Service Level Catalogues(PDF, 3MB)
ACTIVITY SERVICE LEVEL TARGET
Trip Hazards – high 10 business days 20 business days 20 business days
Trip Hazards – med / low 20 business days 40 business days As budget allows
Slippery Surface 2 business days 20 business days 40 business days
Surface Defects 10 business days 20 business days 65 business days
Uneven/broken Path – 5 business days 20 business days 40 business days
high
Uneven/broken Path – 20 business days 40 business days 130 business days
non-urgent
Scheduled work Hastings St additional works (levy)
Pressure washing and resealing coloured concrete Twice a year / levy
zones (includes pedestrian crossings in the road and covers 1 extra service
some footpath areas)
Seal granite pavers with non-slip coating Every 5 years
Reactive work [customer Issue First response Target for completion
requests] 2 General pathway As per prioritisation 20 days
maintenance issues (e.g. above
uneven surface)
Hazard (trip/fall; As per prioritisation 5 days
obstruction) above
Operations
[Removal of debris, dead animals and graffiti as well as sweeping/cleaning of path surfaces, painting of timber
decking/boardwalk structures, and trimming of overhanging trees]
Cyclic inspections These items are picked up as part of the maintenance inspection program
other than for contracted works as follows:
Public space cleaning contracts all town precincts Monthly – locations
(includes pathway sweeping & litter pick-up) selected ad hoc
Scheduled Work Manual path sweeping/cleaning/litter pick-up (Contract) 3
• Peregian Beach; Sunshine Beach; Sunrise Daily
Beach; Noosa Junction; Noosa Heads; Noosaville
& Tewantin
• Boreen Point & Cooroy 3 x week
• Cooran & Kin Kin 2 x week
Pressure Cleaning – Town Precincts
Hasting Street Twice yearly (2nd
service levy funded)
Note: LOS under
review due to impact
of cleaning on anti-slip
treatment applied to
pavers.
Peregian Beach
Sunshine Beach
Noosa Junction - (a section in front of surf shop Annually (base level
currently done monthly at seats due to bad stains) service)
Tewantin
Rest of the town centres and other pathways (as
required basis)
Reactive work [customer Issue Target for completion
requests] 4 Cleaning
Tree trimming 20 business days
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Service Level Catalogues(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.