Original source · versioned page text
Service Level Catalogues
ACTIVITY SERVICE LEVEL TARGET
Daintree Estate flood mitigation system 18 cuts per year
– mowing (included as part of Park
mowing service for Leafhaven Park) 6
KEY SERVICE METRICS
Measure Metric Benchmark Comparison
Cost to maintain stormwater infrastructure 2018/19 2017/18 2016/17
Net cost - including depreciation 3,647,857 3,408,497 3,490,760
Net cost - excluding depreciation 950,438 747,179 854,658
Rateable properties 30,500 30,000 30,000
Cost per rateable property - incl 119.60 113.62 116.36
Cost per rateable property - excl 31.16 24.91 28.49
PERFORMANCE MEASURE
Service Indicator Performance Measure Methodology
Drainage & Flood Satisfaction Noosa community satisfaction Community satisfaction mean
Mitigation mean rating score compared to performance rating from the LGAQ
the State mean rating score Community Satisfaction Tracking
(out of optimum rating of 5). Survey for Provincial areas for:
NSC mean State mean Theme: Basic Services &
rating (2019) rating (2017) Infrastructure
3.64 3.49 Function: Drainage & Flood
Mitigation
1 Refer to Asset Responsibility Matrix for specific areas of responsibility
2 Source Stormwater Asset Management Plan adopted 22 October 2015 – data subject to further validation.
3 Source Recurrent Maintenance Manual.
4 Reactive maintenance requests are assessed as to warrant for work and available budget – emergencies
responded to same day.
5 Daintree Estate Disaster Management Plan 08/07/2016.
6 Source Road Landscaping Maintenance Contracts - 1718Q014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Service Level Catalogues(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.