Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



1                INTRODUCTION
Topo was engaged by Noosa Shire Council (NSC) to prepare a Stormwater Management Plan (SMP) for the Noosa
Landfill. The site is located on Eumundi-Noosa Road as illustrated in Figure 1.

The site currently operates under the Environmental Authority Permit No. EPPR01855314 and is licensed to carry out the
following environmentally relative activities (ERA):

       +      ERA 33 – Crushing, milling, grinding or screening > 5000t per year
       +      ERA 60-(1a) – Waste disposal facility < 50,000t/yr




Figure 1 - Site Locality Plan (Source Google)

1.1.                OBJECTIVE & SCOPE

The objective of this report is to provide an Operational Stormwater Management Plan for the developed Master Plan
and construction staging. The Masterplan includes the augmentation of existing landfill cells as well as the construction
of new cells within the landfill site. Further details are provided throughout this report.

The objective of this SMP is to:

       +      Develop a formalised drainage and sediment control strategy that complies with the requirements of the
              Guideline Stormwater and environmentally relevant activities (DES, 2021), and the Environmental Authority Permit
              No. EPPR01855314

This report addresses surface water only and does not include the management of groundwater or leachate.

Environment. Engineering. Education.                                                                                   PAGE 1
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.