Log in to see the plans as drawn LEGEND
EXISTING CONTOURS (0.5m)
WORKS AREA
SW2 RELEASE POINT SW4 RELEASE POINT FLOW DIRECTION
EXISTING FLOWPATH
EXISTING HES BASIN
EXISTING FLOWPATH TO DAMS
CELL 1.1 CAPPING -
WESTERN BATTER
EXISTING SW5 RELEASE POINT
FUTURE SW5 RELEASE POINT
EXISTING SITE DAMS CELL 1.1 CAPPING -
SOUTHERN BATTER
EXISTING SITE DAM
CELL 1.1 & 2.2 EXPANSION
PERIMETER ROAD
SEDIMENT BASIN
CLEAN WATER DRAIN
CLIENT PROJECT
0 80 NOOSA SHIRE COUNCIL
COPYRIGHT C NOOSA LANDFILL EXPANSION
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B REVISION FOLLOWING NSC COMMENTS KR 16/09/21
SCALE 1:4000 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 14/09/21 CONCEPT EROSION AND SEDIMENT CONTROL
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 14/09/21 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) WORKS AREAS
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP CPESC - 5395, RPEQ - 15954 PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. 20-0211 CESCP-01 B