Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              NOOSA LANDFILL –
                  STORMWATER MANAGEMENT PLAN




CLIENT: NOOSA SHIRE COUNCIL

DOCUMENT NUMBER: R2015

VERSION: B

DATE: 7/2/2022
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 59 (of 63)

Page 2

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



TABLE OF CONTENTS
1        INTRODUCTION                                                                                                                                                                                                      1
         1.1.      OBJECTIVE & SCOPE                                                                                                                                                                                       1
         1.2.      GUIDELINES                                                                                                                                                                                              2
         1.3.      LEGAL REQUIREMENTS                                                                                                                                                                                      2
         1.4.      LICENSE CONDITIONS AND WATER QUALITY OBJECTIVES                                                                                                                                                         3
         1.5.      PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE                                                                                                                                                     4
         1.6.      DRAINAGE CONTROL                                                                                                                                                                                        4
                   1.6.1.       CLEAN WATER DIVERSION                                                                                                                                                                      5
                   1.6.2.       DIRTY WATER DRAINAGE                                                                                                                                                                       5
         1.7.      SEDIMENT CONTROL.                                                                                                                                                                                       5
         1.8.      EROSION CONTROL                                                                                                                                                                                         5
2        SITE DESCRIPTION                                                                                                                                                                                                  6
         2.1.      LOCATION AND OPERATIONS                                                                                                                                                                                 6
         2.2.      TOPOGRAPHY                                                                                                                                                                                              6
         2.3.      CLIMATE                                                                                                                                                                                                 7
         2.4.      MASTERPLAN                                                                                                                                                                                              7
3        EXISTING STORMWATER MANAGEMENT                                                                                                                                                                                    9
         3.1.      RECOMMENDATIONS FOR CURRENT STORMWATER MANAGEMENT                                                                                                                                                       9
4        PROPOSED STORMWATER MANAGEMENT                                                                                                                                                                                    10
         4.1.      SOUTHERN CATCHMENT (SW5)                                                                                                                                                                                10
         4.2.      NORTHERN CATCHMENT (SW2 & SW4)                                                                                                                                                                          10
                   4.2.1.       MANAGEMENT OF NUTRIENTS FROM GREEN WASTE AREA                                                                                                                                              12
                   4.2.2.       DETAILED DESIGN                                                                                                                                                                            12
5        SITE INSPECTION AND MONITORING                                                                                                                                                                                    13
6        REFERENCES                                                                                                                                                                                                        14
APPENDIX A STORMWATER STAGING AND OPTIONS PLANS                                                                                                                                                                            15
APPENDIX B SW5 DESIGN REPORT                                                                                                                                                                                               16
APPENDIX C CONCEPT EROSION AND SEDIMENT CONTROL PLAN                                                                                                                                                                       17
APPENDIX D SW2 HES BASIN CONCEPT SIZING                                                                                                                                                                                    18




TABLE OF FIGURES
FIGURE 1 - SITE LOCALITY PLAN (SOURCE GOOGLE) ...................................................................................................................................................................... 1
FIGURE 2 – AERIAL PHOTOGRAPHY AND DISTURBED AREAS (SOURCE: NEARMAPS, IMAGE DATE 13-11-21) ..............................................................6
FIGURE 3 –AVERAGE ANNUAL RAINFALL FOR EUMUNDI CRESCENT ROAD ......................................................................................................................... 7
FIGURE 4 – MASTERPLAN YEARS 1-5 (SOURCE: ATC WILLIAMS) ................................................................................................................................................. 7
FIGURE 5 – MASTERPLAN YEARS 6-10 (SOURCE: ATC WILLIAMS) ..............................................................................................................................................8
FIGURE 6 – EXISTING DRAINAGE REGIME...........................................................................................................................................................................................9
FIGURE 7 – EXISTING HES BASIN OUTLET AND FLOOD LEVELS ................................................................................................................................................ 10
FIGURE 8 – NORTHERN OUTFLOWS (PROPOSED HES BASIN) ....................................................................................................................................................11
FIGURE 9 – PROPOSED HES BASIN OUTLET AND FLOOD LEVELS ............................................................................................................................................ 12
FIGURE 10 – FLOATING WETLAND INSTALLED AT SCC LANDFILL ............................................................................................................................................ 12


TABLE OF TABLES
TABLE 1 – SURFACE WATER RELEASE LIMITS .....................................................................................................................................................................................3




Environment. Engineering. Education.                                                                                                                                                                                           PAGE ii

Page 3

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



1                INTRODUCTION
Topo was engaged by Noosa Shire Council (NSC) to prepare a Stormwater Management Plan (SMP) for the Noosa
Landfill. The site is located on Eumundi-Noosa Road as illustrated in Figure 1.

The site currently operates under the Environmental Authority Permit No. EPPR01855314 and is licensed to carry out the
following environmentally relative activities (ERA):

       +      ERA 33 – Crushing, milling, grinding or screening > 5000t per year
       +      ERA 60-(1a) – Waste disposal facility < 50,000t/yr




Figure 1 - Site Locality Plan (Source Google)

1.1.                OBJECTIVE & SCOPE

The objective of this report is to provide an Operational Stormwater Management Plan for the developed Master Plan
and construction staging. The Masterplan includes the augmentation of existing landfill cells as well as the construction
of new cells within the landfill site. Further details are provided throughout this report.

The objective of this SMP is to:

       +      Develop a formalised drainage and sediment control strategy that complies with the requirements of the
              Guideline Stormwater and environmentally relevant activities (DES, 2021), and the Environmental Authority Permit
              No. EPPR01855314

This report addresses surface water only and does not include the management of groundwater or leachate.

Environment. Engineering. Education.                                                                                   PAGE 1

Page 4

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



1.2.                GUIDELINES

This SMP has been prepared in accordance with:

       +      Guideline Stormwater and environmentally relevant activities (DES, 2021)
       +      Best Practice Erosion and Sediment Control (IECA, 2008), and
       +      Queensland Urban Drainage Manual (QUDM) (IPWEAQ, 2016)

In addition to these documents, reference has been made to the Noosa Landfill – Operational Phase Stormwater
Management Plan prepared by O2 (O2, 2013).

1.3.                LEGAL REQUIREMENTS

Stormwater runoff has the potential to cause water contamination and/or environmental harm and is regulated under
the EP Act. Some of the key legal requirements relevant to the operation of the landfill include:

       +      Where stormwater conditions appear on an environmental authority, it is an offence under s.430 of the EP Act,
              to not comply with the conditions of approval. This includes anyone operating under the environmental
              authority e.g. contractors, consultants etc.
       +      Causing serious or material environmental harm is an offence under s.437 and s.438 of the EP Act respectively.
       +      It is an offence to cause an environmental nuisance under s.440. Environmental nuisance is unreasonable
              interference with an environmental value. It may also include an unhealthy, offensive or unsightly condition
              because of contamination.
       +      Under s.440ZG it is an offence to unlawfully deposit a prescribed water contaminant to waters. The most
              common prescribed contaminants resulting from poor stormwater management of ERA operations are:
                   o o chemical, or chemical waste
                   o ashes, clay, gravel, sediment, stones and similar organic or inorganic matter
                   o building and construction materials
                   o building, construction and demolition waste
                   o industrial waste
                   o oil
                   o putrescible waste, and
                   o waste water.
       +      Under s.319 an obligation is placed upon all persons in Queensland who are carrying out activities which may
              cause environmental harm to comply with the ‘general environmental duty’. This requires that all reasonable
              and practicable measures must be adopted to prevent and minimise environmental harm. Although not being
              able to demonstrate compliance against the general environmental duty is not an offence, demonstrating that
              all reasonable and practicable measures have been adopted is a defence for offences such as water
              contamination (DES, 2021).




Environment. Engineering. Education.                                                                                 PAGE 2

Page 5

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



1.4.                LICENSE CONDITIONS AND WATER QUALITY OBJECTIVES

The following conditions specified by the site permit (Permit No. BRID0056) relate, directly or indirectly, to the
management of stormwater:

WT1 – Site erosion protection measures and sediment control measures must be implemented and must have the
hydraulic effectiveness to treat stormwater for 90% of the annual runoff for each stormwater catchment.

Where soils are temporarily exposed for the construction of new facilities or to facilitate changes in landfill design, all
reasonable and practical measures must be implemented to minimise the amount of sediments able to discharge from
the site. As a minimum the following design criteria apply:

       1.     Collect and drain stormwater from disturbed soils to a sediment basin sized to contain an 80 th% five-day event
              or similar; and
       2.     The design life and design storm for temporary drainage works to convey waters to the sediment basin and
              around disturbed areas are:
                   a. Disturbed area open < 12 months – 1 in 2-year ARI event plus 150mm freeboard
                   b. Disturbed area open 12-24 months – 1 in 5-year ARI event plus 150mm freeboard
                   c. Disturbed area open > 24 months – 1 in 10-year ARI event plus 150mm freeboard
                   d. Temporary culvert crossing – minimum 1 in 1-year ARI hydraulic capacity

WT2 - The release of collected and treated stormwater to waters, from areas of the site not likely to be contaminated
with waste materials, must be in accordance with Table 2 – compliance limits for controlled releases of treated stormwater
to surface waters

              Note: Table 2 is reproduced below as Table 1.

Table 1 – Surface Water Release Limits

          QUALITY
                                       RELEASE POINT        RELEASE LIMIT           LIMIT TYPE               MONITORING FREQUENCY
       CHARACTERISTICS

                   pH                                           6.5 - 9.0              Range

      Specific Conductance
                                                                  1500               Maximum           Commencement of Release then weekly
             (µS/cm)
                                                                                                         thereafter. If no release occurs, no
    Dissolved Oxygen (mg/L)                                         6                Minimum                   sampling is required.
       Total and Dissolved
                                                                  N/A                Maximum
        Aluminium (mg/L)

                                                                                                       Commencement of Release then weekly
                                             W1                                                          thereafter for a minimum of 5 events
                                                                                                        and until a reliable TSS:NTU correlation
    Suspended Solids (mg/L)                                        50
                                                                                                        is established and agreed in writing by
                                                                                                       the administering authority. If no release
                                                                                                            occurs, no sampling is required.

                                                             The established       The NTU value
                                                              correlation of      that correlates to   Commencement of Release then weekly
            Turbidity (NTU)                                turbidity with total   50mg/L TSS with        thereafter. If no release occurs, no
                                                            suspended solids       a correlation R             sampling is required.
                                                                  (TSS)              value of 0.9




WT3- Monitoring of contaminant releases from release point W1 must be undertaken in accordance with the condition
WT2.

WT4 - In addition to WT2, released to waters must not:

       1.     have any other properties and content concentration causing environmental harm
       2.     produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or
              other visually objectionable matter.




Environment. Engineering. Education.                                                                                                      PAGE 3

Page 6

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



1.5.                PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE

Ongoing soil and water management will be required through the life of the project. The three cornerstones of the
erosion and sediment control industry are drainage control, erosion control, and sediment control. The primary function
of each of these principles is summarised below:

       +      Drainage control measures aim to prevent or reduce soil erosion caused by concentrated flow-including the
              management of rill and gully erosion and to appropriately manage the movement of "clean" and "dirty" water
              through the site.
       +      Erosion control measures aim to prevent or reduce soil erosion caused by raindrop impact and sheet flow (i.e.
              the control of splash and sheet erosion)
       +      Sediment control measures aim to trap and retain sediment either moving along the land surface (bed load) or
              contained within flowing water (suspended sediment) (IECA, 2008).

The proper management of stormwater is critical to the implementation of effective erosion and sediment control. The
effective management of stormwater lies in the appropriate control of runoff velocities and volume.

1.6.                DRAINAGE CONTROL

The primary function drainage controls are to:

       +      minimise the risk of rill and gully erosion;
       +      minimise the risk of hydraulic damage to the adopted erosion and sediment control measures;
       +      control the velocity, volume and location of water flow through the site; and
       +      appropriately manage the movement of "clean" and "dirty" water through the site (IECA, 2008).

The Guideline - Stormwater and environmentally relevant activities (DES, 2021) requires that high erosion hazard sites
implement the following design and management measures:

       +      Erosion protection and sediment control measures should be installed and maintained for all stages of the
              activity to minimise erosion and the release of sediments.
       +      All areas of soil disturbed and exposed should be managed to minimise the loss of sediment through
              revegetation and/or use of other stabilisation techniques.
       +      All concentrated stormwater flows (including ‘clean’ stormwater and ‘dirty’ stormwater) should have
              concentrated flow paths, such as drainage lines, diversion drains, channels and batter chutes (where applicable)
              which have been designed, constructed, effectively armoured and maintained to convey the runoff from events
              up to and including the average recurrence interval (ARI) of:
                   o 1 in 10 year critical duration ARI storm event without causing water contamination, sheet, rill or gully
                        erosion, sedimentation, or damage to structures or property.
       +      Stormwater runoff from external or undisturbed catchments should be diverted around or away from disturbed
              areas as much as possible.
       +      Sediment basin(s) should be installed and maintained to collect and treat stormwater runoff from all disturbed
              areas of the site(s) approved as part of the ERA application, and areas in which any earthen material is stored.
       +      For events up to and including a 24 hour storm event with an ARI of 1 in 10 years, the following must be achieved
                   o a sediment basin must be designed, constructed and operated to retain the runoff at the site(s)
                        approved as part of the ERA application;
                   o the release stormwater from these sediment basins must achieve a total suspended solids (TSS)
                        concentration of no more than 50mg/L for events up to and including those mentioned above.

              For events larger than those stated above, all reasonable and practical measures must be taken to minimise the
              release of prescribed contaminants.

              An alternative basin design (such as a high efficiency basin) can be used provided it has been demonstrated
              that the contaminant load to be released to the receiving environment for the life of the project will be equal to
              or less than the standard design.

              The department supports high efficiency basin technology especially as it may lead to both flexibility
              for the site operator and if appropriately designed and managed, sound environmental outcomes.

       +      All sediment basins should have a spillway, designed, constructed and effectively armoured to convey
              anticipated flows. Design for a 50 year ARI critical event is considered a minimum.
       +      Any sediment basin designed in accordance with this list must be operated in such a manner that within 120
              hours of the most recent rainfall event, the required design capacity of the upper settling volume is available for
              capture and storage of stormwater runoff from the next rainfall event.

Environment. Engineering. Education.                                                                                      PAGE 4

Page 7

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



       +      In addition to the settling volume requirements, sediment basins should be designed with a sediment storage
              zone equal to 50% of the upper settling volume, or the volume of the sediment determined by estimating the
              expected sediment runoff volumes over the desired maintenance period of not less than 4 months.

