e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
* The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
penmit is issued.
* Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be compteted on the QLeave website at
www.gleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qieave.ald.gov.au.
Privacy -the information coltected in this form will be used by the Department of Infrastructure and Planning (O!P) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To: Council. | have been engaged as the private certifier for the
° building work referred to in this application.
Date of Name BSA Certification Building
engagement license number classification/s
Application Details - {DAS form 7
Version 1.0 18 December 2009
Page 7
‘ OO QLEAVE NOTIFICATION ~, AND PAYMENT (fer completion by assessment manager or private certifier if applicable) ‘Description of the work QLeave Project Number [Amount paid ($) Date paid Date receipted form sighted by|Name of officer who assessment _ |sighted the form manager 1 The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 8
-—
y oo integrated Development’Assessmentisystem checklist
Operational Works - IDAS Checklist 4
(Sustainable Planning Act 2009, version 1.0, 18 December 2009)
This checklist only applies when the development application seeks approval for operationai works.
You should complete all questions unless the checklist indicates otherwise.
All planning and development applications require applicants to complete the following:
« Applicant details --IDAS form 1
° any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your tocal government, or go to the Department of
(nfrastructure and Planning's website, www.dip.qld.gov.au. ,
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.
Part 1 - General questions
1.1
Is the proposed operational work assessable under the planning scheme?
{X] No
(Yes
° You must complete Building and operational work assessable against a planning scheme - [DAS
form 6
° Continue on to question 1.3
1.2
Is the proposed operational work assessable under any state planning regulatory provisions?
IX] No
° Go to question 1.9
iOYes
je Go to question 1.4
1.9
is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable?
J No
C) Yes
le It is recommended that you complete part 6 of this checklist.
1.10
Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?
Ix] No
[J Yes
e it is recommended that you complete part 7 of this checklist.
4.11
Is any of the proposed operational work for any thing constructed or instailed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
‘or from a dam constructed on a watercourse or lake?
BX] No
° Itis recommended that you complete part 8 (starting from question 8.8) of this checklist.
(Yes
je {tis recommended that you complete part 8 (starting from question 8.1} of this checklist.
- SEEtenichitesieen Go em PE, - ey
Page 9
OOO
1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 20097 ©
—X] No
(Yes . It is recommended that you complete part 9 of this checklist.
41.13 Is any of the operational work proposed to be carried out within a coastal management district?
[IX] No
(Yes ° It is recommended that you complete part 10 of this checklist.
1.14 ts any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?
No
CD Yes ° It is recommended that you complete part 11 of this checklist.
4.15 1s any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?
&] No
(Yes . It is recommended that you complete part 12 of this checklist.
1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?
[x] No
It is recommended that you complete part 13 of this checklist.
(Yes
1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
[X] No
(Yes ° It is recommended that you complete part 14 of this checklist.
4.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlied road?
{XJ No
(1 Yes e It is recommended that you complete part 15 of this checklist.
Part 2 - State-controlled roads
2.4 Is the proposed operationa) work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?
{J No | |e End of part 2 of this checklist.
C1 Yes ° This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency.
. End of part 2 of this checklist.
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2
Operational works - IDAS checklist 4
Version 1.0 December 2009
Page 10
CLI
Part 8 - Taking or interfering with water
8.8 ‘Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?
—X]No
You must complete Taking artesian or sub-artesian water - IDAS form 12.
C]yYes . This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
3.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?
2 No je Go to question 8.12.
(71 Yes
8.12 ts any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to -
pump water)?
No « Go to question 8.14
CO Yes
18.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Acf 2000, for interfering with overland flow water (other than using a water truck to pump
water)?
[XJ No ° Go to question 8.19
(1 Yes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety C1 Yes 5 No
jand Reliability) Act 2008 - .
to increase the storage capacity of a referable dam by more than 10 per cent . {] Yes ) No
. if yes to any of the above you must complete Referable dam - IDAS form 16.
° This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
° Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
° Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
Wild Rivers Act 2005, section 43A
Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
. Relevant wild river declarations
Operational works - IDAS checklist 4
Version 1.0 December 2009
Page 11
a” we ta LILI Notes for completing this form: . Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be completed for all development applications to be considered. ° The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Privacy - please refer to the assessment manager for further details on the use of information recorded in this form. Disclaimer: While the Department of infrastructure and Pianning (DIP) believes that the information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application ¢ of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form. Operational works - IDAS checklist 4 Version 1.0 December 2009
Page 12
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) -
This form must be completed for development applications for building works or operational work assessable against
a planning scheme. ,
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
° complete Applicant details - IDAS form 1
® complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
LD building work - complete table A operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
(J read works LJ stormwater {K] water infrastructure
(1 drainage Works ( earthworks sewerage infrastructure
LD landscaping ( signage {[] clearing vegetation under the planning scheme
(J other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please.
use an attachment to this form to detail each approval request) .
[X] development permit ( preliminary approval (C both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
No (J Yes - specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
No (J Yes - provide details below
Page 13
tae ee 2. What is the dollar value of the proposed building work? (inc GST, materials and. labour) $14,640 at Building and operational! work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 14
DOO
Confirmation
of lodgement Method of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
existing and proposed contours
drainage locations, diameters and class of pipe, open drains and-
easements Lconfirmed
* manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
le inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels .
Applications for operational works involving water reticulation
drawings showing:
kerb lines or edge of pavement where kerb is not constructed
location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections {if applicable)
location of bench marks and reference pegs
*
(LJ confirmed
eoeoeeoewvee¢ee
Applications for operational works involving sewerage reticulation
drawings showing: :
focation of all existing and proposed services
location of aif existing and proposed sewer lines and manhole locations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable)
[_|confirmed
Ce ee ee
Applications for operationa) works involving street lighting
drawings showing:
location of ail light potes and service conduits
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to norma! alignment
details of lighting levels
(| confirmed
eoeeec eo ee
}
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 15
* ‘ AAS Confirmation lof lodgement Method of lodgement [Applications for operational works involving public utility services drawings showing: * any existing light poles and power poles garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details eee * any existing underground services Ciconfirmed le §©details of proposed services . * alternation to existing services Applications for operational works involving landscaping works drawings showing: | ‘ * the location of proposed plant species * aplant schedule indicating common and botanical names, pot sizes and numbers of plants . planting bed preparation details including topsoil depth, subgrade preparation, muich type and depth, type of turf, pebble, paving and (|confirmed Notes for completing this form: ¢ This form can also be used for development applications for building works or operational works assessable against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport tand. Privacy -please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date Received Reference Numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Used in these records
Part 1 of 2 - Part 1 of 2 - IDAS Form 1 - 24 Neptune Ct, NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 566 KB (small file)
- File type
No other editions are linked here.