Original source · versioned page text
Attachment 6 - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (26.7 MB): may take a few minutes to open.
R1890: NOOSA LANDFILL EXPANSION – CONCEPT ESCP 2.3. KEY LICENSE CONDITIONS AND WATER QUALITY OBJECTIVES A list of key licence conditions from the Environmental Authority relating to erosion and sediment control is provided below. The fundamental condition relating to erosion and sediment control is condition WT1 with a defined sediment basin and drainage standard for temporary works Figure 1 – Condition WT1 (Sediment and Drainage Control Standard) Treated Runoff is to achieve the requirements of Condition WT2. Where runoff is to be discharged from site, the superintendent is to be notified prior to release. Figure 2 – Condition WT2 (Water Quality Release Criteria) Environment. Engineering. Education. PAGE 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.