R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN
1 YEAR ARI 24 HOUR TYPE A SEDIMENT BASIN
NUMBER
JAR TEST
SETTLING DECANT DECANT OF
CATCH DESIGN SETTLE QA QA MINIMUM MINIMUM ACTUAL EMPTY FULL
BATTERS L:W DEPTH IX yr, 24 hr GOVERN DFW MANUAL NUMBER HOLE DECANTS
BASIN ID AREA EVENT AFTER 15 OPTIMUM SELECTED Vs As VS SCOUR SCOUR
(1 IN X) RATIO DS (mm/hr) FACTOR (m) DFW (m) OF DIAMETER REQUIRED
(HA) (ARI) MINUTES (L/s/ha) (L/s/ha) (m3) (m2) (m3) CHECK CHECK
(m) HOLES (mm) FOR QA
(mm)
SELECTED
SW5 4.5 2 3 1.20 1 5.68 100 17 9 1662 486 VOLUME 1662 0.20 0.50 200 17 3.1 OK OK
LEVEL SPREADER
WEIR
MIN. HEIGHT
CATCH AREA TIME OF CONC FLOW - Q SIDE SLOPE 1 U/S WATER TOP WIDTH
BASIN ID ARI CARI IARI BASE WIDTH FREEBOARD (m) SPILLWAY TO
(HA) (MINS) (m3/s) (1 in x) LEVEL (m) (m)
TOB (m)
LEVEL SPREADER Q10 4.5 10 0.7 15 152 1.33 16 2 0.13 0.3 0.43 17.73
LEVEL SPREADER Q100 4.5 100 0.84 15 217 2.28 16 2 0.19 0.3 0.49 17.96
EMERGENCY SPILLWAY
WEIR CHUTE DISSIPATER
SIDE MIN. MEAN
TIME U/S DEPTH DEPTH
CATCH FLOW SLOPE HEIGHT TOP LONG. ROCK MANNING DESIGN ROCK WIDTH
OF BASE WATER FREEBOARD OF WITH WIDTH LENGTH
BASIN ID AREA ARI CARI IARI -Q 1 SPILLWAY WIDTH SLOPE SIZE - D50 ROUGH VEL SIZE - 1
CONC WIDTH LEVEL (m) FLOW F/BOARD 2 (m) (m)
(HA) (m3/s) (1 in TO TOB (m) (m/m) (mm) COEFF (m/s) D50 (m)
(MINS) (m) (m) (m)
x) (m) (mm)
SPILLWAY Q100 4.5 100 0.7 15 217 1.90 15 2 0.17 0.3 0.47 16.90 0.25 93 0.087 1.24 0.10 0.40 100 17.2 17.4 2.1
Environment. Engineering. Education. PAGE 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.