1.6.1.           CLEAN WATER DIVERSION
A key component of managing surface waters is the diversion of ‘clean’ runoff away from disturbed portions of the site.
Clean water is defined as water that either enters the property from an external catchment and has not been further
contaminated by sediment within the site, or water that has originated from the site and is of such quality that it does
not need to be treated in order to achieve the required water quality standard, or would not be further improved if it
was to pass through a sediment trap (IECA, 2008).

In diverting clean water around the disturbed portions of the site, it will remain separated from the sediment laden runoff
that requires treatment. It is important that clean water diversion drains are constructed prior to new areas being
disturbed to reduce the likelihood of runoff being contaminated. This management technique has the potential to
greatly reduce the size and operational costs of treatment devices. The clean water drains should be designed to convey
runoff associated with the 10 % Annual Exceedance Probability (AEP) event, in accordance with the Guideline Stormwater
and environmentally relevant activities (DES, 2021).

1.6.2.           DIRTY WATER DRAINAGE
Dirty Water Drains (DWD) and diversion bunds are required to convey sediment laden runoff from disturbed areas to
the sediment basin. The dirty water drains will also be designed to convey runoff associated with the 10 year ARI critical
duration event, in accordance with the Guideline Stormwater and environmentally relevant activities (DES, 2021).

1.7.                SEDIMENT CONTROL.

To achieve the required release criteria, treatment of dirty site runoff will be required in a Type 1 treatment system. In
accordance with the site permit (Permit No. BRID0056), sediment control measures must be implemented and must have
the hydraulic effectiveness to treat stormwater for 90% of the annual runoff for each stormwater catchment.

1.8.                EROSION CONTROL

Erosion control measures aim to prevent or reduce soil erosion caused by raindrop impact and sheet flow. One of the
most effective forms of long term erosion control is the stabilisation of disturbed areas. Where possible, progressive
stabilisation and revegetation of the non–operational areas must be undertaken. If an area is to be non–operational for
only a short duration, temporary measures (such as mulch/compost blankets or jute matting) must be applied.
Temporary stabilisation should also be provided as works are progressing towards the final level, and this can be achieved
through the application of soil binders. Stabilisation of high traffic areas should also be provided, particularly at the truck
unloading points. Stabilisation can be achieved using a layer of crushed concrete, ideally 150 – 200 mm thick or gravel.




Environment. Engineering. Education.                                                                                   PAGE 5

Page 8

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



2                SITE DESCRIPTION
2.1.                LOCATION AND OPERATIONS

The Noosa Landfill is located on Eumundi-Noosa Road, Doonan and undertakes a range of waste processing and
resource recovery operations over the site. A portion of the site is finished landfill and has a vegetated surface. Activities
across the site include:

       +      waste collection,
       +      resource recovery,
       +      concrete crushing/recycling,
       +      green waste recovery and processing, and
       +      oil and paint collection.

The site activities and disturbed areas, as of the 13th November 2021 are illustrated in Figure 2.




                                                              Bio Basin


                                                                          Green Waste
                       Site Entry                                          Processing
                                                  HES Basin

                                       Resource
                                       Recovery            Concrete
                                                          Processing
                          Weighbridge




                                                                                         Cell 2.2 -
                                                                                        operational




Figure 2 – Aerial Photography and Disturbed Areas (Source: NearMaps, image date 13-11-21)

2.2.                TOPOGRAPHY

The topography varies considerably across the site due to historic landfilling operations. The peak elevations across the
site occur in the central portion of the site (Cell 1.1). All runoff from site is directed to the northern and north-eastern
boundary to discharge points SW2, SW4 and SW5. Details on the existing catchments and flowpaths are provided in
Appendix A with further details provided in Section 3.




Environment. Engineering. Education.                                                                                  PAGE 6

Page 9

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



2.3.                CLIMATE

The Bureau of Meteorology (BOM) provides average annual rainfall data for the Eumundi-Crescent Road, Gauging
Station 040157. Based on this data, the average annual rainfall is 1,677 mm. Rainfall has a distinctly seasonal pattern,
with the majority of fall occurring between December and May. The average annual rainfall records are illustrated in
Figure 3.




                                       Figure 3 –Average Annual Rainfall for Eumundi Crescent Road

2.4.                MASTERPLAN

A masterplan has been prepared by ATC Williams for the Noosa landfill. Works are detailed for Years 1-5 and Years 6-10
in Figures 4 and 5.




Figure 4 – Masterplan Years 1-5 (Source: ATC Williams)



Environment. Engineering. Education.                                                                             PAGE 7

Page 10

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN




Figure 5 – Masterplan Years 6-10 (Source: ATC Williams)

Works for Years 1 to 5 include:

       +      Ongoing Cell 2.2 operations
       +      Cell 1.1 Expansion
       +      Southern Clean Water Drain
       +      SW5 HES basin
       +      Cell 1.1 Batter Capping Works
       +      Construction of Cell 3.2 & 3.3 (detailed as Cell 2.3 in Figure 4)
       +      Construction of Cell 3.4 (detailed as Cell 2.4 in Figure 4)
       +      Filling of Redevelopment Area for Green waste and Concrete Crushing

This report has been prepared for the works to be undertaken in Years 1 to 5. Although works to be undertaken between
Years 6 to 10 have been investigated in determination of control measures, it is recommended a revision to this document
be undertaken prior to these works.




Environment. Engineering. Education.                                                                             PAGE 8

Page 11

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



3                EXISTING STORMWATER MANAGEMENT
Based on discussion with site personnel, the site currently operates in the following manner:

       1.     Southern Catchment (SW5) – minimal disturbance and no sediment control prior to release (operating as a
              stable catchment)
       2.     Cell 2.2 (active cell) – Captured in-situ and directed to Leachate system
       3.     Northern Catchment:
                   a. Portion directed to HES basin
                   b. Portion directed to Bio Basin (Green Waste)
                   c. Portion directed off-site as clean water

For further details relating to the existing drainage refer to Figure 6 and Appendix A.




Figure 6 – Existing Drainage Regime

3.1.                RECOMMENDATIONS FOR CURRENT STORMWATER MANAGEMENT

The HES basin was designed in 2010 by Opus for a catchment size of 3.6 hectares. The current catchment that is estimated
to be draining to the basin is 3.9 hectares being within 10% of the design catchment. It is recommended that monitoring
is undertaken on the basin to ensure adequate performance with the current catchment draining to the basin.

Two assumptions have been made in relation to the catchment draining to the HES basin:

       1.     A pipe from Cell 1.1 is blocked to limit inflows to the HES basin. This was a recommendation from the 2013 O2
              Report to be implemented once the catchment was stabilised (it is currently grassed). Some drainage
              augmentation may be required to ensure the drain can flow to the desired clean water culvert. Refer to
              Appendix A, Drawing Concept-09 for details
       2.     Stabilise the portion of the Existing landfill Cell 1.1/2.1 currently grading to the HES basin and divert the flows to
              SW4 once stable. Refer to Appendix A, Drawing Concept-01 for catchment details and Concept-09 and
              Concept-10 for flow paths. This will reduce the catchment to HES basin below the design catchment.

In addition to augmenting drainage, any catchments that are outside of those being directed to the HES basin or bio-
basin should be operating on a capture or erosion control (stabilisation) strategy. It is also recommended that a frog flap
be investigated for the outlet of the pipe from the HES basin due to flood levels.


Environment. Engineering. Education.                                                                                        PAGE 9

Page 12

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



4                PROPOSED STORMWATER MANAGEMENT
This Operational Stormwater Management Plan has been prepared to detail proposed control measures and drainage
staging for future masterplanned works on site. For the purpose of this report, the works have been divided into two
main catchments:

       +      Southern Catchment – Proposed Clean water drain and HES basin at the revised SW5 location
       +      Northern Catchment – SW4 and SW2 with the proposed HES basin and drainage augmentation

4.1.                SOUTHERN CATCHMENT (SW5)

Works occurring in the southern catchment include:

       +      Ongoing Cell 2.2 operations
       +      Cell 1.1 Expansion
       +      Southern Clean Water Drain
       +      SW5 HES basin
       +      Construction of Cell 3.2 & 3.3

Detailed design has been undertaken for the Clean Water Drain and HES basin, along with Staging Plans, a Design Report
and a Concept Erosion and Sediment Control Plan for staging of construction works. Refer to Appendix B for the Design
Report which includes details on the staging plans, HES basin sizing and clean water drain sizing, and Appendix C for
the Concept Erosion and Sediment Control Plan for construction works stormwater management.

4.2.                NORTHERN CATCHMENT (SW2 & SW4)

Works occurring in the northern catchment include:

       +      Cell 1.1 Batter Capping Works
       +      Construction of Cell 3.4
       +      Filling of Redevelopment Area for Green waste and Concrete Crushing

Proposed stormwater management strategies for the Cell 1.1 Batter Capping Works are provided in Appendix C in the
Concept Erosion and Sediment Control Plan. Due to the lack of space on the northern capping works, use of the HES
basin would be the preferred management approach, however, this would exceed the design catchment unless the Cell
1.1/2.1 catchment currently grading to the HES basin can be stabilised and diverted prior to works (refer to Section 3.1).

Multiple options exist in regards to augmentation of the existing HES basin in conjunction with filling of the
redevelopment area and construction of Cell 3.4. These options are provided below based on discussions with NSC and
provided in Appendix A:

       1.     Widen Existing HES basin.

The current HES basin outlet is well below flood levels (provided by NSC) in the adjoining drainage channel creating
inflows to the HES basin outlet and limiting discharge from the outlet pipe. This is exacerbated due to a high point in
the downstream drainage channel.




Figure 7 – Existing HES Basin Outlet and Flood Levels

Environment. Engineering. Education.                                                                               PAGE 10

Page 13

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



Due to the constraints around the flood levels and outlets, it is not recommended to augment the existing basin w hich
has a piped outlet and spillway below the Q2 flood level.

A concept of this approach is provided in Appendix A, Drawing Concept-06 for the ultimate catchment. The approach
would also require filling of the northern portion of the pad to grade back to the basin inflow.

       2.     Construct New HES Basin

Based on discussions with NSC, the preferred location for a new basin would be in the north-western corner of the pad,
being where the proposed filling is to occur. Two options for the direction of the basin are provided in Appendix A,
Drawing Concept-06 and Concept-07.

There are two main options in regards to levels for the HES basin:

       +      Design the piped outlet and spillway above nominated flood level (e.g. Q10)
       +      Design the spillway only above nominated flood level (e.g. Q10), with the piped outlet below flood levels and to
              include a frog flap to prevent backflows

Based on Figure 8, the ideal outlet location is along the northern boundary to prevent choked flows in the drainage
channel and existing high point to the west. An outlet along the northern boundary could be approximately RL 11.75.
The flood levels in this vicinity are approximately RL 12.50 (Q10).

Early discussions indicated the preference to locate the basin on the north-eastern corner of the pad. As the outlet
location here is approximately 2m higher than the proposed outlet, this location would require an additional 2m of fill
on the pad to achieve an outlet from the basin. As the pad level is governed by the outlet level and not the Minimum
Floor Levels, it is recommended that the lowest achievable outlet location be adopted to reduce fill requirements. Due
to the sensitivity of the outlet level, additional detailed survey is recommended along the northern boundary in the outlet
location.




Figure 8 – Northern Outflows (Proposed HES Basin)




Environment. Engineering. Education.                                                                                   PAGE 11

Page 14

R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN




Figure 9 – Proposed HES Basin Outlet and Flood Levels

With a Q10 flood level of RL 12.50, the emergency spillway would be required to be as a minimum RL 12.50. To achieve
fall in the outlet channel to the low levels on the northern boundary, the piped outlet would be required to be above
approximately RL 12.1. The outlet pipe could be set at a minimum of RL 12.1 to minimise fill required on the pad. A frog
flap would be required to be installed on the outlet to limit backflows during flood events, however, the basin would still
be operational during these events with outflows able to occur over the spillway (above the flood event) with settling
occurring in the basin. If this does not occur another 0.5m of fill will be required across the entire pad.

Based on a basin settling depth of 1.2m and piped outflow of RL 12.1, the emergency spillway would be approximately
13.3, with an inflow at approximately RL 13.9 to allow for fall through the basin and inlet channel. Pad levels would be
required to be above RL 14.0 to ensure fall to the basin. Where drains are used instead of bunds to direct flow to the
basin (recommended to avoid ponding on pads), additional fill would be required to achieve fall and freeboard within
drainage channels.

Details on the SW2 HES basin sizing are provided in Appendix D.

4.2.1.           MANAGEMENT OF NUTRIENTS FROM GREEN WASTE AREA
The current arrangement on site is to utilise a bio-retention basin to treat runoff from the Green Waste Area. To avoid
construction of a bio-retention basin and a HES basin, the use of a floating wetland could be trialled in the end of the
HES basin. Sunshine Coast Council are currently trialling this at their facilities and should be contacted prior to proceeding
to design.




Figure 10 – Floating Wetland installed at SCC landfill

4.2.2.           DETAILED DESIGN
Detailed design of the proposed HES basin and drainage will be required in consultation with NSC once pad layout and
levels have been determined. This options provided for the SW2 augmentation in this report are concept only to provide
guidance around potential options.

Environment. Engineering. Education.                                                                                  PAGE 12

Page 15

R0386A: NAMBOUR LANDFILL - STORMWATER MANAGEMENT PLAN




5                SITE INSPECTION AND MONITORING
Site inspections and monitoring is to be undertaken as detailed below.

SMPs should be considered live documents that in some instances will require review and updating as site conditions
change, or if the adopted measures fail to achieve the required treatment standard.

When a site inspection detects a notable failure in the adopted drainage or other ESC measures, the source of this failure
must be reported, investigated and appropriate amendments made.

Best practice site management requires all ESC measures to be inspected at the following frequencies and include the
following checks as a minimum:

Daily site inspections (during rainfall)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      All site discharge points (including dewatering activities as appropriate)
Weekly site inspections (even if work is not occurring on-site)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
              movements
       +      Oil, fuel and chemical storage facilities
Following runoff producing rainfall (within 18 hours of rainfall event)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
              movements




Environment. Engineering. Education.                                                                                  PAGE 13

Page 16

R0386A: NAMBOUR LANDFILL - STORMWATER MANAGEMENT PLAN




6                REFERENCES
DES, 2021. Stormwater Guideline: Environmentally Relevant Activities, Brisbane: Department of Environment and Heritage.

IECA, 2008. Best Practice Erosion and Sediment Control. Picton, NSW: International Erosion Control Association
(Australasia).

IPWEAQ, 2016. Queensland Urban Drainage Manual (Fourth Edition), Brisbane: Institute of Public Works Engineering
Australasia, Queensland Division.

O2, 2013. Noosa Landfill - Operational Phase Stormwater Management Plan, Sunshine Coast: O2.




