Original source · versioned page text
Attachment 6 - Stormwater Management Plan
The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn OPTION C - NEW EAST-WEST HES BASIN PIPED OUTLET - RL 12.1 (REQUIRES FROG FLAP AS
BELOW Q2 FLOOD LEVEL). DOWNSTREAM END OF LEGEND
PIPE RL 12.0 AND THEN DRAINAGE CHANNEL TO
CONVEY FLOWS OFF SITE. PIPED OUTLET COULD EXISTING CONTOURS (0.5m)
BE RAISED ABOVE Q2 FLOOD EVENT, HOWEVER,
THIS WOULD REQUIRE ADDITIONAL PAD FILL. BASIN CATCHMENT TO BASIN
FLOOD LEVELS PROVIDED BY NSC:
WILL STILL OPERATE WITH DECANTS BLOCKED -
Q1 - 12.43
REFER TO SMP REPORT
Q2 - 12.44
HES BASIN
Q10 - 12.51
SPILLWAY RL 13.3 (WELL ABOVE FLOOD LEVELS)
Q100 - 12.59
Q100 CC - 12.64 BIO BASIN
X
RL 11.5
FLOW DIRECTION
X EXISTING FLOWPATH
RL 12.5
X CLEAN WATER DRAIN
RL 13.5
DIRTY WATER DRAIN
INFLOW RL 13.90
BASIN BASED ON A SETTLING DEPTH OF 1.2m. WIDER,
LONGER BASIN COULD BE UTILISED (DASHED LINE) AND PROPERTY BOUNDARY
WOULD REDUCE SETTLING DEPTH TO 0.9m AND INFLOW
AND PAD LEVEL FILL BY 0.3m ACTIVE AREA
AREA TO BE STABILISED
X
X EXISTING SURFACE LEVEL
TO GET THIS PORTION OF THE PAD BACK TO THE RL 13.5
INLET, LEVELS WOULD BE ABOVE RL 14.0 (ABOVE RL 13.5
MINIMUM FLOOR LEVEL), AND LIKELY CLOSER TO RL
15.0 TO HAVE A DRAIN GRADING FLOW BACK
X X
RL 13.5 RL 14.0
X
RL 14.0
X
RL 15.0
DRAINAGE AND PAD LEVELS TO BE X
MODIFIED TO ACHIEVE INFLOW LEVEL OF
RL 14.0
X NEW BASIN. WHERE DRAINS ARE USED,
PAD LEVEL LIKELY TO BE RL 15 OR HIGHER
RL 15.0
X
RL 14.0
X
RL 14.0
X
RL 17.0
CLIENT PROJECT
D CELL NUMBER REVISION KR 20/09/21 0 20 COPYRIGHT C NOOSA SHIRE COUNCIL NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
C FINAL DESIGN REPORT KR 03/06/21 TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B NEW ATC DESIGN KR 12/04/21
SCALE 1:1000 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 31/03/21 STORMWATER MANAGEMENT - NORTH
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
E REVISION TO NORTH OPTIONS KR 10/12/21 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) PAD OPTION - EAST-WEST BASIN
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP CPESC - 5395, RPEQ - 15954 PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. 20-0211 CONCEPT-12C E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.