R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN
Figure 1 – XP Model for Drainage Assessment
5.1. RAINFALL
Modelling was undertaken for 10 % and 1 % Annual Exceedance Probability (AEP) storm events for durations between 15
minutes and 3 hours. Intensity Frequency Duration (IFD) data for the hydrologic modelling was obtained from the Bureau
of Meteorology website, and has been developed in accordance with Australian Rainfall and Runoff (ARR) 2016. The IFD
data is summarised in Table 2.
Table 2 – Intensity Frequency Duration Data
DURATION (mins) 10 % AEP (MM/HR) 1 % AEP (MM/HR)
15 152.0 217.0
20 133.0 191.0
25 119.0 172.0
30 108.0 158.0
45 87.1 129.0
60 74.2 112.0
90 59.0 90.7
120 50.1 78.1
180 39.8 63.3
5.2. PEAK FLOW RATE
A range of design storm durations was assessed to ensure the critical duration event was taken into consideration. The
Guideline - Stormwater and environmentally relevant activities (EHP, 2014) requires that high erosion hazard sites
implement the following design and management measures:
Environment. Engineering. Education. PAGE 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.