Environment. Engineering. Education.                                                                            PAGE 14

Page 17

R0386A: NAMBOUR LANDFILL - STORMWATER MANAGEMENT PLAN




APPENDIX A
STORMWATER STAGING AND OPTIONS PLANS




Environment. Engineering. Education.                    PAGE 15

Page 18

                                                                                                                                                                                                                                                                LEGEND

                                                                                                                                                                                                                                                                                   EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                   CATCHMENT BOUNDARY


                                                                                                                                                                                                                                                                         1         CATCHMENT LABEL

                                                      SW2 OUTLET
                                                                                                                                  SW4 OUTLET                                                                                                                                       FLOW DIRECTION


                                                                                   BIO                                                                                                                                                                                             FLOWPATH


                                                                                                                                                                                                                                                                                   PROPERTY BOUNDARY




                                  OFFICE
                                  POND                                                                                  SW4




                                                                                                         SW4                                     BYPASS -
                                                                                                                                                  STABLE




                                                                    CLEAN -
                                                                                                                           HES
                                                                   INTERNAL
                                                                                                                          BASIN


                                                                                                                                                                                                           SW5 OUTLET




                                                                                                                                   CELL 2.2 TO
                                            CLEAN -                                                                                LEACHATE
                                           EXTERNAL




                                                                                                                                                                              SW5




                                                                                                                                                                                                 CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                                        KR        20/09/21     0                    80                                                  COPYRIGHT C                               NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                         KR        03/06/21                                                                          TOPO GROUP PTY LTD
                                                                                                                                                                                                 DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                              KR        12/04/21
                                                                                                    SCALE 1:4000                                            THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                       CONCEPT STORMWATER STAGING
                                                                                                                                   ISSUED FOR USE           TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS                                   KR        10/12/21                                                                   MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                 RPEQ / SIGNATURE (IF REQUIRED)                                                OVERALL CATCHMENT PLAN
                                                                                            NORTH
                                                                                                                   A3                                       THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                   DRAWING No          REVISION
REVISION   DESCRIPTION                                             APPROVED BY   DATE                                                                                     PTY LTD.                                                                                       20-0211            CONCEPT-01         E

Page 19

                                                                                                                                                                                                                                                       LEGEND

                                                                                                                                                                                                                                                                               EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                               CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                               CATCHMENT TO CWD


                                                                                                                                                                                                                                                               1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                               FLOW DIRECTION

                                                                                                                                                                                                                                                                               EXISTING FLOWPATH

                                                                                                                                                                                                                                                                               CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                               DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                               PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                                  ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                               AREA TO BE STABILISED




                                                                                                                                          CELL 2.2 DIRECTED TO LEACHATE UNTIL AREAS CAN
                                                                                                                                          GRADE OUT (LIKELY CROSS-OVER WITH EXPANSION
                                                                                                                                          AS SHOWN IN STAGE 2)




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                             PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                          CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                               INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                        CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                        (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS                               KR            10/12/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                      STAGE 1
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                       20-0211               CONCEPT-02                  E

Page 20

                                                                                                                                                                                                                                                   LEGEND

                                                                                                                                                                                                                                                                           EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                           CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                           CATCHMENT TO CWD


                                                                                                                                                                                                                                                           1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                           FLOW DIRECTION

                                                                                                                                                                                                                                                                           EXISTING FLOWPATH

                                                                                                                                                                                                                                                                           CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                           DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                           PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                              ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                           AREA TO BE STABILISED




                                                                                                                                          CELL 1.1 AND 2.2 TO BE EXPANDED. UNTIL WASTE IS
                                                                                                                                          ABOVE SURROUNDING GROUND LEVEL, CAPTURED
                                                                                                                                          RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                            FINAL / TEMPORARY DRAINAGE                                                                                        PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                       REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                      CATCHMENT TO BASIN - 4.0 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                           INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                    CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                    (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS                               KR            10/12/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 2
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-03                  E

Page 21

                                                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                              CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                              CATCHMENT TO CWD


                                                                                                                                                                                                                                                              1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                              FLOW DIRECTION

                                                                                                                                                                                                                                                                              EXISTING FLOWPATH
                                                                                                                                                                                           CELL 3.2 & 3.3 BEING CONSTRUCTED AND SELF
                                                                                                                                                                                           CONTAINED (NO FLOW TO BASIN). CAPTURED
                                                                                                                                                                                           RUNOFF CAN BE PUMPED TO HES BASIN                                                  CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                              DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                              PROPERTY BOUNDARY

                                                                                                                                                                                                                                                                              ACTIVE AREA

                                                                                                                                                                                                                                                                              AREA TO BE STABILISED




                                                                                                                                         CELL 1.1 AND 2.2 TO
                                                                                                                                                          CAPACITY
                                                                                                                                                             BE EXPANDED.
                                                                                                                                                                   REACHEDUNTIL WASTE IS
                                                                                                                                         AND BEING
                                                                                                                                         ABOVE  SURROUNDING
                                                                                                                                                    CAPPED ANDGROUND
                                                                                                                                                                 LANDSCAPED
                                                                                                                                                                       LEVEL, CAPTURED
                                                                                                                                         RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                            PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                         CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                              INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                        CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                       CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                       (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                                CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                         COPYRIGHT C                                  NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                      TOPO GROUP PTY LTD
                                                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR                KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS                               KR            10/12/21                                                              MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 3
                                                                                                 NORTH
                                                                                                                        A3                             THE WRITTEN CONSENT OF TOPO GROUP                    CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                PTY LTD.                                                                                       20-0211               CONCEPT-04                  E

Page 22

                                                                                                                                                                                                                         LEGEND

                                                                                                                                                                                                                                                 EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                 CATCHMENT TO BASIN


                                                                                                                                                                                                                                                 CATCHMENT TO CWD


                                                                                                                                                                                                                                 1               CATCHMENT LABEL


                                                                                                                                                                                                                                                 FLOW DIRECTION

                                                                                                                                                                                                                                                 EXISTING FLOWPATH
                                                                                                                                                              CELL 3.2 & 3.3 SPLIT INTO QUADRANTS.
                                                                                                                                                              ONCE FLOW CAN BE CONVEYED TO BASIN
                                                                                                                                                              A MAXIMUM OF TWO QUADRANTS                                                         CLEAN WATER DRAIN
                                                                                                                                                              CONVEYED TO BASIN. OTHER QUADRANTS
                                                                                                                                                              CAPTURED OR DIRECTED TO CLEAN                                                      DIRTY WATER DRAIN
                                                                                                                                                              WATER DRAINS - TO BE DETERMINED
                                                                                                                                                              THROUGH CELL 3.2 & 3.3 DETAILED DESIGN
                                                                                                                                                                                                                                                 PROPERTY BOUNDARY

                                                                                                                                                                                                                                                 ACTIVE AREA

                                                                                                                                                                                                                                                 AREA TO BE STABILISED




                                                                                                                CELL 1.1 AND 2.2 EXPANSION AREAS STABILISED
                                                                                                                AND DIRECTED TO CLEAN WATER DRAIN




                                                                                                                                                           NEW DIRTY WATER DRAIN
                                                                                                                                                           TO CONVEY ACTIVE RUNOFF
                                                                                                                                                           TO SEDIMENT BASIN




                                                TIEING IN CLEAN WATER DRAIN BATTER WITH
                                                CELL TRACK OR GRADING TRACK DRAIN INTO
                                                CLEAN WATER DRAIN WILL BE REQUIRED                                                                                                                                                                                  PROPOSED SEDIMENT BASIN




                                                                                                                                                                                                                                                     CATCHMENT TO BASIN - 4.5 HA


                                                                                                                                                                                                                                 INLET TO BASIN RL 21.1


                                                                                                                                                                                                           CLEAN WATER DRAIN




                                                                                                                                                                                                                                          CATCHMENT TO DRAIN - 6.2 HA
                                                                                                                                                                                                                                          (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                   CLIENT                                              PROJECT
   D       CELL NUMBER REVISION            KR         20/09/21            0                    40                                         COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT             KR         03/06/21                                                                        TOPO GROUP PTY LTD
                                                                                                                                                                   DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                  KR         12/04/21
                                                                                SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                    ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS       KR         10/12/21                                                                MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 4
                                                                        NORTH
                                                                                               A3                             THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                 APPROVED BY     DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-05                  E

Page 23

                                                                                                                                                                                                                                                                               LEGEND

                                                                                                                                                                                                                                                                                                       EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                                       CATCHMENT TO BASIN
                                                                                                      EXISTING BIO BASIN
                                                                                                                                                                                                                                                                                                       CATCHMENT TO BIO


                                                                                                                                                                                                                                                                                       1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                                                       FLOW DIRECTION

                                                                                                                                                                                                                                                                                                       EXISTING FLOWPATH

                                                                                                                                                                                                                                                                                                       CLEAN WATER DRAIN

FLOOD LEVELS PROVIDED BY NSC:
Q1 - 12.76                                                                                                                                                                                                                                                                                             DIRTY WATER DRAIN
                                                                       EXISTING HES BASIN                                          CATCHMENT TO BIO - 1.8 HA
Q2 - 12.79
Q10 - 12.92                                                                                                                                                                                                                                                                                            PROPERTY BOUNDARY
Q100 - 13.07
Q100 CC - 13.16                                                                                                                                                                                                                                                                                        ACTIVE AREA

                                                                                                                                                                                                                                                                                                       AREA TO BE STABILISED
  PIPED OUTLET RL 11.30
  EMERGENCY SPILLWAY RL 12.20                                                                                    INFLOW RL 12.50



                                                                       CATCHMENT TO BASIN - 3.9 HA

                                                                       BASIN DEISGNED FOR 3.6 HA
                                                                                                                                                                                                                                           ACCESS TRACK DRAINAGE
                                                                                                                                                                                                                                           AND SMALL SECTION OF CELL
                                                                                                                                                                                                                                           2.2 DIRECTED TO HES BASIN




                                                                                                                            PIPE TO BE BLOCKED AS PER O2 SMP




                                                                                                                                                                                                                                                                           AREA TO BE STABILISED




                                                                                                                                                                                                                       CLIENT                                                PROJECT
                                   D       CELL NUMBER REVISION                                      KR          20/09/21              0                    40                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                    NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                   C       FINAL DESIGN REPORT                                       KR          03/06/21                                                                TOPO GROUP PTY LTD
                                                                                                                                                                                                                       DRAWN                   DESIGNED      DATE            DRAWING TITLE
                                   B       NEW ATC DESIGN                                            KR          12/04/21
                                                                                                                                             SCALE 1:2000                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                      STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                 ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                   E       REVISION TO NORTH OPTIONS                                 KR          10/12/21                                                         MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                       RPEQ / SIGNATURE (IF REQUIRED)                                               CURRENT APPROACH
                                                                                                                                     NORTH
                                                                                                                                                            A3                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                PROJECT No                     DRAWING No            REVISION
                                REVISION   DESCRIPTION                                        APPROVED BY         DATE                                                                          PTY LTD.                                                                                     20-0211              CONCEPT-09           E

Page 24

                                                                                                                                                                                                                           LEGEND

                                                                                                                                                                                                                                                   EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                   CATCHMENT TO BASIN


                                                                                                                                                                                                                                                   CATCHMENT TO BIO

                                                                                          CATCHMENT - 5.6 HA                                                                                                                       1               CATCHMENT LABEL


                                                                                                                                                                                                                                                   FLOW DIRECTION

                                                                                                                                                                                                                                                   EXISTING FLOWPATH

                                                                                                                                                                                                                                                   CLEAN WATER DRAIN


                                                                                                                                               REDIRECT DRAIN TO                                                                                   DIRTY WATER DRAIN
                                                                                                                                               DISCHARGE AT SW4 ONCE
                                                                                                                                               CATCHMENT IS STABILISED                                                                             PROPERTY BOUNDARY


                                                     REFER TO D12A,D12B,D12C & D13                                                                                                                                                                 ACTIVE AREA
                                                     FOR PAD WATER QUALITY OPTIONS
                                                                                                                                                                                                                                                   AREA TO BE STABILISED




                                                                                                                                                                     CELL 2.4 NOT UNDER
                                                                                                                                                                     CONSTRUCTION




                                                                     PIPE TO BE BLOCKED AS PER O2 SMP




                                                                                                                                                                     CLIENT                                              PROJECT
   D       CELL NUMBER REVISION            KR             20/09/21           0                    40                                       COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT             KR             03/06/21                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                     DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                  KR            12/04/21
                                                                                   SCALE 1:2000                                 THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                               ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS       KR            10/12/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                     RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 1
                                                                           NORTH
                                                                                                  A3                            THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                     DRAWING No            REVISION
REVISION   DESCRIPTION                 APPROVED BY        DATE                                                                                PTY LTD.                                                                                   20-0211              CONCEPT-10           E

Page 25

                                                                                                                                                                                                                           LEGEND

                                                                                                                                                                                                                                                   EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                   CATCHMENT TO BASIN


                                                                                                                                                                                                                                                   CATCHMENT TO BIO

                                                                                          CATCHMENT - 7.3 HA                                                                                                                       1               CATCHMENT LABEL


                                                                                                                                                                                                                                                   FLOW DIRECTION

                                                                                                                                                                                                                                                   EXISTING FLOWPATH

                                                                                                                                                                                                                                                   CLEAN WATER DRAIN

                                                                                                                                                                                                                                                   DIRTY WATER DRAIN

                                                                                                                                                                                                                                                   PROPERTY BOUNDARY
                                                                                                                                            NEW CLEAN WATER DRAIN - IF NOT PIPED, CELL 2.4 DRAINAGE
                                                     REFER TO D12A,D12B,D12C & D13                                                          WOULD NEED TO BE CONVEYED OVER OPEN DRAIN. ESTIMATED                                                   ACTIVE AREA
                                                     FOR PAD WATER QUALITY OPTIONS                                                          AT 900mm RCP TO CONVEY 10 YEAR ARI UNDER PAD
                                                                                                                                                                                                                                                   AREA TO BE STABILISED




                                                                                                                                                                     CELL 2.4 ACTIVE - NOTE: UINTIL CELL IS ABOVE GROUND IT WILL
                                                                                                                                                                     NOT GRADE TO RRC PAD AND WILL BE MANAGED VIA LEACHATE
                                                                                                                                                                     OR CLEAN WATER PUMP OUT IF CELL IS SEGMENTED




                                                                     PIPE TO BE BLOCKED AS PER O2 SMP


                                                                                                                                                                                                                    BLOCK CULVERT AND DIRECR
                                                                                                                                                                                                                    RUNOFF ALONG ACCESS -
                                                                                                                                                                                                                    AUGMENT AS REQUIRED




