Attachment 6 - Stormwater Management Plan
The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn LEGEND
EXISTING CONTOURS (0.5m)
CATCHMENT TO BASIN
CATCHMENT TO CWD
1 CATCHMENT LABEL
FLOW DIRECTION
EXISTING FLOWPATH
CELL 3.2 & 3.3 BEING CONSTRUCTED AND SELF
CONTAINED (NO FLOW TO BASIN). CAPTURED
RUNOFF CAN BE PUMPED TO HES BASIN CLEAN WATER DRAIN
DIRTY WATER DRAIN
PROPERTY BOUNDARY
ACTIVE AREA
AREA TO BE STABILISED
CELL 1.1 AND 2.2 TO
CAPACITY
BE EXPANDED.
REACHEDUNTIL WASTE IS
AND BEING
ABOVE SURROUNDING
CAPPED ANDGROUND
LANDSCAPED
LEVEL, CAPTURED
RUNOFF TO BE PUMPED TO LEACHATE TANKS
FINAL / TEMPORARY DRAINAGE PROPOSED SEDIMENT BASIN
PORTION OF CATCHMENT NOT LIKELY TO ENTER REQUIRED TO GRADE RUNOFF TO BASIN
CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
STOCKPILE COULD REMAIN AND CLEAN WATER
DRAIN CONTINUED ONCE STOCKPILE IS CATCHMENT TO BASIN - 3.2 HA
REMOVED. CATCHMENTS TO CLEAN WATER
DRAIN AND BASIN ARE ASSUMED WORST CASE
INLET TO BASIN RL 21.1
CLEAN WATER DRAIN
CATCHMENT TO DRAIN - 3.6 HA
(EXCLUDING OVERTOP FROM BASIN)
CLIENT PROJECT
D CELL NUMBER REVISION KR 20/09/21 0 40 COPYRIGHT C NOOSA SHIRE COUNCIL NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
C FINAL DESIGN REPORT KR 03/06/21 TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B NEW ATC DESIGN KR 12/04/21
SCALE 1:2000 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 31/03/21 STORMWATER MANAGEMENT - SOUTH
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
E REVISION TO NORTH OPTIONS KR 10/12/21 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) STAGE 3
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP CPESC - 5395, RPEQ - 15954 PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. 20-0211 CONCEPT-04 E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.