2307-35698 SER_Amended response - with conditions
Attached to the e-mail 2307-35698 SER application correspondence - Changed early referral response—with conditions OPW23/0116.
RA29-N
Our reference: 2307-35698 SER
Applicant reference: 20209
9 August 2023
The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]
Dear Sir/Madam
Changed early referral response—with conditions
(Given under section 28 of the Development Assessment Rules)
On 8 August 2023 the State Assessment Referral Agency (SARA) received representations from the
applicant requesting SARA change its referral agency response. SARA has considered the
representations and now provides this changed referral agency response which replaces the response
dated 18 July 2023.
Applicant details
Applicant name: JACLYN ANN GAZAL
Applicant contact details: PO BOX 202
LABRADOR QLD 4215
[email protected]
Location details
Street address: 47 Mossman Court, Noosa Heads
Real property description: Lot 88 on N21847
Local government area: Noosa Shire Council
Application details
Development permit Operational work for pontoon for private use
South East Queensland (North) regional
office
Level 4, Foundation Place 3 South Sea
Islander Way, Maroochydore
Page 1 of 5 PO Box 1129, Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
2307-35698 SER
Referral triggers
The development application was referred to SARA under the following provisions of the Planning
Regulation 2017:
10.17.3.1.1 Tidal works or work in a coastal management district
10.17.3.2.1 Tidal works or work in a coastal management district
Conditions
Under section 56(1)(b)(i) of Planning Act 2016, the conditions set out in Attachment 1 must be attached
to any development approval.
Reasons for decision to impose conditions
SARA must provide reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Approved plans and specifications
SARA requires that the plans and specifications set out below and enclosed must be attached to any
development approval.
Drawing/report title Prepared by Date Reference no. Version/issue
Aspect of development: Operational works
Proposed replacement Superior Jetties 07/08/2023 20209-D01 A
pontoon and gangway
(as amended in red)
A copy of this response has been sent to the applicant for their information.
For further information please contact Rosanna Nobile, Graduate Planner, on 07 5352 9777 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Paul Gleeson
Principal Planning Officer
cc JACLYN ANN GAZAL, [email protected]
enc Attachment 1—Changed conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Approved plans and specifications
State Assessment and Referral Agency Page 2 of 5
Page 3
2307-35698 SER
Attachment 1—Changed conditions to be imposed
No. Conditions Condition timing
Development Permit for operational work
Schedule 10, Part 17, Division 3, Table 1, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The development must be carried out generally in accordance with For the duration of
the following plan (as amended in red): works and to be
maintained
Proposed replacement pontoon and gangway, prepared by Superior
Jetties, dated 07/08/2023, drawing number 20209-D01, version A
2. The works to which this approval relates are to be for a private At all times
purpose only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of referral agency conditions
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval
(c) maintain such measures, plant and equipment in a proper
and efficient condition
(d) operate such measures, plant and equipment in a proper
and efficient manner
4. For the proposed works only use material which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding At all times
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense.
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with At all times
the following plan (as amended in red):
Proposed replacement pontoon and gangway, prepared by Superior
Jetties, dated 07/08/2023, drawing number 20209-D01, version A
7. (a) Light/mark all vessels, structure, plant and equipment associated For the duration of
with the works, in accordance with Section 3 of AS4282-1997 works and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
times
Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the effectiveness
of navigational lighting.
State Assessment and Referral Agency Page 3 of 5
Page 4
2307-35698 SER
8. The construction, operation and maintenance of the pontoon. And For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone; or
impede the safe navigation of other ships or boats; or restrict safe
access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed works
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 of 5
Page 5
2307-35698 SER
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
The proposed development is for operational work for prescribed tidal works to construct a
pontoon at 47 Mossman Court, Noosa Heads, which is formally described as Lot 88 on N2184.
The pontoon and gangway is for private use and for one vessel with a maximum wet vessel
beam of 4 metres.
The proposed structure, including any vessel berthed, moored or attached to the structure:
o will not encroach into, pass over or under a navigation corridor, and
o is not located in a high-risk maritime development zone.
The proposed structure meets the FT5 qualifying criteria checklist 4 and complies with the SDAP,
subject to conditions to ensure:
o the development is carried out generally in accordance with the plans of development
submitted with the application
o that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways
o the development does not encroach on the navigation corridor or high-risk maritime zone
to ensure the safe passage of vessels
o that debris from the development does not create a hazard to navigation
o that there is no residual material that could create a hazard to navigation.
The proposed structure meets the FT5 qualifying criteria checklist 5 and complies with the SDAP,
subject to conditions to ensure:
o the development is carried out generally in accordance with the plan of development
submitted with the application.
o that at all times, the works, to which this approval relates are for private purpose only.
o any operator and contractor involved in the works ensures impacts on coastal values
(water quality) are avoided or minimised.
o works only use materials which are free from contaminants as defined under section 11
of the Environmental Protection Act 1994.
o damaged works as a result of erosion, flooding or storm tide inundation, the registered
landowner(s) of the subject land shall be responsible for the removal of all debris at their
own expense.
Materials used in the assessment of the early referral response:
The development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
State Development Assessment Provisions (version 3.0), as published by SARA
The Development Assessment Rules
State Assessment and Referral Agency Page 5 of 5