                                                                                                                                                                     CLIENT                                              PROJECT
   D       CELL NUMBER REVISION            KR             20/09/21           0                    40                                       COPYRIGHT C                               NOOSA SHIRE COUNCIL                   NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT             KR             03/06/21                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                     DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                  KR             12/04/21
                                                                                   SCALE 1:2000                                 THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                               ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS       KR             10/12/21                                                              MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                     RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 2
                                                                           NORTH
                                                                                                  A3                            THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                     DRAWING No            REVISION
REVISION   DESCRIPTION                 APPROVED BY        DATE                                                                                PTY LTD.                                                                                   20-0211              CONCEPT-11           E

Page 26

OPTION A - WIDEN EXISTING HES BASIN AND KEEP THE SAME LEVELS
                                                                                                                                                                                                                                                                                                                        LEGEND
NOTE - THIS OPTION IS NOT RECOMMENDED DUE TO OUTLET ISSUES DUE TO
HIGH POINT IN DOWNSTREAM DRAINAGE CHANNEL AND FLOOD LEVELS                                                                                                                                                                                                                                                                                      EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                                                                                CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                                                                                                HES BASIN


                                                                               X                                                                                                                                                                                                                                                                BIO BASIN
                                                                             RL 11.5
                                                                                                                                                                                                                                                                                                                                                FLOW DIRECTION

                                  X                                                                                                                                                                                                                                                                                                             EXISTING FLOWPATH
                                RL 12.5
                                                                                                                                                        X                                                                                                                                                                                       CLEAN WATER DRAIN
                                                                                                                                                      RL 13.5
                                                                                                                                                                                                                                                                                                                                                DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                                                                                                PROPERTY BOUNDARY
                                                            TO GET THIS PORTION OF THE PAD BACK TO
                                                            THE INLET, LEVELS WOULD BE ABOVE RL 13.0                                                                                                                                                                                                                                            ACTIVE AREA
                                                            (ABOVE MINIMUM FLOOR LEVEL)

                                                                                                                                                                                                                                                                                                                                                AREA TO BE STABILISED

                                                                                                                                                                                                                                                                                                                                X
                 FLOOD LEVELS PROVIDED BY NSC:                                                                                                                                                X                                                                                                                                                 EXISTING SURFACE LEVEL
                                                                                                       BASED ON MODELLING, EXISTING BASIN WOULD NOT BE                                                                                                                                                                      RL 13.5
                 Q1 - 12.76                                                                            REQUIRED TO BE WIDENED SIGNIFICANTLY. HOWEVER,                                       RL 13.5
                 Q2 - 12.79                                                                            THIS ASSUMES A WELL PERFORMING BASIN WITHOUT
                 Q10 - 12.92                                                                           OUTLET CONSTRAINTS DUE TO HIGH TAILWATER
                 Q100 - 13.07
                 Q100 CC - 13.16
                                                                                                                                           X                                                                                                                                                                                                        X

                                                                                                                                         RL 13.5                                                                                                                                                                                                  RL 14.0


                                                                                                                                                   EXISTING
                                                                                                                                                   INFLOW RL 12.50



                                                                                                                                                                                                                             X
                                                                                                                                                                                                                          RL 14.0
                                                                                                                                                                                                                                                                                      X
                                                                                                                                                                                                                                                                                   RL 15.0

                   PIPED OUTLET RL 11.30
                   EMERGENCY SPILLWAY RL 12.20
                 EXISTING DECANT OUTLETS AND SPILLWAY ARE                                                        X
                                                                                                                                   EXISTING DRAINAGE COULD
                 WELL BELOW Q2 FLOOD LEVELS.                                                                   RL 14.0
                     X                                                                                                             REMAIN OR BE MODIFIED
                   RL 15.0

                                                                                                                                                                             X
                                                                                                                                                                           RL 14.0
                                                                    X
                                                                 RL 14.0




                                                                                                                                                                                                                         X
                                                                                                                                                                                                                       RL 17.0




                                                                                                                                                                                                                                                                  CLIENT                                              PROJECT
                                                 D    CELL NUMBER REVISION                                               KR             20/09/21                  0                    20                                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                                 C    FINAL DESIGN REPORT                                                KR             03/06/21                                                                                    TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                  DRAWN                   DESIGNED      DATE          DRAWING TITLE
                                                 B    NEW ATC DESIGN                                                     KR             12/04/21
                                                                                                                                                                        SCALE 1:1000                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                                                      ISSUED FOR USE         TRANSMITTED IN ANY FORM OR BY ANY
                                                 E    REVISION TO NORTH OPTIONS                                          KR             10/12/21                                                                             MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                  RPEQ / SIGNATURE (IF REQUIRED)                                       PAD OPTION - WIDEN EXISTING BASIN
                                                                                                                                                                NORTH
                                                                                                                                                                                       A3                                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                        DRAWING No         REVISION
                                           REVISION   DESCRIPTION                                                    APPROVED BY        DATE                                                                                               PTY LTD.                                                                                   20-0211                CONCEPT-12A        E

Page 27

OPTION B - NEW NORTH-SOUTH HES BASIN                                                                FLOOD LEVELS PROVIDED BY NSC:
                                                                                                    Q1 - 12.43                                                                                                                                                                                                        LEGEND
                                                                                                    Q2 - 12.44
                                                                                                    Q10 - 12.51                                                                                                                                                                                                                               EXISTING CONTOURS (0.5m)
                                                                                                    Q100 - 12.59
                                                                                                    Q100 CC - 12.64                                                                                                                                                                                                                           CATCHMENT TO BASIN

                                                                                                    PIPED OUTLET - RL 12.1 (REQUIRES FROG FLAP AS
                                                                                                    BELOW Q2 FLOOD LEVEL). DOWNSTREAM END OF                                                                                                                                                                                                  HES BASIN
                                                                                                    PIPE RL 12.0 AND THEN DRAINAGE CHANNEL TO
                                                                                                    CONVEY FLOWS OFF SITE. PIPED OUTLET COULD
                                                                    X                                                                                                                                                                                                                                                                         BIO BASIN
                                                                                                    BE RAISED ABOVE Q2 FLOOD EVENT, HOWEVER,
                                                                  RL 11.5                           THIS WOULD REQUIRE ADDITIONAL PAD FILL. BASIN
                                                                                                    WILL STILL OPERATE WITH DECANTS BLOCKED -                                                                                                                                                                                                 FLOW DIRECTION
                                                                                                    REFER TO SMP REPORT
                        X                                                                                                                                                                                                                                                                                                                     EXISTING FLOWPATH
                                                                                                    SPILLWAY RL 13.3 (WELL ABOVE FLOOD LEVELS)
                      RL 12.5
                                                                            BASIN BASED ON A SETTLING DEPTH OF 1.2m. WIDER,                           X                                                                                                                                                                                       CLEAN WATER DRAIN
                                                                            LONGER BASIN COULD BE UTILISED (DASHED LINE) AND
                                                                            WOULD REDUCE SETTLING DEPTH TO 0.9m AND INFLOW                          RL 13.5
                                                                                                                                                                                                                                                                                                                                              DIRTY WATER DRAIN
                                                                            AND PAD LEVEL FILL BY 0.3m

                                                                                                                                                                                                                                                                                                                                              PROPERTY BOUNDARY
                                                                             TO GET THIS PORTION OF THE PAD BACK TO THE
                                                                             INLET, LEVELS WOULD BE ABOVE RL 14.0 (ABOVE                                                                                                                                                                                                                      ACTIVE AREA
                                                                             MINIMUM FLOOR LEVEL), AND LIKELY CLOSER TO RL
                                                                             15.0 TO HAVE A DRAIN GRADING FLOW BACK
                                                                                                                                                                                                                                                                                                                                              AREA TO BE STABILISED

                                                                                                                                                                                                                                                                                                                              X
                                                                                                                                                                                            X                                                                                                                                                 EXISTING SURFACE LEVEL
                                                                                                                                                                                                                                                                                                                          RL 13.5
                                                                                                                                                                                          RL 13.5




                                                                                                                                          X                                                                                                                                                                                                       X

                                                                                                                                        RL 13.5                                                                                                                                                                                                 RL 14.0




                                           INFLOW RL 13.90


                                                                                                                                                                                                                           X
                                                                                                                                                                                                                        RL 14.0
                                                                                                                                                                                                                                                                                    X
                                                                                                                                                                                                                                                                                 RL 15.0



                                                 DRAINAGE AND PAD LEVELS TO BE                                     X
                                                 MODIFIED TO ACHIEVE INFLOW LEVEL OF
                                                                                                                 RL 14.0
              X                                  NEW BASIN. WHERE DRAINS ARE USED,
                                                 PAD LEVEL LIKELY TO BE RL 15 OR HIGHER
            RL 15.0

                                                                                                                                                                           X
                                                                                                                                                                         RL 14.0
                                                         X
                                                      RL 14.0




                                                                                                                                                                                                                       X
                                                                                                                                                                                                                     RL 17.0




                                                                                                                                                                                                                                                                CLIENT                                              PROJECT
                                   D       CELL NUMBER REVISION                                                              KR        20/09/21                 0                    20                                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                   C       FINAL DESIGN REPORT                                                               KR        03/06/21                                                                                   TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
                                   B       NEW ATC DESIGN                                                                    KR        12/04/21
                                                                                                                                                                      SCALE 1:1000                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                                                    ISSUED FOR USE         TRANSMITTED IN ANY FORM OR BY ANY
                                   E       REVISION TO NORTH OPTIONS                                                         KR        10/12/21                                                                            MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                        PAD OPTION - NORTH-SOUTH BASIN
                                                                                                                                                              NORTH
                                                                                                                                                                                     A3                                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                        DRAWING No         REVISION
                                REVISION   DESCRIPTION                                                                 APPROVED BY     DATE                                                                                              PTY LTD.                                                                                   20-0211                CONCEPT-12B        E

Page 28

 OPTION C - NEW EAST-WEST HES BASIN                                                                                       PIPED OUTLET - RL 12.1 (REQUIRES FROG FLAP AS
                                                                                                                          BELOW Q2 FLOOD LEVEL). DOWNSTREAM END OF                                                                                                                                                        LEGEND
                                                                                                                          PIPE RL 12.0 AND THEN DRAINAGE CHANNEL TO
                                                                                                                          CONVEY FLOWS OFF SITE. PIPED OUTLET COULD                                                                                                                                                                               EXISTING CONTOURS (0.5m)
                                                                                                                          BE RAISED ABOVE Q2 FLOOD EVENT, HOWEVER,
                                                                                                                          THIS WOULD REQUIRE ADDITIONAL PAD FILL. BASIN                                                                                                                                                                           CATCHMENT TO BASIN
FLOOD LEVELS PROVIDED BY NSC:
                                                                                                                          WILL STILL OPERATE WITH DECANTS BLOCKED -
Q1 - 12.43
                                                                                                                          REFER TO SMP REPORT
Q2 - 12.44
                                                                                                                                                                                                                                                                                                                                                  HES BASIN
Q10 - 12.51
                                                                                                                          SPILLWAY RL 13.3 (WELL ABOVE FLOOD LEVELS)
Q100 - 12.59
Q100 CC - 12.64                                                                                                                                                                                                                                                                                                                                   BIO BASIN
                                                                                X
                                                                              RL 11.5
                                                                                                                                                                                                                                                                                                                                                  FLOW DIRECTION

                                   X                                                                                                                                                                                                                                                                                                              EXISTING FLOWPATH
                                 RL 12.5
                                                                                                                                                             X                                                                                                                                                                                    CLEAN WATER DRAIN
                                                                                                                                                           RL 13.5
                                                                                                                                                                                                                                                                                                                                                  DIRTY WATER DRAIN
                                                                                                                                                                  INFLOW RL 13.90
        BASIN BASED ON A SETTLING DEPTH OF 1.2m. WIDER,
        LONGER BASIN COULD BE UTILISED (DASHED LINE) AND                                                                                                                                                                                                                                                                                          PROPERTY BOUNDARY
        WOULD REDUCE SETTLING DEPTH TO 0.9m AND INFLOW
        AND PAD LEVEL FILL BY 0.3m                                                                                                                                                                                                                                                                                                                ACTIVE AREA

                                                                                                                                                                                                                                                                                                                                                  AREA TO BE STABILISED

                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                X                                                                                                                                                 EXISTING SURFACE LEVEL
                                                                                        TO GET THIS PORTION OF THE PAD BACK TO THE                                                                                                                                                                                            RL 13.5
                                                                                        INLET, LEVELS WOULD BE ABOVE RL 14.0 (ABOVE                                                           RL 13.5
                                                                                        MINIMUM FLOOR LEVEL), AND LIKELY CLOSER TO RL
                                                                                        15.0 TO HAVE A DRAIN GRADING FLOW BACK


                                                                                                                                                   X                                                                                                                                                                                                  X

                                                                                                                                                 RL 13.5                                                                                                                                                                                            RL 14.0




                                                                                                                                                                                                                               X
                                                                                                                                                                                                                            RL 14.0
                                                                                                                                                                                                                                                                                        X
                                                                                                                                                                                                                                                                                     RL 15.0



                                                             DRAINAGE AND PAD LEVELS TO BE                                  X
                                                             MODIFIED TO ACHIEVE INFLOW LEVEL OF
                                                                                                                          RL 14.0
                      X                                      NEW BASIN. WHERE DRAINS ARE USED,
                                                             PAD LEVEL LIKELY TO BE RL 15 OR HIGHER
                    RL 15.0

                                                                                                                                                                               X
                                                                                                                                                                             RL 14.0
                                                                     X
                                                                  RL 14.0




                                                                                                                                                                                                                           X
                                                                                                                                                                                                                         RL 17.0




                                                                                                                                                                                                                                                                    CLIENT                                              PROJECT
                                                D      CELL NUMBER REVISION                                                         KR          20/09/21            0                    20                                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                                C      FINAL DESIGN REPORT                                                          KR          03/06/21                                                                              TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                    DRAWN                   DESIGNED      DATE          DRAWING TITLE
                                                B      NEW ATC DESIGN                                                               KR         12/04/21
                                                                                                                                                                          SCALE 1:1000                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                                                        ISSUED FOR USE         TRANSMITTED IN ANY FORM OR BY ANY
                                                E      REVISION TO NORTH OPTIONS                                                    KR         10/12/21                                                                        MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                    RPEQ / SIGNATURE (IF REQUIRED)                                         PAD OPTION - EAST-WEST BASIN
                                                                                                                                                                  NORTH
                                                                                                                                                                                         A3                                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                        DRAWING No         REVISION
                                            REVISION   DESCRIPTION                                                              APPROVED BY     DATE                                                                                         PTY LTD.                                                                                   20-0211               CONCEPT-12C         E

Page 29

   HIGH - EFFICIENCY SEDIMENT BASIN                                                                                                                                                                                                                                          BIO-RETENTION BASIN

