Original source · versioned page text
Attachment 6 - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (26.7 MB): may take a few minutes to open.
LEGEND
EXISTING CONTOURS (0.5m)
CATCHMENT BOUNDARY
1 CATCHMENT LABEL
FLOW DIRECTION
BIO FLOWPATH
PROPERTY BOUNDARY
OFFICE
POND SW4
SW4 BYPASS -
STABLE
CLEAN -
HES
INTERNAL
BASIN
CELL 2.2 TO
CLEAN - LEACHATE
EXTERNAL
SW5
CLIENT PROJECT
D CELL NUMBER REVISION KR 20/09/21 0 80 COPYRIGHT C NOOSA SHIRE COUNCIL NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
C FINAL DESIGN REPORT KR 03/06/21 TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B NEW ATC DESIGN KR 12/04/21
SCALE 1:4000 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 31/03/21 CONCEPT STORMWATER STAGING
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 31/03/21 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) OVERALL CATCHMENT PLAN
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP CPESC - 5395, RPEQ - 15954 PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. 20-0211 CONCEPT-01 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.