Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 OPTION C - NEW EAST-WEST HES BASIN                                                                                       PIPED OUTLET - RL 12.1 (REQUIRES FROG FLAP AS
                                                                                                                          BELOW Q2 FLOOD LEVEL). DOWNSTREAM END OF                                                                                                                                                        LEGEND
                                                                                                                          PIPE RL 12.0 AND THEN DRAINAGE CHANNEL TO
                                                                                                                          CONVEY FLOWS OFF SITE. PIPED OUTLET COULD                                                                                                                                                                               EXISTING CONTOURS (0.5m)
                                                                                                                          BE RAISED ABOVE Q2 FLOOD EVENT, HOWEVER,
                                                                                                                          THIS WOULD REQUIRE ADDITIONAL PAD FILL. BASIN                                                                                                                                                                           CATCHMENT TO BASIN
FLOOD LEVELS PROVIDED BY NSC:
                                                                                                                          WILL STILL OPERATE WITH DECANTS BLOCKED -
Q1 - 12.43
                                                                                                                          REFER TO SMP REPORT
Q2 - 12.44
                                                                                                                                                                                                                                                                                                                                                  HES BASIN
Q10 - 12.51
                                                                                                                          SPILLWAY RL 13.3 (WELL ABOVE FLOOD LEVELS)
Q100 - 12.59
Q100 CC - 12.64                                                                                                                                                                                                                                                                                                                                   BIO BASIN
                                                                                X
                                                                              RL 11.5
                                                                                                                                                                                                                                                                                                                                                  FLOW DIRECTION

                                   X                                                                                                                                                                                                                                                                                                              EXISTING FLOWPATH
                                 RL 12.5
                                                                                                                                                             X                                                                                                                                                                                    CLEAN WATER DRAIN
                                                                                                                                                           RL 13.5
                                                                                                                                                                                                                                                                                                                                                  DIRTY WATER DRAIN
                                                                                                                                                                  INFLOW RL 13.90
        BASIN BASED ON A SETTLING DEPTH OF 1.2m. WIDER,
        LONGER BASIN COULD BE UTILISED (DASHED LINE) AND                                                                                                                                                                                                                                                                                          PROPERTY BOUNDARY
        WOULD REDUCE SETTLING DEPTH TO 0.9m AND INFLOW
        AND PAD LEVEL FILL BY 0.3m                                                                                                                                                                                                                                                                                                                ACTIVE AREA

                                                                                                                                                                                                                                                                                                                                                  AREA TO BE STABILISED

                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                X                                                                                                                                                 EXISTING SURFACE LEVEL
                                                                                        TO GET THIS PORTION OF THE PAD BACK TO THE                                                                                                                                                                                            RL 13.5
                                                                                        INLET, LEVELS WOULD BE ABOVE RL 14.0 (ABOVE                                                           RL 13.5
                                                                                        MINIMUM FLOOR LEVEL), AND LIKELY CLOSER TO RL
                                                                                        15.0 TO HAVE A DRAIN GRADING FLOW BACK


                                                                                                                                                   X                                                                                                                                                                                                  X

                                                                                                                                                 RL 13.5                                                                                                                                                                                            RL 14.0




                                                                                                                                                                                                                               X
                                                                                                                                                                                                                            RL 14.0
                                                                                                                                                                                                                                                                                        X
                                                                                                                                                                                                                                                                                     RL 15.0



                                                             DRAINAGE AND PAD LEVELS TO BE                                  X
                                                             MODIFIED TO ACHIEVE INFLOW LEVEL OF
                                                                                                                          RL 14.0
                      X                                      NEW BASIN. WHERE DRAINS ARE USED,
                                                             PAD LEVEL LIKELY TO BE RL 15 OR HIGHER
                    RL 15.0

                                                                                                                                                                               X
                                                                                                                                                                             RL 14.0
                                                                     X
                                                                  RL 14.0




                                                                                                                                                                                                                           X
                                                                                                                                                                                                                         RL 17.0




                                                                                                                                                                                                                                                                    CLIENT                                              PROJECT
                                                D      CELL NUMBER REVISION                                                         KR          20/09/21            0                    20                                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                                C      FINAL DESIGN REPORT                                                          KR          03/06/21                                                                              TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                    DRAWN                   DESIGNED      DATE          DRAWING TITLE
                                                B      NEW ATC DESIGN                                                               KR         12/04/21
                                                                                                                                                                          SCALE 1:1000                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                                                        ISSUED FOR USE         TRANSMITTED IN ANY FORM OR BY ANY
                                                E      REVISION TO NORTH OPTIONS                                                    KR         10/12/21                                                                        MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                    RPEQ / SIGNATURE (IF REQUIRED)                                         PAD OPTION - EAST-WEST BASIN
                                                                                                                                                                  NORTH
                                                                                                                                                                                         A3                                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                        DRAWING No         REVISION
                                            REVISION   DESCRIPTION                                                              APPROVED BY     DATE                                                                                         PTY LTD.                                                                                   20-0211               CONCEPT-12C         E
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.