      1.       ALLOW APPROXIMATELY 5-6% OF CATCHMENT AREA DEPENDING ON DEPTH                                                                                                                                                                                                  1.   ALLOW APPROXIMATELY 2-3.5% OF CATCHMENT AREA INCLUDING FOREBAY
      2.       BASINS REQUIRE APPROXIMATELY 2m OF FALL FROM INLET TO OUTLET TO ACT AS A TYPE A BASIN - SELF DRAINING                                                                                                                                                          2.   CAN BE USED FOR GREEN WASTE AREA
      3.       IF NO OUTLET CAN BE ACHIEVED, A FULL BASIN COULD BE ADOPTED (TYPE B BASIN), HOWEVER WOULD NEED TO NEGOTIATE WITH DES                                                                                                                                           3.   COULD BE ADOPTED FOR ENTIRE RRC IF PAD IS SEALED AND SEDIMENT IS NOT THE KEY CONTAMINANT OF CONCERN
                                         FOREBAY LENGTH                                                                                         MAIN CELL LENGTH
                                                                                                                                                                           DECANT SKIMMER
                                                                    LEVEL SPREADER
                                                                                                                               MAXIMUM                                     FROM TOP OF
                                         DRAIN INVERT MIN.          CREST MIN. 0.2m
                                                                                                                               WATER                                       WATER COLUMN
                                         0.2m ABOVE LEVEL           ABOVE SPILLWAY                                                                                                                                             SPILLWAY CREST
                                                                    CREST                                                      LEVEL
                                         SPREADER                                                                                                                                                           0.3m (MIN)

                                                                                                                                                                                                                                          HIGH FLOW
                                                                                                                                                             FLOC SETTLING DEPTH (DF)                                                     (OVER
                                                                                                              SETTLING ZONE DEPTH (DS)                                                                                                    SPILLWAY)

                                                                                                                   FREE WATER ZONE (DFF)                                                      DEPTH (DT)
                                                                                                                                                SEDIMENT STORAGE DEPTH (DSS)

                                                                                                                                                                                                                   DECANT
                                                                                                                                                                                                                   STRUCTURE      LOW FLOW
                                                                                                                                                                                                                                  OUTLET

                                                                                       TYPE A SEDIMENT BASIN TYPICAL SECTION (nts)

                   AUTOMATED
                   DOSING SYSTEM                                    LEVEL SPREADER
                                                                    TO BE FULL WIDTH
                                                                    OF BASIN
                                                                                                                                                                                                                                       SPILLWAY AND
                                                                                                                                                                                                                                       CHUTE TO BE
                                                                                                                                                                                                                                       LINED AS
                                                                                                                                                                                                                                       SPECIFIED
                      FOREBAY WIDTH




                                                                                           MAIN CELL WIDTH




INLET DRAIN
   (OR PIPE)                              FOREBAY LENGTH                                                                                      MAIN CELL LENGTH
                                                                                                                                                                                                                                        FLOW DIRECTION

                                                                                                                                                                                                                                                                             FLOATING WETLAND
                                                                                                                                                                          DECANT SKIMMER
                                                                                                                                                                          ARMS ON TOP OF
                                                                                                                                                                                                                                                                              1.   COULD BE IMPLEMENTED IN HES BASIN TO MANAGE NUTRIENT LOADS FROM GREEN WASTE AREA (NO NEED TO
                                                                                                                                                                          WATER COLUMN                             DECANT                 LOW FLOW                                 SEPARATE AREA FOR BIO BASIN)
                                                                                                                                                                                                                   STRUCTURE              OUTLET
                                                                                                                                                                                                                                                                               2. CURRENTLY BEING TRIALLED AT CALOUNDRA LANDFILL




                                                                                                             TYPE A SEDIMENT BASIN PLAN VIEW (nts)



                                         FOREBAY LENGTH                                                                                         MAIN CELL LENGTH

                                                                    LEVEL SPREADER
                                                                    CREST MIN. 0.2m                                          MAXIMUM
                                         DRAIN INVERT MIN.                                                                   WATER
                                         0.2m ABOVE LEVEL           ABOVE SPILLWAY
                                                                    CREST                                                    LEVEL
                                         SPREADER                                                                                                                                                                 0.3m (MIN)       SPILLWAY CREST



                                                                                                                                                                   FLOC SETTLING DEPTH (DF)
                                                                                                              SETTLING ZONE DEPTH (DS)
                                                                                                                                                                                                DEPTH (DT)

                                                                                                                              SEDIMENT STORAGE DEPTH (DSS)




                                                                                       TYPE B SEDIMENT BASIN TYPICAL SECTION (nts)

                   AUTOMATED
                   DOSING SYSTEM                                    LEVEL SPREADER
                                                                    TO BE FULL WIDTH
                                                                    OF BASIN
                                                                                                                                                                                                                                       SPILLWAY AND
                                                                                                                                                                                                                                       CHUTE TO BE LINED
                                                                                                                                                                                                                                       AS SPECIFIED
                         FOREBAY WIDTH




                                                                                        MAIN CELL WIDTH




INLET DRAIN (OR
          PIPE)

                                          FOREBAY LENGTH                                                                                      MAIN CELL LENGTH

                                                                                                                                                                                                                               FLOW DIRECTION




                                                                                                             TYPE B SEDIMENT BASIN PLAN VIEW (nts)
                                                                                                                                                                                                                                                                                                                          CLIENT                                              PROJECT
                                                                D       CELL NUMBER REVISION                                                                                             KR            20/09/21
                                                                                                                                                                                                                                                                                                COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                                                C       FINAL DESIGN REPORT                                                                                              KR            03/06/21                                                                             TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                                                                          DRAWN                   DESIGNED      DATE          DRAWING TITLE
                                                                B       NEW ATC DESIGN                                                                                                   KR            12/04/21                                                                      THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                 STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                                                                                                            ISSUED FOR USE           TRANSMITTED IN ANY FORM OR BY ANY
                                                                E       REVISION TO NORTH OPTIONS                                                                                        KR            10/12/21                                                                      MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                          RPEQ / SIGNATURE (IF REQUIRED)                                   PAD OPTIONS - ADDITIONAL INFORMATION
                                                                                                                                                                                                                               NORTH
                                                                                                                                                                                                                                                       A3                            THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                DRAWING No           REVISION
                                                             REVISION   DESCRIPTION                                                                                               APPROVED BY              DATE                                                                                    PTY LTD.                                                                                   20-0211         CONCEPT-13          E

Page 30

R0386A: NAMBOUR LANDFILL - STORMWATER MANAGEMENT PLAN




APPENDIX B
SW5 DESIGN REPORT




Environment. Engineering. Education.                    PAGE 16

Page 31

                    DESIGN REPORT & MAINTENANCE
                         AND INSPECTION PLAN
                       NOOSA LANDFILL – CLEAN WATER DRAIN &
                        HIGH-EFFICIENCY SEDIMENT BASIN (SW5)




CLIENT: NOOSA SHIRE COUNCIL

DOCUMENT NUMBER: R1767

VERSION: IFC

DATE: 05/10/21

Page 32

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




TABLE OF CONTENTS
1    INTRODUCTION                                                                                                1
2    CATCHMENT AND STAGING                                                                                       1
3    DRAINAGE DESIGN                                                                                             1
     3.1. DIVERSION DRAIN TO BASIN                                                                               1
     3.2. INLET DRAIN FOR DOSING                                                                                 1
     3.3. LEVEL SPREADER WEIR                                                                                    1
     3.4. DECANT STRUCTURE                                                                                       1
     3.5. EMERGENCY SPILLWAY                                                                                     1
     3.6. CLEAN WATER DIVERSION DRAIN                                                                            2
          3.6.1. MANNINGS ROUGHNESS SENSITIVITY ANALAYSIS                                                        2
4    BASIN VOLUME AND SIZE                                                                                       2
     4.1. EA REQUIREMENT                                                                                         2
     4.2. ASSESSMENT APPROACH                                                                                    2
     4.3. HISTORIC RAINFALL PERIOD                                                                               2
     4.4. CATCHMENT                                                                                              2
     4.5. CATCHMENT LOSSES                                                                                       3
          4.5.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.5.2. TYPE A HES BASIN                                                                                3
     4.6. BASIN OPERATION APPROACH                                                                               3
          4.6.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.6.2. TYPE A HES BASIN                                                                                3
     4.7. RESULTS                                                                                                3
5    HYDROLOGIC & HYDRAULIC MODELLING                                                                            3
     5.1. RAINFALL                                                                                               4
     5.2. PEAK FLOW RATE                                                                                         4
     5.4. PEAK FLOW DEPTHS                                                                                       6
6    OPERATION & MAINTENANCE                                                                                     7
     6.1. DOSING SYSTEM                                                                                          7
     6.2. MONITORING SYSTEM                                                                                      7
     6.3. SEDIMENT BASIN                                                                                         7
          6.3.1. FOREBAY                                                                                         7
          6.3.2. MAIN CELL                                                                                       8
     6.4. DESIGN EVENT & COMPLIANCE                                                                              8
APPENDIX A – CATCHMENTS & STAGING                                                                                9
APPENDIX B – BASIN CALCULATIONS                                                                                  10




Environment. Engineering. Education                                                                               PAGE ii

Page 33

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



1                INTRODUCTION
This design report applies to proposed construction of the Southern Clean Water Drain and the High-Efficiency Sediment
Basin located at outlet SW5. This design report has been provided to detail catchments, staging and operational
requirements for the proposed sediment basin and clean water drain.

2                CATCHMENT AND STAGING
The maximum catchment assumed to drain to the sediment basin is 4.5 hectares. This will occur as Cell 3.2 and 3.3 is
formed and can grade to the basin. It should be noted that to minimise the size of the basin, Cell 3.2 and 3.3 is required
to be split into quadrants to ensure the maximum catchment to the basin is not exceeded. This will allow a maximum of
half of Cell 3.2 and 3.3 to be graded to the basin.

The maximum catchment grading to the clean water drain is 6.2 hectares. This will occur once Cell 1.1 and Cell 2.2 are
capped and stabilised. The maximum catchment defined does not include the additional 4.5 hectares grading to the
sediment basin which will overtop into the final portion of the clean water drain. For assessment purposes, this additional
catchment has been included in the assessment of the downstream portion of the clean water drain.

Details on Catchments and Staging is provided in Appendix A.

3                DRAINAGE DESIGN
3.1.                DIVERSION DRAIN TO BASIN

The diversion drain to the basin has been sized for the 1 in 10 year ARI critical storm event in accordance with the
Guideline - Stormwater and environmentally relevant activities (DES, 2019). The Environmental Authority (EPPR01855314)
also specifies that the design event for temporary drainage works to convey waters to the sediment basin and around
disturbance areas is a 1 in 10 year ARI event plus 150mm freeboard for > 24 months disturbance.
To cater for the 4.5 hectare catchment and flat grade, a 3m wide turf lined drain with a minimum depth of 700mm
including freeboard is required. Refer to Section 5 for hydraulic modelling undertaken.

3.2.                INLET DRAIN FOR DOSING

To improve accuracy of flow depth measurement, the drain width at the dosing point has been reduced to 0.7m by
increasing the longitudinal grade from 0.7% to 3% and providing a concrete lining. The inlet drain has also been sized
for the 1 in 10 year ARI critical storm event in accordance with the Guideline - Stormwater and environmentally relevant
activities (DES, 2019). Refer to Section 5 for hydraulic modelling undertaken.

3.3.                LEVEL SPREADER WEIR

The level spreader is the weir in between the forebay and main cell. The level spreader has been sized for the 100 year
ARI critical storm event which is in excess of the 50 year ARI required in accordance with the Guideline - Stormwater and
environmentally relevant activities (DES, 2019). The level spreader has a width of 16 m and is concrete lined with a full
width concrete chute. The maximum water depth across the weir in a 100 year ARI is 190 mm.

Refer to Section 5 for hydraulic modelling and Appendix B for calculations undertaken.

3.4.                DECANT STRUCTURE

The decant structure has been designed in accordance with Appendix B - Sediment Basins (IECA, 2018). In accordance
with Table 5 of the document a maximum decant flow rate of 9L/s/ha has been adopted. To achieve a total of 40.5L/s
through the decant arms, a total of 13 decant arms would be required utilising the standard of 200 holes with a diameter
of 10mm. To reduce the number of arms to a pracital number, 17mm diameter holes are to be utilsied to increase the
flow rate to approximately 13L/s per arm, allowing the use of 3 arms and a single manhole structure.

3.5.                EMERGENCY SPILLWAY

The emergency spillway from the main cell has been sized for the 100 year ARI critical storm event which is in excess of
the 50 year ARI required in accordance with the Guideline - Stormwater and environmentally relevant activities (DES,



Environment. Engineering. Education.                                                                                PAGE 1

Page 34

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



2019). The spillway has a width of 15 m and is concrete lined with a rock chute and dissipater. The maximum water depth
across the weir in a 100 year ARI is 170 mm.

Refer to Section 5 for hydraulic modelling and Appendix B for calculations undertaken.

3.6.                CLEAN WATER DIVERSION DRAIN

The clean water diversion drain has been sized for the 1 in 10 year ARI critical storm event in accordance with the Guideline
- Stormwater and environmentally relevant activities (DES, 2019).
To cater for the maximum 6.2 hectare catchment and flat grade, a 3m wide turf lined drain with a minimum depth of
500mm to 700mm including freeboard is required. Refer to Section 5 for hydraulic modelling undertaken.
3.6.1.           MANNINGS ROUGHNESS SENSITIVITY ANALAYSIS
An analysis of the sensitivity of flood depths with the clean water drain was undertaken based on a fully turfed drain vs
a turf lined base with vegetated batters. A Manning’s roughness of 0.15 was adopted as a worst case scenario for the
planted batters.

The sensitivity analysis indicate a flood depth increase ranging from 30mm to 80mm in the drain, however, all flows will
be contained within the drain indicating no concern in regards to planting batters from a flow conveyance position.

4                BASIN VOLUME AND SIZE
4.1.                EA REQUIREMENT

The Environmental Authority (EPPR01855314) specifies that site erosion protection measures and sediment control
measure must be implemented to have the hydraulic effectiveness to treat stormwater for 90% of the annual runoff for
each stormwater catchment.

4.2.                ASSESSMENT APPROACH

An assessment of a Type A High-Efficiency Sediment basin was undertaken utilising the MUSIC (Model for Urban
Stormwater Improvement Conceptualisation) software as a water balance model to determine the percentage of annual
runoff discharged from the decant structure rather than over the emergency spillway. In accordance with IECA (2018),
Type A basins are sized to allow the design event runoff to discharge (treated) from the decant structure with any runoff
overtopping the emergency spillway to be considered over-design. The MUSIC analysis was undertaken for three Type
A sediment basin design events (and corresponding basin sizes):

       +      1 year ARI, 24 hour (short-term design event in accordance with IECA (2018))
       +      2 year ARI, 24 hour
       +      5 year ARI, 24 hour (long-term design event in accordance with IECA (2018))

In addition, a comparison of the effectiveness of a 10 year 24 hour traditional sediment basin was undertaken using a
water balance model to determine the percentage of annual runoff that would be captured and treated by the basin.
This assessment is not required to determine the size of the Type A sediment basin, however, provides some additional
justification for achieving a 90% annual runoff treatment target.

4.3.                HISTORIC RAINFALL PERIOD

The models utilised 10 years of historic rainfall from the Cooroy Composite Station (Station ID 40059) for the period
between 1/1/1973 – 31/12/1983. This period is considered representative of historic rainfall and is in accordance with the
Water By Design MUSIC Modelling Guidelines. A 6 minute timestep was utilised in the HES basin assessment, where a
daily rainfall total was utilised from the Station data for the traditional basin assessment.

4.4.                CATCHMENT

A 1 hectare catchment was assessed. A range of catchment sizes were also assessed for the HES basin model as a
sensitivity analysis. It was found that that catchment size did not significantly affect the annual runoff treatment
performance.




Environment. Engineering. Education.                                                                                 PAGE 2

Page 35

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



4.5.                CATCHMENT LOSSES

4.5.1.           10 YEAR 24 HOUR TRADITIONAL BASIN
A sensitivity analysis of a range of Initial and Ongoing losses was undertaken for the water balance model. As the losses
associated with rainfall also affected the basin size (traditional basin size is calculated based on catchment size, design
rainfall depth and rainfall loss) it was found that the losses adopted had minimal effect on the percentage of annual
runoff treated with performance ranging from 83.4 – 85.5%.

4.5.2.           TYPE A HES BASIN
To ensure the HES basin model catchment runoff was consistent with the traditional basin model, the fraction impervious
in the source node was modified to ensure the total annual runoff was equivalent to the traditional basin model. This
was undertaken for a range of losses utilised in the traditional basin model for comparison purposes.

4.6.                BASIN OPERATION APPROACH

4.6.1.           10 YEAR 24 HOUR TRADITIONAL BASIN
For the purpose of the model, it was assumed that only runoff that was captured and had 5 consecutive days of no
runoff (i.e. minimal rainfall) would achieve treatment and release and could be considered treated. If further rainfall
occurred within the 5 succeeding days, then it was assumed the basin had not been dewatered and the basin would
continue to fill or overtop if that capacity had been reached. Any runoff that overtopped the spillway was considered to
be untreated.

4.6.2.           TYPE A HES BASIN
For the purpose of the model, an outlet pipe was sized in the MUSIC model based on the proposed decant outlet rate
in accordance with IECA (2018). All runoff discharging from the decant structure was considered treated with any runoff
overtopping the spillway to be considered untreated. This is in accordance with the design approach detailed in IECA
(2018).

4.7.                RESULTS

The results below show the percentage of annual runoff treated for a range of basin types sized in accordance with IECA
(2018).

Table 1 – Performance of 10 year 24 hour basin vs HES basins with various design events

                                                                                   Percentage of
                                                                                   Annual Runoff
                                                                                      Treated

  1 in 10 year 24 hour traditional basin                                                 85.2%

  1 in 1 year 24 hour Type A basin (HES)                                                 90.3%

  1 in 2 year 24 hour Type A basin (HES)                                                 93.0%

  1 in 5 year 24 hour Type A basin (HES)                                                 96.3%

Based on the results provided, a 1 in 1 year ARI Type A basin will exceed the performance of a 10 year 24 hour traditional
sediment basin and also achieve the 90% requirement of annual runoff treatment specified in the Environmental
Authority.



5                HYDROLOGIC & HYDRAULIC MODELLING
Hydrologic and hydraulic modelling has been carried out using the XP-Storm software. Drain sections have been
modelled as per the design plans for the 10 % AEP and 1 % AEP events. The layout of the model is illustrated as Figure
1, showing the clean and dirty water drains.




Environment. Engineering. Education.                                                                                PAGE 3

Page 36

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




Figure 1 – XP Model for Drainage Assessment

5.1.                RAINFALL

Modelling was undertaken for 10 % and 1 % Annual Exceedance Probability (AEP) storm events for durations between 15
minutes and 3 hours. Intensity Frequency Duration (IFD) data for the hydrologic modelling was obtained from the Bureau
of Meteorology website, and has been developed in accordance with Australian Rainfall and Runoff (ARR) 2016. The IFD
data is summarised in Table 2.

Table 2 – Intensity Frequency Duration Data

    DURATION (mins)                    10 % AEP (MM/HR)              1 % AEP (MM/HR)

                  15                        152.0                            217.0

                 20                         133.0                             191.0

                 25                          119.0                           172.0

                 30                         108.0                            158.0

                 45                          87.1                            129.0

                 60                          74.2                             112.0

                 90                          59.0                             90.7

                 120                         50.1                             78.1

                 180                         39.8                             63.3



5.2.                PEAK FLOW RATE

A range of design storm durations was assessed to ensure the critical duration event was taken into consideration. The
Guideline - Stormwater and environmentally relevant activities (EHP, 2014) requires that high erosion hazard sites
implement the following design and management measures:



Environment. Engineering. Education.                                                                             PAGE 4

Page 37

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



       +      All concentrated stormwater flows (including ‘clean’ stormwater and ‘dirty’ stormwater) should have
              concentrated flow paths, such as drainage lines, diversion drains, channels and batter chutes (where applicable)
              which have been designed, constructed, effectively armoured and maintained to convey the runoff from events
              up to and including the average recurrence interval (ARI) of 1 in 10 year critical duration ARI storm event without
              causing water contamination, sheet, rill or gully erosion, sedimentation, or damage to structures or property.

The Environmental Authority (EPPR01855314) also specifies that the design event for temporary drainage works to convey
waters to the sediment basin and around disturbance areas is a 1 in 10 year ARI event plus 150mm freeboard for > 24
months disturbance. Design has been undertaken to ensure this criteria is satisfied, with an additional assessment of the
1 % AEP (100 year ARI) undertaken as a sensitivity analysis on flow depth within the drains.

The peak flow rates for locations within the drains are detailed below in Table 3.

Table 3 – Peak Flow Rates & Velocities


                                       PEAK FLOW (M3/S) – UPSTREAM OF NODE                          MAX. VELOCITY (M/S) – UPSTREAM OF NODE

           LOCATION

                                              10% AEP                           1% AEP                       10% AEP          1% AEP


                 CH0                               -                                -                              -             -

               CH100                            1.443                            2.470                           0.766        0.906

               CH132                            1.442                            2.465                           1.245         1.464

               CH282                             1.418                            2.412                          0.762        0.885

               CH430                            1.955                             3.316                          0.831         0.976

               CH523                            1.950                            3.306                           1.394         1.635

               CH558                            3.404                            5.739                           1.187         1.394

               CH623                            3.499                            5.902                           1.797         2.101

               CH668                            3.498                            5.900                           1.435         1.687

               CH716                            3.472                            5.858                           0.796        0.940

            HES DWD                                -                                -                              -             -

            Doser Inlet                         1.530                             1.915                          0.774         0.910

              Forebay                           1.530                             1.916                          3.856        4.448




Environment. Engineering. Education.                                                                                                   PAGE 5

Page 38

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



5.4.                PEAK FLOW DEPTHS

An assessment of depth within the clean water and dirty water drains is detailed below in Table 4.

Table 4 – Depth Assessment

                                                                        10 % AEP                                          1 % AEP
                                       INVERT LEVEL
              NODE                                    PEAK WATER LEVEL                  DEPTH               PEAK WATER LEVEL        DEPTH
                                         (m AHD)
                                                          (m AHD)                        (M)                    (m AHD)              (M)

               CH0                        25.263              25.683                     0.420                   25.812             0.549

              CH100                       24.563              24.830                     0.267                   24.920             0.357

              CH132                       23.636              24.028                     0.392                   24.154             0.518

             CH282                        22.631              23.127                     0.496                   23.273             0.642

             CH430                        21.550              21.843                     0.293                   21.939             0.389

             CH523                        18.100              18.664                     0.564                   18.823             0.723

             CH558                        17.749               18.172                    0.423                   18.299             0.550

             CH623                        15.350              15.705                     0.355                   15.825             0.475

             CH668                        14.210              14.747                     0.537                   14.920             0.710

              CH716                       14.000              14.565                     0.565                   14.733             0.733

           HES DWD                        21.600               22.115                     0.515                  22.257             0.657

          Doser Inlet                     21.000              21.304                     0.304                   21.396             0.396

            Forebay                       20.700              21.000                     0.300                   21.100             0.400


Calculations for rock sizing, weir sizing and rock dissipaters are provided in Appendix B.




Environment. Engineering. Education.                                                                                                        PAGE 6

Page 39

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



6                 OPERATION & MAINTENANCE
The SW5 High Efficiency Sediment (HES) basin is to have both dosing and monitoring systems installed.

6.1.                DOSING SYSTEM

The dosing system will read real time flow rates and dose the applicable volume of the Coagulant/Flocculant into the
inflow stream as it passes the dosing point. The data collected is to be sent to a cloud-based data platform for storage
and future interrogation.
Maintenance and operation of the dosing system is to be detailed by the dosing system supplier.

6.2.                MONITORING SYSTEM

The monitoring system will read real time water quality parameters such as:
              •      Turbidity,
              •      pH,
              •      Electrical Conductivity, and
              •      Dissolved Oxygen.
The monitoring system is to also control a power actuated valve on the outlet to the basin. When the water quality
readings are outside the site’s environmental approval conditions the valve will close, stopping any potential outflows
from occurring.
All data collected from the monitoring and shut-off valve is to be sent to a cloud-based data platform for storage and
future interrogation.
Maintenance and operation of the monitoring system is to be detailed by the monitoring system supplier.




Figure 2 – Typical Dosing and Monitoring Setup (Source: Turbid)

6.3.                SEDIMENT BASIN

6.3.1.            FOREBAY
The Forebay will require clean out periodically. Access into the ramp can be gained from the defined access track.
Dewatering into the main cell is recommended if the forebay is to be drained to remove sediment. A sump has been
located in the north western corner of the forebay to assist in desilting. Desilting is recommended to be undertaken once
accumulation is causing large resuspension with inflows. This may be at approximately 50% full.



Environment. Engineering. Education.                                                                              PAGE 7

Page 40

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



Desilting is not a requirement from a compliance point, with the forebay acting as a mixing mechanism rather than a
storage or treatment volume.

6.3.2.           MAIN CELL
The main cell has a defined sediment storage volume between RL 18.30 and RL 18.60. A sump has been located in the
northern corner of the main cell to assist in desilting. Desilting is recommended to be undertaken once accumulation is
50% of the sediment storage zone. A marker post is to be installed to monitor the depth of sediment accumulation.

6.3.3.           EQUIPMENT FOR CLEAN-OUT
The concrete specification has been designed based on access via a rubber wheel/tracked Posi-track. The concrete ramps
and floor of the basin are not to be accessed by larger equipment which may exceed the design loadings.

6.4.                DESIGN EVENT & COMPLIANCE

The sediment basin has been sized as a Type A sediment basin with a design event of a 1 year ARI 24 hour storm event
equating to 136mm in 24 hours. If this event is exceeded, it is expected that outflows may exceed the EA requirements.
For events under the nominated design event, outflows are to be in accordance with the EA requirements. Where the
sediment basin is not adhering to the water quality requirements, interrogation of dosing and monitoring data should
be undertaken or advice sought from a specialist.

Table 5 – WT2 EA water quality requirements for controlled releases


               PARAMETER                          RELEASE LIMIT                                       COMMENTS


                       pH                             6.5 -9 .0                     Real-Time included on Monitoring Station

         Specific Conductance                      < 1500 uS/cm                     Real-Time included on Monitoring Station

           Dissolved Oxygen                          > 6 mg/L                       Real-Time included on Monitoring Station

   Total & Dissolved Aluminium                           N/A                               Sampling to be manual by NSC

            Suspended Solids                            < 50                       Cannot measure in the field. Correlation with
                                                                                  Turbidity to be gained by > 5 sampling events
                                                                                        during initial releases from basin.

                  Turbidity                         Correlation                    Correlation to be undertaken if not currently
                                                                                                       used




Environment. Engineering. Education.                                                                                               PAGE 8

Page 41

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




APPENDIX A – CATCHMENTS & STAGING




Environment. Engineering. Education.                                                                             PAGE 9

Page 42

                                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                                                     EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                     CATCHMENT BOUNDARY


                                                                                                                                                                                                                                                           1         CATCHMENT LABEL


                                                                                                                                                                                                                                                                     FLOW DIRECTION


                                                                      BIO                                                                                                                                                                                            FLOWPATH


                                                                                                                                                                                                                                                                     PROPERTY BOUNDARY




                                  OFFICE
                                  POND                                                                     SW4




                                                                                            SW4                                    BYPASS -
                                                                                                                                    STABLE




                                                       CLEAN -
                                                                                                              HES
                                                      INTERNAL
                                                                                                             BASIN




                                                                                                                     CELL 2.2 TO
                                            CLEAN -                                                                  LEACHATE
                                           EXTERNAL




                                                                                                                                                                SW5




                                                                                                                                                                                   CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                           KR        20/09/21     0                    80                                                 COPYRIGHT C                               NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                            KR        03/06/21                                                                         TOPO GROUP PTY LTD
                                                                                                                                                                                   DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                 KR        12/04/21
                                                                                       SCALE 1:4000                                           THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                       CONCEPT STORMWATER STAGING
                                                                                                                     ISSUED FOR USE           TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                 KR        31/03/21                                                                  MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                OVERALL CATCHMENT PLAN
                                                                               NORTH
                                                                                                      A3                                      THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                   DRAWING No          REVISION
REVISION   DESCRIPTION                                APPROVED BY   DATE                                                                                    PTY LTD.                                                                                       20-0211            CONCEPT-01         D

Page 43

                                                                                                                                                                                                                                                       LEGEND

                                                                                                                                                                                                                                                                               EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                               CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                               CATCHMENT TO CWD


                                                                                                                                                                                                                                                               1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                               FLOW DIRECTION

                                                                                                                                                                                                                                                                               EXISTING FLOWPATH

                                                                                                                                                                                                                                                                               CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                               DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                               PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                                  ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                               AREA TO BE STABILISED




                                                                                                                                          CELL 2.2 DIRECTED TO LEACHATE UNTIL AREAS CAN
                                                                                                                                          GRADE OUT (LIKELY CROSS-OVER WITH EXPANSION
                                                                                                                                          AS SHOWN IN STAGE 2)




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                             PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                          CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                               INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                        CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                        (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                      STAGE 1
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                       20-0211               CONCEPT-02                  D

Page 44

                                                                                                                                                                                                                                                   LEGEND

                                                                                                                                                                                                                                                                           EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                           CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                           CATCHMENT TO CWD


                                                                                                                                                                                                                                                           1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                           FLOW DIRECTION

                                                                                                                                                                                                                                                                           EXISTING FLOWPATH

                                                                                                                                                                                                                                                                           CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                           DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                           PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                              ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                           AREA TO BE STABILISED




                                                                                                                                          CELL 1.1 AND 2.2 TO BE EXPANDED. UNTIL WASTE IS
                                                                                                                                          ABOVE SURROUNDING GROUND LEVEL, CAPTURED
                                                                                                                                          RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                            FINAL / TEMPORARY DRAINAGE                                                                                        PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                       REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                      CATCHMENT TO BASIN - 4.0 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                           INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                    CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                    (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 2
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-03                  D

Page 45

                                                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                              CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                              CATCHMENT TO CWD


                                                                                                                                                                                                                                                              1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                              FLOW DIRECTION

                                                                                                                                                                                                                                                                              EXISTING FLOWPATH
                                                                                                                                                                                           CELL 3.2 & 3.3 BEING CONSTRUCTED AND SELF
                                                                                                                                                                                           CONTAINED (NO FLOW TO BASIN). CAPTURED
                                                                                                                                                                                           RUNOFF CAN BE PUMPED TO HES BASIN                                                  CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                              DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                              PROPERTY BOUNDARY

                                                                                                                                                                                                                                                                              ACTIVE AREA

                                                                                                                                                                                                                                                                              AREA TO BE STABILISED




                                                                                                                                         CELL 1.1 AND 2.2 TO
                                                                                                                                                          CAPACITY
                                                                                                                                                             BE EXPANDED.
                                                                                                                                                                   REACHEDUNTIL WASTE IS
                                                                                                                                         AND BEING
                                                                                                                                         ABOVE  SURROUNDING
                                                                                                                                                    CAPPED ANDGROUND
                                                                                                                                                                 LANDSCAPED
                                                                                                                                                                       LEVEL, CAPTURED
                                                                                                                                         RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                            PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                         CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                              INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                        CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                       CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                       (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                                CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                         COPYRIGHT C                                  NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                      TOPO GROUP PTY LTD
                                                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR                KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                              MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 3
                                                                                                 NORTH
                                                                                                                        A3                             THE WRITTEN CONSENT OF TOPO GROUP                    CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                PTY LTD.                                                                                       20-0211               CONCEPT-04                  D

Page 46

                                                                                                                                                                                                                    LEGEND

                                                                                                                                                                                                                                            EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                            CATCHMENT TO BASIN


                                                                                                                                                                                                                                            CATCHMENT TO CWD


                                                                                                                                                                                                                            1               CATCHMENT LABEL


                                                                                                                                                                                                                                            FLOW DIRECTION

                                                                                                                                                                                                                                            EXISTING FLOWPATH
                                                                                                                                                         CELL 3.2 & 3.3 SPLIT INTO QUADRANTS.
                                                                                                                                                         ONCE FLOW CAN BE CONVEYED TO BASIN
                                                                                                                                                         A MAXIMUM OF TWO QUADRANTS                                                         CLEAN WATER DRAIN
                                                                                                                                                         CONVEYED TO BASIN. OTHER QUADRANTS
                                                                                                                                                         CAPTURED OR DIRECTED TO CLEAN                                                      DIRTY WATER DRAIN
                                                                                                                                                         WATER DRAINS - TO BE DETERMINED
                                                                                                                                                         THROUGH CELL 3.2 & 3.3 DETAILED DESIGN
                                                                                                                                                                                                                                            PROPERTY BOUNDARY

                                                                                                                                                                                                                                            ACTIVE AREA

                                                                                                                                                                                                                                            AREA TO BE STABILISED




                                                                                                           CELL 1.1 AND 2.2 EXPANSION AREAS STABILISED
                                                                                                           AND DIRECTED TO CLEAN WATER DRAIN




                                                                                                                                                      NEW DIRTY WATER DRAIN
                                                                                                                                                      TO CONVEY ACTIVE RUNOFF
                                                                                                                                                      TO SEDIMENT BASIN




                                           TIEING IN CLEAN WATER DRAIN BATTER WITH
                                           CELL TRACK OR GRADING TRACK DRAIN INTO
                                           CLEAN WATER DRAIN WILL BE REQUIRED                                                                                                                                                                                  PROPOSED SEDIMENT BASIN




                                                                                                                                                                                                                                                CATCHMENT TO BASIN - 4.5 HA


                                                                                                                                                                                                                            INLET TO BASIN RL 21.1


                                                                                                                                                                                                      CLEAN WATER DRAIN




                                                                                                                                                                                                                                     CATCHMENT TO DRAIN - 6.2 HA
                                                                                                                                                                                                                                     (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                              CLIENT                                              PROJECT
   D       CELL NUMBER REVISION       KR         20/09/21            0                    40                                         COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT        KR         03/06/21                                                                        TOPO GROUP PTY LTD
                                                                                                                                                              DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN             KR         12/04/21
                                                                           SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                               ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE             KR         31/03/21                                                                MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 4
                                                                   NORTH
                                                                                          A3                             THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION            APPROVED BY     DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-05                  D

Page 47

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




APPENDIX B – BASIN CALCULATIONS




Environment. Engineering. Education.                                                                             PAGE 10

Page 48

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



1 YEAR ARI 24 HOUR TYPE A SEDIMENT BASIN

                                                                                                                                                                                                                                                                                            NUMBER
                                                                                                                  JAR TEST
                                                                       SETTLING                                                                                                                                                                          DECANT           DECANT               OF
                        CATCH                                                          DESIGN                      SETTLE          QA                QA        MINIMUM       MINIMUM                         ACTUAL                                                                                       EMPTY         FULL
                                       BATTERS          L:W             DEPTH                      IX yr, 24 hr                                                                               GOVERN                          DFW      MANUAL            NUMBER            HOLE             DECANTS
  BASIN ID               AREA                                                          EVENT                      AFTER 15     OPTIMUM           SELECTED         Vs            As                             VS                                                                                         SCOUR        SCOUR
                                        (1 IN X)       RATIO               DS                     (mm/hr)                                                                                     FACTOR                          (m)      DFW (m)             OF            DIAMETER           REQUIRED
                         (HA)                                                           (ARI)                     MINUTES       (L/s/ha)          (L/s/ha)       (m3)          (m2)                           (m3)                                                                                        CHECK        CHECK
                                                                          (m)                                                                                                                                                                             HOLES            (mm)              FOR QA
                                                                                                                    (mm)
                                                                                                                                                                                                                                                                                            SELECTED


  SW5                     4.5             2                 3            1.20            1           5.68            100             17             9            1662            486          VOLUME          1662            0.20           0.50             200             17              3.1          OK            OK




LEVEL SPREADER

                                                                                                                                                                                                                                                             WEIR




                                                                                                                                                                                                                                                                                            MIN. HEIGHT
                                                   CATCH AREA                                                           TIME OF CONC                                    FLOW - Q                                  SIDE SLOPE 1         U/S WATER                                                                  TOP WIDTH
  BASIN ID                                                                       ARI                  CARI                                           IARI                                BASE WIDTH                                                             FREEBOARD (m)               SPILLWAY TO
                                                      (HA)                                                                 (MINS)                                         (m3/s)                                     (1 in x)           LEVEL (m)                                                                    (m)
                                                                                                                                                                                                                                                                                              TOB (m)




  LEVEL SPREADER Q10                                   4.5                        10                   0.7                    15                    152                   1.33                  16                     2                      0.13                      0.3                    0.43                 17.73

  LEVEL SPREADER Q100                                  4.5                       100                  0.84                    15                     217                  2.28                  16                     2                      0.19                      0.3                    0.49                 17.96




EMERGENCY SPILLWAY

                                                                                                                                          WEIR                                                                             CHUTE                                                                    DISSIPATER



                                                                                                                   SIDE                                        MIN.                                                                                                                MEAN
                                                                 TIME                                                         U/S                                                                                                                    DEPTH           DEPTH
                         CATCH                                                           FLOW                     SLOPE                                       HEIGHT        TOP        LONG.           ROCK          MANNING         DESIGN                                        ROCK       WIDTH
                                                                  OF                              BASE                       WATER        FREEBOARD                                                                                                    OF             WITH                                WIDTH       LENGTH
  BASIN ID                AREA          ARI          CARI                       IARI      -Q                         1                                       SPILLWAY      WIDTH       SLOPE         SIZE - D50       ROUGH            VEL                                         SIZE -       1
                                                                 CONC                             WIDTH                      LEVEL            (m)                                                                                                    FLOW           F/BOARD                               2 (m)         (m)
                          (HA)                                                           (m3/s)                    (1 in                                      TO TOB        (m)        (m/m)           (mm)            COEFF          (m/s)                                         D50        (m)
                                                                (MINS)                                                        (m)                                                                                                                     (m)              (m)
                                                                                                                    x)                                          (m)                                                                                                                (mm)



  SPILLWAY Q100             4.5         100          0.7          15            217       1.90        15            2         0.17           0.3               0.47         16.90      0.25             93            0.087           1.24            0.10           0.40           100         17.2       17.4          2.1




Environment. Engineering. Education.                                                                                                                                                                                                                                                                                PAGE 11

Page 49

R0386A: NAMBOUR LANDFILL - STORMWATER MANAGEMENT PLAN




APPENDIX C
CONCEPT EROSION AND SEDIMENT CONTROL PLAN




Environment. Engineering. Education.                    PAGE 17

Page 50

                   CONCEPT EROSION AND SEDIMENT CONTROL PLAN
                           / STORMWATER MANAGEMENT
                          NOOSA LANDFILL EXPANSION




CLIENT: NOOSA SHIRE COUNCIL

DOCUMENT NUMBER: R1890

VERSION: IFC

DATE: 05/10/2021

Page 51

R1890: NOOSA LANDFILL EXPANSION – CONCEPT ESCP




1                INTRODUCTION
Topo was engaged by Noosa Shire Council (NSC) to prepare a Concept Erosion and Sediment Control Plan (CESCP) /
stormwater management approach for the Noosa Landfill Expansion project during construction of the proposed High-
Efficiency Sediment Basin, Clean Water Drain and Existing Cell Capping.

1.1.                OBJECTIVES & SCOPE

The objective of this CESCP is to provide an Erosion and Sediment Control Strategy that is in accordance with
Environmental Authority (Ref: EPPR01855314).

This plan describes a stormwater management strategy that could be utilised to comply with the requirements of the
Environmental Authority. For the bulk of the proposed works, runoff can be captured within work zones, therefore
limiting discharge to controlled releases through pumping. Due to the sensitivity of the receiving environment and the
requirements of the Environmental Authority, it is recommended that a capture approach be adopted where practical.
Where this cannot occur, management of stormwater and erosion and sediment controls measures are to be in
accordance with the requirements of the Environmental Authority.

This document is provided as a high-level strategy only. The Principal Contractor is to prepare a detailed Erosion and
Sediment Control Plan for the proposed works by a Certified Professional in Erosion and Sediment Control (CPESC). This
document is to include detailed calculations for drainage and sediment controls as well as proposed staging.

2                DETAILED ESCP AND ESC/STORMWATER MANAGEMENT
2.1.                LEGAL REQUIREMENTS

Stormwater runoff has the potential to cause water contamination and/or environmental harm and is regulated under
the Environmental Protection (EP) Act 1994. Some of the key legal requirements relevant to the operation of the waste
transfer station and management of the closed landfill include:

       +      Where stormwater conditions appear on an environmental authority, it is an offence under s.430 of the EP Act,
              to not comply with the conditions of approval. This includes anyone operating under the environmental
              authority e.g. contractors, consultants etc.
       +      Causing serious or material environmental harm is an offence under s.437 and s.438 of the EP Act respectively.
       +      It is an offence to cause an environmental nuisance under s.440. Environmental nuisance is unreasonable
              interference with an environmental value. It may also include an unhealthy, offensive or unsightly condition
              because of contamination.
       +      Under s.440ZG it is an offence to unlawfully deposit a prescribed water contaminant to waters. The most
              common prescribed contaminants resulting from poor stormwater management of ERA operations are:
                   + clay, gravel, sediment, stones and similar organic or inorganic matter
                   + building and construction materials
                   + building, construction and demolition waste
                   + putrescible waste
       +      Under s.319 an obligation is placed upon all persons in Queensland who are carrying out activities which may
              cause environmental harm to comply with the ‘general environmental duty’. This requires that all reasonable
              and practicable measures must be adopted to prevent and minimise environmental harm. Although not being
              able to demonstrate compliance against the general environmental duty is not an offence, demonstrating that
              all reasonable and practicable measures have been adopted is a defence for offences such as water
              contamination (EHP, 2014).

2.2.                GUIDELINES

The Principal Contractor is to prepare a detailed Erosion and Sediment Control Plan for the proposed works by a Certified
Professional in Erosion and Sediment Control (CPESC) that is in accordance with:
       +      Best Practice Erosion and Sediment Control (IECA, 2008)

Although the ESCP is to be prepared in accordance with the above document, the drainage and sediment control
standards are to be in accordance with the Environmental Authority as detailed in Section 2.3. The intent of the ESCP is
to ensure management of runoff from works areas is compliant with the Environmental Authority and water quality
release criteria.

Environment. Engineering. Education.                                                                                 PAGE ii

Page 52

R1890: NOOSA LANDFILL EXPANSION – CONCEPT ESCP



2.3.                KEY LICENSE CONDITIONS AND WATER QUALITY OBJECTIVES

A list of key licence conditions from the Environmental Authority relating to erosion and sediment control is provided
below.

The fundamental condition relating to erosion and sediment control is condition WT1 with a defined sediment basin and
drainage standard for temporary works




Figure 1 – Condition WT1 (Sediment and Drainage Control Standard)
Treated Runoff is to achieve the requirements of Condition WT2. Where runoff is to be discharged from site, the
superintendent is to be notified prior to release.




Figure 2 – Condition WT2 (Water Quality Release Criteria)




Environment. Engineering. Education.                                                                           PAGE 3

Page 53

R1890: NOOSA LANDFILL EXPANSION – CONCEPT ESCP



3                CONCEPTUAL STORMWATER STRATEGY
A conceptual strategy for each works areas is provided in Appendix A. The strategy adopted by the Principal Contractor
for the works may differ due to the proposed staging or construction methodology.

A summary of the conceptual strategy is provided below for each section of works:

       1.     Cell 1.1 & 2.2 Expansion – The bulk of works are in cut, so as works progress the areas will be self contained.
              During early works prior to significant excavation, the outer ends of the works are to be bunded to contain
              runoff.

       2.     Perimeter Road – The perimeter road is predominantly in fill. As fill is raised with the perimeter road, runoff can
              be directed into the excavation for the Cell 1.1 & 2.2 Expansion or into the excavation with the Clean Water Drain.
              Any batters that are outside of the holding areas should be progressively stabilised as fill is raised through the
              use of permanent measures or temporary measures such as soil binder.

       3.     Clean Water Drain – The drain is predominantly in cut. As works progress the downstream end can be left high
              so all runoff is contained within the excavation. It is not likely to be practical to divert external runoff away from
              the drain, so all runoff will be required to be captured within the work zone. As works progress to the
              downstream end of works where runoff cannot be contained, works are to be staged and rapidly stabilised
              prior to rainfall through the use of temporary or permanent measures.

       4.     Sediment Basin – The sediment basin is all in cut. As stripping occurs a perimeter bund can be placed around
              works prior to excavation occurring to self contain all runoff within the works area.

       5.     Capping Works (Southern Batter) – Dams are located along the toe of the southern batter. It is unclear if these
              dams have sufficient capacity to contain the required design event as a temporary sediment basin, however, if
              suitable could be utilised.

       6.     Capping Works (Western Batter) – The western batter can be directed to the existing High-Efficiency Sediment
              basin in consultation with the superintendent. Temporary drainage will be required to ensure runoff is directed
              to the basin.

3.1.                USE OF EXISTING DAMS / HES BASIN

The use of existing dams on site is to be requested and approved by NSC prior to works. The Principal Contractor and
NSC will agree on the following:

       +      Final state of dams – will clean out and treatment be required prior to project completion
       +      Agreed pump and dewatering locations to and from the holding dams
       +      Approved coagulant / flocculant product

The use of the existing HES basin on site is also to be requested and approved by NSC prior to capping works. The
Principal Contractor and NSC will agree on the following:

       +      Final state of basin – will clean out and treatment be required prior to project completion
       +      Agreed pump and dewatering locations to the HES basin
       +      Agreed catchment and/or flow rates to the basin
       +      Cost of operation / coagulant




Environment. Engineering. Education.                                                                                        PAGE 4

Page 54

R1890: NOOSA LANDFILL EXPANSION – CONCEPT ESCP




APPENDIX A
CONCEPT EROSION AND SEDIMENT CONTROL DRAWINGS




Environment. Engineering. Education.             PAGE 5

Page 55

                                                                                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                                              WORKS AREA

SW2 RELEASE POINT                                                                                                                         SW4 RELEASE POINT                                                                                                                                                   FLOW DIRECTION

                                                                                                                                                                                                                                                                                                              EXISTING FLOWPATH

                                                       EXISTING HES BASIN
                                                                                                                                                                                                                                                                                                              EXISTING FLOWPATH TO DAMS




                                                                            CELL 1.1 CAPPING -
                                                                            WESTERN BATTER




                                                                                                                                                                                                           EXISTING SW5 RELEASE POINT
                                                                                                                                                                                                                                                                        FUTURE SW5 RELEASE POINT
      EXISTING SITE DAMS                                                      CELL 1.1 CAPPING -
                                                                              SOUTHERN BATTER
                                                                                                                                                                                                           EXISTING SITE DAM




                                                                                                                            CELL 1.1 & 2.2 EXPANSION


                                                                                                                                               PERIMETER ROAD



                                                                                                                                                                                               SEDIMENT BASIN


                                                                                                                                                                           CLEAN WATER DRAIN




                                                                                                                                                                                                                               CLIENT                                               PROJECT
                                                                                                                              0                    80                                                                                          NOOSA SHIRE COUNCIL
                                                                                                                                                                                                     COPYRIGHT C                                                                                        NOOSA LANDFILL EXPANSION
                                                                                                                                                                                                 TOPO GROUP PTY LTD
                                                                                                                                                                                                                               DRAWN                   DESIGNED      DATE           DRAWING TITLE
                              B       REVISION FOLLOWING NSC COMMENTS                                  KR        16/09/21
                                                                                                                                    SCALE 1:4000                                        THIS DOCUMENT MAY NOT BE COPIED OR              KR                      KR      14/09/21              CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                                                                ISSUED FOR USE          TRANSMITTED IN ANY FORM OR BY ANY
                              A       ORIGINAL ISSUE                                                   KR        14/09/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                               RPEQ / SIGNATURE (IF REQUIRED)                                             WORKS AREAS
                                                                                                                            NORTH
                                                                                                                                                   A3                                   THE WRITTEN CONSENT OF TOPO GROUP                  CPESC - 5395, RPEQ - 15954               PROJECT No                     DRAWING No            REVISION
                           REVISION   DESCRIPTION                                                  APPROVED BY   DATE                                                                                 PTY LTD.                                                                                      20-0211                CESCP-01           B

Page 56

                                                                                                                                                                                                                                                            LEGEND

                                                                                                                                                                                                                                                                                    EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                    WORKS AREA


                                                                                                                                                                                                                                                                                    FLOW DIRECTION

                                                                                                                                                                                                                                                                                    EXISTING FLOWPATH


                                                                                                                                                                                                                                                                                    EXISTING FLOWPATH TO DAMS


                                                                                                                                                                                                                                                                                    BUND




                                                                                                                                                     CAPTURED WATER IN WORKED ZONE TO BE TREATED AND
                                                                                                                                                     DEWATERED IN-SITU OR AS AGREED WITH SUPERINTENDENT




                                             DURING STRIPPING, FORM LARGE BUND ACROSS CURRENT GULLY
                                             TO ENSURE WORKS AREA IS ENCAPSULATED UNTIL ADDITIONAL
                                             FILL IS PLACED TO FORM BUNDED ZONE (CAN INCORPORATE INTO
                                             PERIMETER ROAD FILL IF UNDERTAKEN AT THE SAME TIME)

                                                                                                                                                                                                                                         DURING STRIPPING, FORM LARGE BUND ACROSS CURRENT
                                                                                                                                                                                                                                         GULLY TO ENSURE WORKS AREA IS ENCAPSULATED UNTIL
                                                                                                                                                                                                                                         EXCAVATION OCCURS TO FORM SELF CAPTURED ZONE




                                                                                                                                                                                                   CLIENT                                                 PROJECT
                                                                                                          0                    20                                                                                  NOOSA SHIRE COUNCIL
                                                                                                                                                                         COPYRIGHT C                                                                                          NOOSA LANDFILL EXPANSION
                                                                                                                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                                                   DRAWN                   DESIGNED         DATE          DRAWING TITLE
   B       REVISION FOLLOWING NSC COMMENTS                              KR          16/09/21
                                                                                                                SCALE 1:1000                                  THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR         14/09/21             CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                                    ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                               KR          14/09/21                                                                  MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                          CELL 1.1 & 2.2 EXPANSION
                                                                                                        NORTH
                                                                                                                               A3                             THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                 PROJECT No                       DRAWING No          REVISION
REVISION   DESCRIPTION                                             APPROVED BY       DATE                                                                                   PTY LTD.                                                                                      20-0211                  CESCP-02         B

Page 57

                                                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                                                                          EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                          WORKS AREA


                                                                                                                                                                                                                                                                                          FLOW DIRECTION

                                                                                                                                                                                                                                                                                          EXISTING FLOWPATH

                                                                                                                                                                                                                                                                                          EXISTING FLOWPATH TO DAMS


                                                                                                                                                                                                                                                                                          FILL BUND


                                                                                                                                                                                                                                                                                          SEDIMENT FENCE




                                              GRADE FILL INTO EXISTING DRAIN - INSTALL                                                                                                                                                          EXISTING DAM COULD BE UTILISED FOR BATCH TREATMENT OF
                                              SEDIMENT CONTROL OR INCORPORATE INTO                                                                                                                                                              CAPTURED WORK ZONES (RUNOFF PUMPED TO DAM). NSC IS TO
                                              CAPPING WORKS SEDIMENT BASINS / CONTROLS                                                                                                                                                          BE NOTIFIED IF DAM IS TO BE UTILISED WITH AGREEMENT ON
                                                                                                                                                                                                                                                POST CONSTRUCTION RECTIFICATION TO BE UNDERTAKEN




                                                                                                                                                                                                  PLACE SEDIMENT FENCE AT TOE OF FILL. PROGRESSIVELY
                                                                                                                                                                                                  STABILISE FILL AND GRADE FILL BACK TO SOUTH TO HOLD IN
                                                                                                                                                                                                  CLEAN WATER DRAIN/ BEHIND PERIMETER ROAD FILL
PERIMETER ROAD ALL IN FILL. AS FILL IS RAISED - DIRECT
ALL RUNOFF INTO CELL EXPANSION WORKS TO BE
CAPTURED. SOUTHERN SIDE OF FILL TO BE                                           FILL CAN BE DIRECTED TO CELL EXPANSION CAPTURE OR
PROGRESSIVELY STABILISED WITH SOIL BINDER AS RAISED                             TO CLEAN WATER DRAIN HOLDING AREA DEPENDING ON
                                                                                WHICH WORKS ARE BEING UNDERTAKEN CONCURRENTLY




                                                                                                                                                                                                          CLIENT                                                PROJECT
                                                                                                                          0                    40                                                                         NOOSA SHIRE COUNCIL
                                                                                                                                                                                COPYRIGHT C                                                                                         NOOSA LANDFILL EXPANSION
                                                                                                                                                                            TOPO GROUP PTY LTD
                                                                                                                                                                                                          DRAWN                   DESIGNED       DATE           DRAWING TITLE
         B       REVISION FOLLOWING NSC COMMENTS                                             KR        16/09/21
                                                                                                                                SCALE 1:2000                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR       14/09/21              CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                                                    ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
         A       ORIGINAL ISSUE                                                              KR        14/09/21                                                      MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                          RPEQ / SIGNATURE (IF REQUIRED)                                            PERIMETER ROAD
                                                                                                                        NORTH
                                                                                                                                               A3                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                PROJECT No                     DRAWING No            REVISION
      REVISION    DESCRIPTION                                                            APPROVED BY   DATE                                                                        PTY LTD.                                                                                     20-0211                CESCP-03           B

Page 58

                                                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                              WORKS AREA


                                                                                                                                                                                                                                                                              FLOW DIRECTION

                                                                                                                                                                                                                                                                              EXISTING FLOWPATH


                                                                                                                                                                                                                                                                              EXISTING FLOWPATH TO DAMS


                                                                                                                                                                                                                                                                              BUND




                                                                                                                   EXISTING DAM COULD BE UTILISED FOR BATCH TREATMENT OF
                                                                                                                   CAPTURED WORK ZONES (RUNOFF PUMPED TO DAM). NSC IS TO
                                                                                                                   BE NOTIFIED IF DAM IS TO BE UTILISED WITH AGREEMENT ON
                                                                                                                   POST CONSTRUCTION RECTIFICATION TO BE UNDERTAKEN
                                                                                                                                                                                                                    AS WORKS PROGRESS TO NORTH WHERE BUNDING WILL
                                                                                                                                                                                                                    NOT CAPTURE RUNOFF, RAPIDLY UNDERTAKE WORKS AND
                                                                                                                                                                                                                    TURF PRIOR TO RAINFALL. IF TURF CANNOT BE PLACED,
                                                                                                                                                                                                                    APPLY TEMPORARY MATTING (JUTE) OR APPLY SOIL BINDER




       PROVIDE BUND DURING EARLY WORKS AT
       WESTERN END AS REQUIRED TO ENSURE
       NO RUNOFF CAN LEAVE WORKS AREA




                                                                                                                                                                                        ENSURE END OF CURRENT WORKS IS BUNDED (CAN LEAVE
                                                                                                                                                                                        SECTION HIGH WITH ALL EXCAVATION UPSLOPE). THIS WILL ALLOW
                                                                                                                                                                                        ALL RUNOFF FROM CLEAN WATER DRAIN TO BE CAPTURED.




                                                                                                                                                                                         CAPTURED WATER IN WORKED ZONE TO BE TREATED AND
       CONSTRUCT BUND IN GULLY IF PERIMETER                                                                                                                                              DEWATERED IN-SITU OR AS AGREED WITH SUPERINTENDENT
       ROAD IS NOT UNDERTAKEN CONCURRENTLY




                                                                                                                                                                      ADDITIONAL BUNDS MAY BE REQUIRED IN
                               NOT PRACTICAL TO DIVERT                                                                                                                UPSLOPE SECTIONS TO RETAIN ALL RUNOFF
                               EXTERNAL RUNOFF AROUND WORKS




                                                                                                                                                                                                CLIENT                                              PROJECT
                                                                                         0                    40                                                                                                NOOSA SHIRE COUNCIL
                                                                                                                                                                       COPYRIGHT C                                                                                      NOOSA LANDFILL EXPANSION
                                                                                                                                                                   TOPO GROUP PTY LTD
                                                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B        REVISION FOLLOWING NSC COMMENTS                       KR        16/09/21
                                                                                               SCALE 1:2000                                                THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      14/09/21             CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                              ISSUED FOR USE               TRANSMITTED IN ANY FORM OR BY ANY
   A        ORIGINAL ISSUE                                        KR        14/09/21                                                                       MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                         CLEAN WATER DRAIN
                                                                                       NORTH
                                                                                                              A3                                           THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                       DRAWING No          REVISION
REVISION     DESCRIPTION                                      APPROVED BY   DATE                                                                                         PTY LTD.                                                                                   20-0211                  CESCP-04         B

Page 59

                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                              WORKS AREA


                                                                                                                                                                                                                                              FLOW DIRECTION

                                                                                                                                                                                                                                              EXISTING FLOWPATH


                                                                                                                                                                                                                                              EXISTING FLOWPATH TO DAMS

                                                                                                                                                                                                                                              FILL BUND


                                                                                                                                                                                                                                              SEDIMENT FENCE
                                                           PLACE SEDIMENT FENCE AROUND TOE OF WORKS.
                                                           LOCATION WILL BE DEPENDENT ON CLEAN WATER
                                                           DRAIN BEING UNDERTAKEN CONCURRENTLY




                                                  ALL WORKS ARE IN CUT. TOPSOIL BUND CAN
                                                  BE PLACED AROUND WORK ZONE DURING
                                                  EALRY WORKS UNTIL AREA IS EXCAVATED




                                                                                                                                                                CLIENT                                              PROJECT
                                                                                0                    20                                                                         NOOSA SHIRE COUNCIL
                                                                                                                                      COPYRIGHT C                                                                                       NOOSA LANDFILL EXPANSION
                                                                                                                                  TOPO GROUP PTY LTD
                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       REVISION FOLLOWING NSC COMMENTS       KR         16/09/21
                                                                                      SCALE 1:1000                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      14/09/21             CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                          ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                        KR         14/09/21                                                       MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                           SEDIMENT BASIN
                                                                              NORTH
                                                                                                     A3                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                     DRAWING No            REVISION
REVISION   DESCRIPTION                       APPROVED BY     DATE                                                                        PTY LTD.                                                                                   20-0211                CESCP-05           B

The text continues on page 60.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.